1 4 th Biennial Rosenberg International Forum on Water Policy Turkey,7-8 th September,2004 Overview of the Nile Basin Initiative Programs. by Patrick Kahangire,

Slides:



Advertisements
Similar presentations
Scaling-up the UNDP-UNEP Poverty and Environment Initiative January 2007 environment for the MDGs.
Advertisements

Global Implementation Strategy for SEEA
Water seminar Brussels, July 2010 Lessons on transboundary cooperation A. Liebaert, DG DEV/B/1.
European Union Strategy for the Danube Region (EUSDR) -- A World Bank Perspective High-level Meeting on Financing Belgrade, September 27 th, 2010.
World Bank and the GEF – Land Degradation GEF Expanded Constituency Workshop 1 to 3 November 2011 Cape Town, South Africa.
Building Statistical Capacity To Monitor Development Progress World Bank Development Data Group.
World Bank Financial Management Sector September 2010.
Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
1 4 th Rosenberg Biennial International Forum on Water Policy. Transboundary Water Cooperation The Nile Basin Case by Hon. Martha Karua Minister for Water.
Current Context and Evolution towards Institutional Strengthening Nile Basin Initiative International Workshop on Institutional Capacity Development in.
Hydropower Development: Experience of Nepal
Sharing Benefits of Transboundary Waters through Cooperation David Grey The World Bank International Conference on Freshwater Bonn, 2001.
“The Nile Basin Initiative" (NBI) Meraji O. Y. Msuya Executive Director, NBI Secretariat Freshwater Basin Management: Experiences and Lessons Learnt.
Nile River Basin Nile Sudd Swamp Blue Nile White Nile
Roles of National/Global Platforms
PRESENTATION TO THE MOLE CONFERENCE, CHANCES HOTEL, 15 JULY 2009 YIGA BAKER M ANEW REGIONAL COORDINATOR EASTERN AFRICA.
System of Environmental-Economic Accounting SEEA-Energy Implementation United Nations Statistics Division Oslo Group Meeting September 2013 Baku,
HIV/AIDS COORDINATION AND FAITH BASED ORGANISATIONS: EXPERIENCES FROM UGANDA JOHN RWOMUSHANA, MD, MSc Director, Research and Policy Development UGANDA.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
THE NILE RIVER BASIN : PUBLIC PARTICIPATION CHALLENGES AND OPPORTUNTIES By Aly M. Shady, P.Eng. For Presentation At University of Virginia Law School Charlottesville,
The Utilization of the Nile Waters: A Shift from Position to Interests
The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.
Nile Basin Conflict And Its Commercial Impact Mahmoud ElMassry Tarek El Rayes Ahmed Abd Tawab Dalya Nayal.
Nile River Basin – Case Study Elaine B. Darby CE 397 Fall 2005.
NILE BASIN INITIATIVE BACKGROUNDByA.M.FARAHAT. THE ISSUE  Nile water agreements between Egypt and the British date back more than 100 years.  Core objective:
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
Addressing water management challenges in Nile Basin  Key to achieving the SDGs 11 countries with total population over 415 Million  doubling every.
Cooperation on Transboundary Waters: A Challenge for Europe and Other Regions of the World Dr. Stephen F. Lintner World Bank.
INTOSAI Capacity Building Committee Meeting Stockholm, 8-10 September 2015 SAI capacity from a Post-2015 development agenda perspective The PASAI cooperative.
Integrating Environment and Development: The World Bank’s Experience with Country Environmental Analysis (CEA) Presented at the GEF Sub-Regional Workshop.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative Istanbul May 3-5, 2011.
Roles of GEF National Focal Points & Experiences in GEF Coordination and Integration Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland,
8 TH -11 TH NOVEMBER, 2010 UN Complex, Nairobi, Kenya MEETING OUTCOMES David Smith, Manager PEI Africa.
Transboundary Water Cooperation & Climate change Some important points.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
-0- June 2006 EU Infrastructure Trust Fund. The EU - Africa Partnership on Infrastructure and the Trust Fund Antonio Garcia Fragio Head of Division Transport,
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
Elements of an Effective Regional Strategy for Development of Statistics - SADC Ackim Jere SADC Secretariat Gaborone, Botswana PARIS 21 Forum on Reinforcing.
River Basin Management in Southern Africa Barbara Schreiner.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
WATER RESOURCES DATA FOR NILE BASIN By Dr. R.J. Mngodo, Water Resources Division, Ministry of Water & Livestock Development P.O. Box Dar es salaam.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
The Adriatic Sea Partnership: A pilot program for the Mediterranean “Extraordinary Meeting of MAP Focal Points” Side Event Catania, Italy 7 November 2006.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
CDP-GIZ research project – Paris Workshop Gesellschaft für internationale Zusammenarbeit GmbH André Lammerding, Head of Programme International Water Stewardship.
1 STRENGTHENING EXTENSION & ADVISORYSERVICE DELIVERY TOWARDS MEETING THE CHALLENGES OF THE 21 ST CENTURY The Critical Factors – The Kenya Experience BY.
"Learning and achievements of SWA Global platform and its relevance to achieving Hygiene and Sanitation Development in India" India WASH Summit 17 th February.
Complementary Financing for the Investment Case
OVERVIEW | NBD-Network
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
Joseph Karugia Coordinator, ReSAKSS-ECA
Overview Rationale Context and Linkages Objectives Commitments
Discourse Intelligence Network Empowerment Through Participation Towards Cooperation on the Nile. Hellen NATU Nile Basin Discourse.
KAMPALA EVALUATION TALK
KEEPING A DEVELOPMENT FOCUS: THE CHALLENGES IN ENSURING POLICY COHERENCE FOR DEVELOPMENT: A UGANDA’S PERSPECTIVE Presented by: Pius Bigirimana, Permanent.
Overview of Bank Water Sector Activities
Understanding the Global Water Crisis : Lessons from the Nile Basin Dr
Overview Rationale Context and Linkages Objectives Commitments
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
UNLOCKING ECONOMIC GROWTH & DEVELOPMENT POTENTIALS IN THE NILE BASIN: THE CASE OF TANZANIA
STAKEHOLDER PARTICIPATION AND TRANSBOUNDARY WATERS By Dr
The Role of Civil Society Forums in International River Basin Management – The Case of the Nile By Dr. Patricia Kameri-Mbote Presented at The Hague.
The Technology Mechanism of the UNFCCC
Presentation transcript:

