1 TAC Review of PRR 650 August 3, 2006. 2 Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.

Slides:



Advertisements
Similar presentations
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
EIUG – Wheeling Methodologies
Loads Acting as a Resource Relationships with QSEs and LSEs
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
On Target Group Coaching
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Board of Directors Credit Aspects of Mass Transition.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
PRS Response to Steel Companies’ Appeal of NPRR’s 351 and 378 Tom Payton on behalf of PRS August 4, 2011 Disclaimer: This response attempts to capture.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 TAC Report to the ERCOT Board February 21, 2006.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
1 TAC Report to the ERCOT Board February 16, 2005.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
QSE Managers Working Group Report to WMS September 19, 2007.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Wind Management at MISO
TAC Report to the ERCOT Board
Generation Expansion Daniel Kirschen
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

1 TAC Review of PRR 650 August 3, 2006

2 Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only one time for the Ancillary Services needed for reliability reasons and to ensure that PRR 650 is the best way to ensure reliability.” Source: Draft minutes of ERCOT Board Meeting of June 20, 2006

3 PRR 650 Action Report The ERCOT Board “voted to remand to TAC for further consideration of issues raised by BOD discussion: review calculation of MCPE and prices paid for non-spin to keep consumers balanced; study double dipping, clawback and economic fairness of payments; and complete economic analysis and determine whether PRR650 is the best way to encourage new generation.” Source: PRR 650 Action Report dated June 23, 2006

4 NSRS Bidding In return for a capacity payment, a QSE agrees to the following “risk and opportunity” costs: –Use of the Resource if needed to supply their own capacity shortfall (e.g., loss of a unit), –Use of the Resource for its own profit (when market conditions are favorable) and –Possibility that MCPE will be less than the Resource’s energy cost. Corrected MCPE price signal will result in lower NSRS offer prices.

5

6 What PRR 650 Does Adjusts MCPE when NSRS is deployed by removing NSRS deployments from the bid stack and manually re-running Scheduling, Pricing and Dispatching (SPD) algorithm to determine a new MCPE for that interval. Requires ERCOT to provide a notice to the market when NSRS is deployed and when NSRS deployment is discontinued.

7 Board Concern About Double Counting NSRS capacity payment covers lost “risk and opportunity” costs but not the operating cost of the Resource NSRS energy payments (MCPE) only cover the cost of operating the Resource (possibly with some profit) Capacity and energy are separate products with separate compensation PRR 650 does NOT create double-dipping; therefore, no “clawback” is necessary

8 Analysis Study period: June 2005 through May 2006 (12 months) Estimated MCPEs assuming PRR 650 was in- place for the entire period (based on actual MCPEs for the period) Used the Peaker Entry Test (PET) model developed for PUCT Project No , the rulemaking on resource adequacy and market power in ERCOT Applied estimated MCPEs to the PET model to determine if PRR 650 would allow a peaker to make enough money to stay in the market

9 Analysis (Continued) 3 Scenarios were run: 1.Actual MCPEs (no adjustment for PRR 650) 2.MCPE adjusted for PRR 650 – with MCSM 3.MCPE adjusted for PRR 650 – without MCSM Calculate Annual Net Margin (ANM) for a hypothetical peaking unit Compare ANM to Target Annual Net Revenue (TANM) to determine if the peaking unit would recover all its annual fixed costs to break even

10 Results The hypothetical peaking unit would lose more money without the PRR 650 adjustment to MCPE The current NSRS deployment suppresses scarcity prices in contrast to PUCT policy, resulting in peaking generation disinvestment in ERCOT

11 Results

12 Benefits of PRR 650 to the Market and Consumers Affect the market in a positive way by reducing energy price risk for NSRS while sending the right price signal to the whole market In the near-term, reduced risk to providers of NSRS will result in lower NSRS capacity prices as providers remove risk premium from their NSRS offers In the long-term, reduced risk will also entice additional capacity to the market thereby improving reliability The impact to MCPE will be relatively minor because of the limited number of NSRS deployments (1.5% of the intervals for the 12 months ending May 31, 2006)

13 Historical Impact of PRR 650

14 Forward Impact of PRR 650