Analysis of ATC Communication messages Relevant to Altitude Change Requests Electronic Navigation Research Institute IPACG/39, 5-6 February 2014, Fukuoka,

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
ATS DATALINK CENTRAL REPORTING AGENCY ACTIVITIES
An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
SOCM-2 Seminar Data Link Benefits Presented By: Dennis Addison, FAA
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues 30 Nautical Mile (NM) Lateral / Longitudinal Distance-based.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
IP-20 Review of the Effectiveness of Branching UPRs from PACOTS Track 2 Electronic Navigation Research Institute The IPACG meeting 40, Sep. 2014, Washington.
Interpreting RCP/RSP and Monitoring Results
#4908.If, while in level flight, it becomes necessary to use an alternate source of static pressure vented inside the airplane, which of the following.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
“Established on RNP” Jeff Williams – IATA
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
6. COMMUNICATIONS Radio Telephone (R/T) and Radio Navigation (R/N) services R/T Communications English is the standard language for all commercial flights,
Air Law 1.05 Airspace References: FTGU pages TC AIM.
USING PBN in UPR APPLICATION, SUCCESS and LESSONS LEARNED
DARP.
Presented to: By: Date: Federal Aviation Administration Developing a Roadmap to Success What’s Needed to Support UPRs The 9 th Pacific Project Team Meeting.
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP09: LOST FUEL SAVINGS DUE TO LACK OF.
JCAB and FAA Joint Paper IP/12 UPR and PACOTS Update.
Normal and Emergency Communication Procedures
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
AIR TRAFFIC ROUTES.
Chapter 5:intrument flight rules
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
1 Canadian Implementation of ADS-B Out Presentation to ASAS TN2 14 April 2008 Jeff Cochrane Manager, CNS Service Design.
Presented by Joël Morin to Space Weather Workshop 2008.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH.
CPDLC / ADS Operations 4/22/2017 2:35 PM
Recite a prayer…(15 seconds)
Role of ATFM in managing adverse weather conditions Collaborative approach with neighbors & the role of cross border ATFM A B Chattoraj & A B Joshi, Airports.
Leading Cadet Training
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASSTAR Airborne Separation Operations in Oceanic Airspace Bob McPike, NATS ASAS-TN2 Conference Glasgow, September 2006.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
CPWG 16 NAV CANADA Update December 3-6,  Private, non-share capital company  2nd largest ANSP in the world  12 million aircraft movements annually.
Federal Aviation Administration Presented To: IPACG/40 Date: September 8-12, 2014 IP8: Lost Fuel Savings due to lack of RNP4/FANS Equipage.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
1 International Flight Operations Efficiency Enhancements: Oceanic Navigation and the North Atlantic Track System (NATS) Presented by Frank Ketcham.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Performance-Based Communication and Surveillance (PBCS)
Vertical, lateral separations based on time / distance
Required Communication Performance (RCP)
longitudinal separations based on time / distance
Performance-Based Communication and Surveillance (PBCS)
New Automation System Delivers FANS-1/A Benefits
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Rome November 2008 Johan Martensson, CASCADE
Regional RAIM Prediction System – Progress Report
FANS 1/A over Iridium (FOI)
Oceanic and International Operations
Oceanic and International Operations
Data Link Advanced Operations
ASEAN PBN Routes Objectives:
GAUTENG AIRSPACE PBN PLAN
Oceanic and International Operations
1. Where do you think hurricanes occur. Claim: answer the question 1. Where do you think hurricanes occur? Claim: answer the question! Evidence:
RNAV and RNP Strategy in Japan
Oceanic and International Operations
“Established on RNP” Jeff Williams – IATA
Long term vision for Air Traffic Systems CARATS
Presentation transcript:

Analysis of ATC Communication messages Relevant to Altitude Change Requests Electronic Navigation Research Institute IPACG/39, 5-6 February 2014, Fukuoka, Japan

The most of flights over the Pacific Ocean are long range flight, so pilots request a change to economic altitude with light weight due to fuel consumption other than caused by weather conditions. For the purpose of measure how much operators’ demand flight being approved, we analyzed ATC communication messages relevant to altitude change requests in oceanic control airspace within Fukuoka FIR. Introduction

ATC: CLIMB TO AND MAINTAIN FL350 PILOT: REQUEST CLIMB TO FL350 Pilot Request Altitude Change We analyzed “Unable” reply ratio ; the ratio of number that the first reply is “Unable” to number of pilot’s request of altitude change, as an indicator of how operators’ demand flight being approved. PILOT “Request [change altitude].” ATC “Unable due to [reason].”

