Marlene Gross Ackeret, PBIS TAC Lori Cameron, PBIS TAC.

Slides:



Advertisements
Similar presentations
Build Teams that Pull Together Not Apart: An overview of the Five dysfunctions of Teams TLC Conference March 2010.
Advertisements

CESA 1 Coach Networking Wisconsin PBIS Network/RtI Center Regional Technical Assistant Coordinators: Marlene Gross Ackeret Lori Cameron Tier 1.
Albany Unified School District Strategic Plan Board Study Session June 21, 2011.
Welcome! October VTPBiS Regional Coordinators Meeting.
The Role and Expectations for School-wide PBS Coaches Rob Horner and George Sugai OSEP TA-Center on PBS Pbis.org.
MARY BETH GEORGE, USD 305 PBIS DISTRICT COORDINATOR USD #305 PBIS Evaluation.
Coaching: Tier 2 and 3 Rainbow Crane Dr. Eleanore Castillo-Sumi.
TOGETHER EVERYONE ACHIEVES MORE
PBIS Coaches Training Day 3. Coaches Training Day 4 Follow-up from Coaches Training Day 3 The Why? Preparing your teams for Tier 1 implementation Coaching.
Northern California PBIS Symposium November 18, 2013.
Establishing Sustainable Coaching Capacity at District and State Levels Marla Dewhirst Don Kincaid.
Shared Decision Making: Moving Forward Together
New PBIS Coaches Meeting September 2,  Gain knowledge about coaching  Acquire tips for effective coaching  Learn strategies to enhance coaching.
Tier 2 & 3 External Coaches Network Meeting Location Meeting Time October, 2012.
Tier 1/Universal Training The Wisconsin RtI Center/Wisconsin PBIS Network (CFDA #84.027) acknowledges the support.
Missouri Integrated Model Mid-Year Meeting – January 14, 2009 Topical Discussion: Teams and Teaming Dr. Doug HatridgeDonna Alexander School Resource SpecialistReading.
Sustaining School-wide Positive Behavior Support Rob Horner University of Oregon OSEP TA Center on Positive Behavior Support
Southeast Asia Regional Senior Leadership Program Day 3 Phnom Penh, Cambodia June 8-12th, 2015.
PBIS Universal Level Reinvigorating Tier One Implementation VTPBiS Leadership Forum October 7, 2014.
PBIS Data Review: Presented by Susan Mack & Steven Vitto.
The Wisconsin PBIS Network (CFDA #84.027) acknowledges the support of the Wisconsin Department of Public Instruction in the development of this presentation.
AWCPA PLC Facilitator’s Training AWCPA Leadership Team.
PBIS Tier 1 Coaches Training
New Coaches Training. Michael Lombardo Director Interagency Facilitation Rainbow Crane Behavior RtI Coordinator
Positive Behavioral Interventions and Supports (PBIS) Update Cambrian School District March 8, 2012.
Wisconsin PBIS Leadership Conference E8 ISIS/SWIS Overview Marla Dewhirst ISIS/SWIS Trainer of Trainers
Monitoring Advanced Tiers Tool (MATT) University of Oregon October, 2012.
1 Year-at-a Glance Monthly Coaching Meeting Module A DC Name and Date Here.
SW-PBIS Cohort 8 Spring Training March Congratulations – your work has made a difference Cohort 8.
IN NORTH THURSTON PUBLIC SCHOOLS KATY LEHMAN PBIS SPECIALIST MAY 22, 2013 PBIS Implementation.
Wisconsin PBIS External Coach Forum On-line meeting January 24, 2013.
DEVELOPING AN EVALUATION SYSTEM BOB ALGOZZINE AND STEVE GOODMAN National PBIS Leadership Forum Hyatt Regency O’Hare Rosemont, Illinois October 14, 2010.
Establishing Multi-tiered Behavior Support Frameworks to Achieve Positive School-wide Climate George Sugai Tim Lewis Rob Horner University of Connecticut,