1 4 th Biennial Rosenberg International Forum on Water Policy Turkey,7-8 th September,2004 Overview of the Nile Basin Initiative Programs. by Patrick Kahangire, Executive Director,Nile-Sec

The Nile Basin  Burundi  D.R. Congo  Egypt  Eritrea  Ethiopia  Kenya  Rwanda  Sudan  Tanzania  Uganda Key Challenges  Poverty,  History  demography(600 by2025,  Vulnerability  Economics-nothing flows  Degradation,... Opportunities Win-win development projects (food production, energy, transport, flood control, industrial growth, envir. Watershed, …

3 The Shared Vision “To achieve sustainable socio-economic development through equitable utilization of, and benefits from, the common Nile Basin water resources.”

4 Shared Vision Action on the ground Shared Vision Program Subsidiary Action Prog. Strategic Action Program for the Nile Basin Main Tasks  Create an enabling environment for cooperative investments and action on the ground, within a basin-wide framework.  Promote Shared Vision through a limited, but effective, set of sub-regional activities and projects. - NBI Policy Guidelines

8. SVP Coordination SVP Project Portfolio Common Elements Basin-wide engagement and dialogue Dev. Strategic & analytical frameworks Dev. Best practical tools & demost. Stakeholder involvement Human & institutional capacity FunctionType THEMATICTHEMATIC FACILITATIVEFACILITATIVE Project 1. Nile Transboundary Environmental Action 2. Nile Basin Regional Power Trade 3. Efficient Water Use for Agricultural Production 4. Water Resources Planning & Management 5. Confidence Building & Stakeholder Involvement 6. Applied Training 7. Socio-Economic Development & Benefit Sharing

6 Preparation of the SVP: Reaching Consensus on ‘The What’ NBI Policy Guidelines NBI Framework Priority Projects COM EndorsementICCON Project Concepts Project Documents ‘The What’ Working Group Meetings Donor Partnerships & Financing SVP Portfolio Feb 99 May 99 Dec 99 Jul 00 Mar 01 Jun 01 A complex, multi-country, participatory process

7 Project Management Units : Implementation Arrangement – Decentralized Approach EnvironmentSudan Power TradeTanzania AgricultureKenya Water ResourcesEthiopia Applied TrainingEgypt Confidence BuildingNile-SEC HQ Benefit Sharing Uganda/Nile- SEC HQ SVP Coordination ProjectNile-SEC

