Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August 2011.

Slides:



Advertisements
Similar presentations
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
Advertisements

SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Michael Lehmann, DNV 12 March 2011 DOE view on the Validation and Verification Standards (VVS) Improve objectivity in the CDM - 7th CDM Joint Coordination.
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
PoA AFTER Cancun - READY TO TAKE OFF NOW
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
ITU Symposium on progressing the Climate Agenda through Green ICT standards, Seoul, September 19, 2011 Jean-Manuel Canet Senior Manager, Orange Business.
Best Practices on PoA Development Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
WP4 – Task 4.4 LCA Activities
The CDM: a review of its development and status of the carbon markets Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
TÜV SÜD Industrie Service GmbH SEVENTH CDM JOINT COORDINATION WORKSHOP BREAK-OUT SESSION MODULE Project cycle Streamline of process Eric Tolcach.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
ITU Green Standards Week, Rome, Italy, September 5 – 9, 2011 Jean-Manuel Canet, Orange Business Services Jean-Manuel Canet Senior Manager, Orange Business.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Second Regional Workshop on Capacity Development for the Clean Development Mechanism Review and Future Plan: Public Awareness and Capacity Development.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Template Contents of the Low Carbon Development Strategy (LCDS)
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
German Emissions Trading Authority (DEHSt)
DNV experiences and viewpoints
Overview of Standardized Baselines: concept, benefits, key facts
A simple tool to calculate the NDC Baseline and
Small-Scale Projects Under JI
CDM Activity Cycle under the Marrakech Accords
2019 CIRS survey: Methodologies to improve decision-making documentation during medicines development and review – gap analysis Do you think your current.
Presentation transcript:

Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August 2011

Topics 1.The CDM process 2.Baseline and additionality

The CDM Rules based mechanism Complex regulatory structures Many actors participating Transparency of processes Time consuming

Principles of the CDM Consistency Transparency Impartiality Independence Confidentiality

Basis of a CDM project CDM validation Precision Conservadurism Relevance Credibility Reliability Completeness

Overview of the CDM project cycle

The Project Design Document

A few important concepts Baseline scenario Baseline methodology Crediting period Additionality

Baseline in the CDM

A CDM project must use an approved baseline methodology Joergen will follow up on these !

A CDM project is additional … If GHG emissions are reduced below those that would have ocurred in the absence of the registered project activity PPs have to write explanation on how and why the project is additional and therefore not the baseline scenario in accordance to selected baseline methodology There are tools and approaches available for the demonstration of additionality

Additionality

Tool for determination of additionality in the CDM Small scale projects should use barrier analysis Projects under 5 MW can use expedite process

Additionality for renewables under 5 MW

Validation and additionality

So … Be prepared Follow through Be patient

Thanks!