2012 HKM Annual Conference Report State of SPHAC Report Status of New Building Project July 22, 2012
Hmong District 34 th Annual Conference July 1 – 6, 2012 Hyatt Regency Harbor Blvd Garden Grove, CA 92840
Picture of people from SPHAC here
Delegates & CorrespondingCount Delegates294 Corresponding142 Alliance Men Delegates72 Alliance Men Corresponding21 Alliance Women Delegates117 Alliance Women Corresponding93 TOTAL739
GuestsCount National Office1 Australia4 French Guiana2 Canada4 Toccoa Falls2 Simpson3
DaySessionTopicSpeaker Sunday, July 1EveningThe Call to ActionKx. Xeev Neeb Hawj Monday, July 2 MorningThe Call to PrayerKx. Nyiaj Vaj Vaj EveningThe Call to Unite the Churches in ChristKx. Tswv Txos Thoj Tuesday, July 3 MorningThe Call to be a WitnessXf. Tswv Foom Yaaj Evening The Call to Action in Discipleship Making Kx. Ntsab Ntxawg Xoom Wednesday, July 4 MorningThe Call to Action in GivingKx. Ntsuab Pov Hawj EveningThe Call to Action in HarvestKx. Ceev Xwm Hawj Thursday, July 5 MorningThe Call to Action in Spiritual GrowthKx. Laj Neeb Xyooj EveningThe Call to Surrender to ChristKx. Txawj Teeb Thoj Friday, July 6MorningThe Call to Action in CommitmentKx. Vam Neeb Yaj
All the workshops occurred on Monday, July 2 Workshops: Disciple Making Process (Rev. Del Edwardson) Constitution, Bylaws, & Policy (Rev. Rosilio Roman) – Kl. Ntsuab Nplooj Vaj Church Government (Kx. Xeev Neeb Hawj) – Kl. Tubmuas Lis Church Tax & IRS Law Update (Maiv Hawj) – Kl. VamPhiab Sunday School (Kx. Tswv Txos Thoj) Short Term Missions (Kx. Ntshab Ntxawg Xoom) – Kl. Zaam Nplooj Vaaj OTS (Kl. Xeev Nruag Xyooj) – Kl. Ntsuab Vaj Lauj
Created new nominating procedure Nominee/candidate has to fill biography sheet Set of questions to interview candidate Set of questions to interview a reference Worked very hard to come up with the procedure. Often work late into the night and during the day when others attending service or business sessions to get ready. Really good results from this Committee
DEXCOM Treasurer: Kl. Ntsablug Xyooj (Sacramento, CA) Txwjlaug: Kl. Vaam Npis Yaaj (HAAC, St. Paul, MN) Xibhwb: Kx. Nyiaj Vaj Vaj (Hickory, NC) Xibhwb: Xf. Vaam Txus Xyooj (Appleton, WI) Men’s Ministry Txooj Neeb Xyooj – San Diego, CA Alliance Women N. Xeev Pov Xyooj – Stockton, CA
Six General Council Representative 1. Num Cawv Xyooj (Auburn, GA) 2. N. Nkias Pov Tsab (San Diego, CA) 3. N. Ntsablug Xyooj (Sacramento, CA) 4. Jabcob Yaaj (St. Paul, MN) 5. Xh. Jimmy Yaaj (Wausau, WI) 6. Xf. Tsaav Txhaj Hawj (Denver, CO)
Kl. Ntshablug Xyooj (Chair) – Sacramento, CA Kl. Tsavntxawg Hawj (Secretary) –Milwaukee, WI Kl. Txooj Vaj Muas (Member) – Leola, PA Kl. VamPhiab Vaj (Member) – St. Paul, MN Xh. Albert Vaj (Member) – Seatle, WA Xf. Vaam Xwm Yaaj (Member) – Milwaukee, WI Fwm Thoj (Member) – Auburn, GA This committee worked very hard to come up with the budget. As happened in the past, the committee members were appointed by DEXCOM at the conference, not before the conference started. Thus has incomplete information.
2013 Budget $1,698, % decrease from 2012 Budget
Good attendance Not a lot of debates on issues at hand Time spent on each issue went a lot smoother Not a lot of business items to discuss No leadership trainings for the leaders to learn and take home to implement Sermons were not strong and connect well with the theme A lot of information, but not practical to take home and implement More praise and worship bands Invite other guest speakers More breakout sessions
Hyatt Regency Schaumburg, Chicago 1800 East Golf Road, Schaumburg, Illinois, USA Phone: Fax: June 30-July 5, 2013
2012 HKM Annual Conference Report State of SPHAC Report Status of New Building Project
No.GoalsAccomplishment% Accomplished 1CLASS % 2CLASS % 3CLASS % 4CLASS % 5Life Groups %
PRODUCTIVITY: Slowed down in discipleship growth because lack of man power to keep up with the training, placement and data maintenance. Need to improve these three areas in order to keep growing. ENERGY: Overall passion for growth dropped and slowed down because of inability to keep productivity above going. However, members desire to grow still strong. Attendance for Sundays and Wednesday services are still strong, given that we are in the summer months. MORALE: High at beginning of quarter, but dipped toward summer months. Spiritual morale still very high; however, organizational morale is down a little. We need to get our new building going.
GROWTH: TITHE: First Indicator of Growth IncomeQ1Q YTD2012 Projected Tithe180, , , , Loose12, , , , New Building88, , , , TOTAL281, , , ,122, Actual2012 Projected2011 Actual Tithe$357,218$714,436$574,745 Tithe only for 1 st Half of 2012 NOTE: $139,691 projected increase from 2011, or 24.3%
GROWTH: MEMBERSHIP: Second Indicator of Growth Q1Q YTD2012 Projected New Believers Transfer Total Families Total individuals Growth Rate12.8%3.9%8.4% Note: “Fit churches average around ten percent growth each and every year, while healthy churches may grow between two and five percent a year.” ( Difference Members2,8903,012122
Balance Savings$196,040 Checking$588,992 TOTAL$785,032 Balance as June 30, 2012 Balance Loan #593000$20,232 Loan #618600$30,076 TOTAL$50,308
2012 HKM Annual Conference Update State of SPHAC Report Status of New Building Project
ADF Update We have been approved by ADF for a loan of $5,153,000. This includes: 10% contingency Our two current loans They require a reserve of $330,095. This reserve belongs to us. It earns us interest. It will be returned to us later.
ADF Update They require that we use a general contractor This means... We can no longer act as general contractor Vedi Assoc. will now function as architect only The OVERALL cost may be different than the $5,153,000 approved by ADF.
HKM DEXCOM Update The DS (Thawj Tsavxwm) has given us his approval to ADF HKM Dexcom has voted to approve of our new building project
What Remains to Be Done We need to finalize and choose a general contractor Vedi is aiming to get all drawings done by the 27 th of this July After this, the drawings will be submitted to City of Maplewood for final detail approval General Contractor for bidding
What Remains to Be Done We need to get a “guaranteed maximum cost” from general contractor to ADF ADF gives approval for final loan amount (because of the involvement of the GC). Our timeline is to be able to break ground late summer or early fall
Financial Update One-Time Pledge Monthly Pledge # CommittedPromisedReceivedRemaining 118$298,825$142,231$156,594 # CommittedPromisedReceivedOver 552$40,170$97,121$56,951
Dr. Karen Otazo in her book The Truth about Being a Leader says there are three keys to effective communication: 1. What’s Happening … 2. What’s Coming Up … 3. How We’re Doing …