Rolling Out the SVP: Status

9 Subsidiary Action Programs  Investment projects planned at the lowest appropriate level - within the basin-wide framework  Aimed at poverty reduction, economic development & reversal of environmental degradation  Seeking win-win opportunities between riparian countries

10 Burundi Rwanda Tanzania KenyaEritreaEgyptSudanDRC Uganda Ethiopia Nile Equatorial Lakes sub-basin Eastern Nile sub basin Nile Basin (SVP, Cooperative Framework) Nile Basin (SVP, Cooperative Framework) Global (ICCON incl. International Discourse)

11 The Eastern Nile Subsidiary Action Program  Egypt  Ethiopia  Sudan The Technical regional Office (ENTRO) Established in Addis Ababa, Ethiopia, June 2002

12 Integrated Development of Eastern Nile Projects 1.Eastern Nile Planning Model 2.Baro-Akobo Multi-purpose water resources development 3.Flood Preparedness and Early Warning 4.Ethiopia –Sudan Transmission Interconnection 5.EN Power Trade Investment Program 6.Irrigation and Drainage 7.Watershed Management.

13 Nile Equatorial Lakes Region Subsidiary Action Program (NELSAP) BurundiRwanda DRC Sudan EgyptTanzania Kenya Uganda The Coordination Unit NEL-CU established Dec 2001 In Entebbe relocated to Kigali-Rwanda (Jan /04)

14 12 NELSAP Projects identified for preparation Environment & Natural Resources Management 3 River Basin Management Projects (Mara, Kagera, Sio- Malaba-Malakisi) Regional Agriculture project Fisheries & Catchment Management Project for Lake Albert and Lake Edward Water Hyacinth Abatement in the Kagera River Hydropower Development & Power Trade in the NEL region (Bur, DRC, Ken, Rwa, Tan, Uga) Rusumo Falls HEP (BUR, RWA, TAN) Ranking and Feasibility Study of HEPs in NEL-region Four Transmission interconnection projects: Ken-Uga; DRC-Bur-Rwa; Bur- Rwa; Uga-Rwa

15 Project Execution-SVP Promotes ownership: Nile-COM  Oversees portfolio & provides overall guidance on policy matters Nile-TAC  Reviews project portfolio and provides technical advice to Nile-COM Nile-SEC  Serves as executing agency with overall responsibility for project delivery on behalf of Nile countries through Nile-COM/Nile-TAC  Ensure integration, coordination, info-sharing and M&E

16 Financing Arrangements: Nile Basin Trust Fund (NBTF) Nile-COM, March 2001 decided:  Request to World Bank to establish Nile Basin Trust Fund (NBTF)  Preferred funding mechanism for SVP  Trust Fund Committee (riparian & donors)  Trust Fund administered by World Bank  Eventual transfer of TF to Nile Basin institution

17 Issues  Not all donors agree to use preferredTrust Fund arrangement;  Implementation process is long;  Not all priorities of governments are included and not all projects get financing;  The process and implementation coordination are costly, and high accountability standards;  High expectations & therefore priority for investment oriented projects (stakeholders tired of meetings and capacity building!)

18 Countries’ Contributions.  Contribute in kind to the SVP implementation equivalent to $14million plus Cash eg taxes  Continued to finance operating costs of the NBI Secretariat, TAC and COM.  Establishment and maintenance of national NBI Offices  Investment projects

19  A Shared Vision  Strong riparian ownership  Effective lead donor/partner  Partnership and commitment of donors/partners (funds, technical and facilitation)  Flexible financing mechanisms  Basin specific priorities based on the situation Critical Elements and Lessons

20  Staying with the process by incremental steps,  Multi-track approach to create incentives for the process and demonstrate benefits,  Adequate funding and investments for the process (time money, expertise, political, etc.) and coordination CRITICAL, Critical Elements and Lessons (continued)

21 Efforts and Strategies Initiate engagement Develop shared vision Setup institution Policies and guidelines Mobilise support and partners Set agenda and programs Sustain cooperation and partnerships Implement initial set of projects basin wide Stakeholder participation, confidence, capacity building, and plan investments Strengthen institutional arrangements Continue mobilising resources Fast track projects Major infrastructure $ 10 m grants $ 150 m grants 1- 2 bn $ 5 + bn $

22