Target period /22~6/28, 8/17~8/23, 12/21~12/ /15~2/21, 6/21~6/27, 8/16~8/22, 12/20~12/ /21~2/27, 7/4~7/10, 9/5~9/11, 11/7~11/ /9~1/15, 7/9~7/15 TOTAL 91 days Analysis of ATC Communication Messages CPDLC message were analyzed. 17,486Altitude change request message 4,383The first answer was “Unable” 92% Climb 5% Descent 3% Block Altitude change request “Unable” reply ratio is25%

“Unable” reply ratio of each city-pair No. Altitude Change Request No. “unable” reply “unable” reply ratio From Japan Japan → North America % Japan → Alaska % Japan → Hawaii % Japan → South Pacific % Japan → South-east Asia % For Japan North America → Japan % Alaska → Japan % Hawaii → Japan % South Pacific → Japan % South-east Asia → Japan % Over Flight South-east Asia → North America, Alaska, Hawaii % East Asia → North America, Alaska, Hawaii, South Pacific % North America, Alaska, Hawaii → South- east Asia % North America, Alaska, Hawaii, South Pacific → East Asia %

Manila A Radar coverage ATS Data link airspace High “unable” reply ratio Reference: AIP Japan “Unable” reply ratio Japan to South-east Asia 41% South-east Asia to Japan 34% Airway A590 ( extending to the southwest of Japan) Available Both direction flight

High “unable” reply ratio Japan > Hawaii SE Asia – N America Other Around 17Z a day of July 2012 TOKYO 27N165E Around 15Z a day of May 2012 TOKYO 27N165E “Unable” reply ratio Japan to Hawaii 37% Route configuration Cross the route of South east Asia – North America flight route, especially in summer Around 15Z a day of Jul E

Analysis of ATC Communication Messages In 2008, economic crisis was occurred in the world. Traffic volume temporarily dropped. However, traffic volume recovered since around Follow the recovery in traffic volume, rate is higher gradually.

Correlation, Unable reply ratio and Traffic Volume Traffic No.

PositionDAY1DAY2 Same direction/same track 2737 Same direction/cross track55 Same direction /converging track34 Opposite direction/same track03 Opposite direction /cross track37 Opposite direction /converging track02 Unidentified*222 TOTAL6059 Positions with Related Aircraft Same track Cross track Converging track *Unidentified Unfound the related aircraft cause for “unable”. It is thought that securing altitude for the strategic reason or results from a coordination with neighboring ANSPs. The related aircraft fly the same track in the same direction in most of case. Flights on the same track with same altitude are affected longitudinal ATC separation.

Aircraft 1RNP10, D/L Aircraft 2Neither RNP nor D/L Required 10 minutes (80NM) separation Aircraft 1RNP10, D/L Aircraft 2Neither RNP nor D/L Required 10 minutes (80NM) separation Aircraft 1RNP4, D/L Aircraft 2RNP4, D/L Required 30NM separation Aircraft 1RNP4, D/L Aircraft 2RNP4, D/L Required 30NM separation 40NM Aircraft 1 FL330 Aircraft 2 FL340 40NM Aircraft 1 FL330 Aircraft 2 FL340 Aircraft 1: Request climb to FL350 ATC: Unable, due to traffic ATC: Climb to and maintain FL350 Aircraft 1: Request climb to FL350 Effect of PBN If performance specification were improved, possibilities of taking an optimal altitude will increase.

DAY1DAY2 Altitude change will be available if specification improve to RNP Altitude change will be available if specification improve to RNP4 35 Number of “Unable” reply6059 Effect of PBN If the performance requirements of aircraft that altitude request did not answered have been improved? One-quarter (1/4) of request which response was “Unable”, had possibilities to be answered their request. There is a capability to reduce “Unable reply ratio” if more aircraft improve their capabilities. Response is “Unable”

Up to this point, the result came from CPDLC message. So, How is “unable reply rate” about all message including HF message? *Count from Flight Plans 2013/Feb, Mar, Apr

“Unable” reply ratio CPDLC and HF Analyzed day 20132/4~2/10, 3/4~3/10, 4/1~4/7 TOTAL 21 days Altitude change request message “Unable” reply“Unable” reply ratio CPDLC4,0701,04126% HF1, % TOTAL5,2951,44227% CPDLC is required to apply reduce separation minima. This result showed the effectiveness of the reduced separation minima for altitude change requests.

“Unable” reply ratio CPDLC and HF With the increase in traffic volume, “unable” reply ratio is high. In most of the time, HF indicating a high “unable” reply ratio than CPDLC.

Conclusion  The “unable” reply ratio in the Ocean airspace within the Fukuoka FIR was analyzed.  The ratio was related to the route configuration and traffic volume.  Most of the related aircraft fly the same track in the same direction.  About a quarter of the cases in which replies to altitude change requests were “unable”, their requests were approved when their capabilities improved.  There is possibility to reduce the “unable” reply ratio if more aircraft had the data link and improved navigation performance such as RNP4.

VALID UTC Apr 2013 VALID UTC Apr 2013 VALID UTC Apr 2013 Reference: JMA FBJP chart No. of altitude change request (South Pacific => Japan) Cumulative number of 7 days Flights in bad weather area, the altitude change is requested frequently. For many of the flights between Japan and South Pacific is a non-data link aircraft, it can not be used for reduced separations. Flights in bad weather area, the altitude change is requested frequently. For many of the flights between Japan and South Pacific is a non-data link aircraft, it can not be used for reduced separations. South Pacific ⇒ Japan 22UTC ( Feb. Mar. Apr. ) South Pacific ⇒ Japan 22UTC ( Apr. ) 29 % 43 % Altitude change request in Bad Weather