Tier 2/ Tier 3 Planning for Sustainability Rachel Saladis WI PBIS Network/Wi RtI Center Katrina Krych Sun Prairie Area School District.
DEVELOPING AN EVALUATION SYSTEM FOR SWPBS Rob Horner and Bob Algozzine.
1 Module L R ole of Coaches Coaches’ Monthly Meeting Add DC Name Here.
Big Idea and Characteristic #2: Collaborative Teams.
PBIS Coaches Networking Tier One Internal Coaches November 10 and 11 Facilitated by: Lori Cameron:
Introduction to School-wide Positive Behavior Support.
Notes for Trainers (Day Training)
Problem-Solving Meeting Foundations
Welcome! January VTPBiS Regional Coordinators Meeting.
Positive Behavior Interventions & Supports Family & Community Team Member Network Meeting Thank you for coming! Please make yourself comfortable.
Detroit Public Schools Data Review and Action Planning: Schoolwide Behavior Spring
Click to edit Master title style Click to edit Master subtitle style 1/31/20161 If you modify this powerpoint, update the version information below. This.
The Importance of Teams How to Create Effective Teams and Develop Team Norms.
INITIAL TEAM TRAINING Presented by the MBI Consultants MODULE 7: Establishing Procedures for Data Collection.
COLLABORATION MODULE #1 Setting and Using Norms An online module developed by Pivot Learning Partners for the West Contra Costa Unified School District.
VTPBiS Coordinators as Coaches Learning and Networking Workshop Presented by VTPBiS State Team.
1 Maintaining PBS Momentum Monthly PBS Coaching Meeting Module M – 2013 DC/District Name Here.
Welcome! 2016 PaPBS Coaches’ Day 1 Hashtag, Tweet, Snapchat, Oh My! Please use the hashtag for any social media status updates, pics, etc. #PaPBSCoachesDay.
 SEP Administrative Institute December 11, 2012 Professional Learning Communities & LCCI Survey Data.
SW-PBIS Cohort 10 Spring Training & Celebration February and March 2016.
BoQ Critical Element: Faculty Commitment. Critical Element: Faculty Commitment 4. Faculty are aware of behavior problems across campus (regular data sharing)
PBIS Coaches Networking: Tier 2 January 13 & 14, 2016 Marlene Gross-Ackeret Lori Cameron Emilie O’Connor.
Module 2 : Using Data to Problem-Solve Implementation Issues Session 3 Phase I Team Training Presented by the MBI Consultants.
PBIS Coaches Training Day 3. OUR NORMS Confidentiality * Active participation * Professional use of technology * Assume best intentions Agenda Welcome.
VTPBiS Coordinators as Coaches Learning and Networking Meeting 1 May, 2016.
Spring Data Review and Action Planning: Module 1.0 Introduction Cohort 4 Middle/Jr. High Schools Spring
Leadership Launch Module 11: Introduction to School Wide Information System (SWIS) and the Student Risk Screening Scale District Cohort 1 1.
School-Wide Positive Behavior Coaches Meeting Year 1 Day Donna.
“Are We at Fidelity?”: Annual Evaluation and Action Planning.
GIVE ME FIVE! Five Ways to Develop, Sustain and Advance a PBIS Initiative.
Professional Learning Communities Setting & Revisiting Team Norms
RTI/MTSS Self-Assessment. RTI Session Objectives -An increase in the understanding of the necessary components of RTI/MTSS -An awareness that each school.
PBIS Team Leader Coaching Support
Clinical Practice evaluations and Performance Review
Data-based Decision Making and Problem Solving in PBIS Schools
Year-at-a Glance Monthly Coaching Meeting
Presentation transcript:

Marlene Gross Ackeret, PBIS TAC Lori Cameron, PBIS TAC

Agenda 1.Discuss Tier 2 Readiness: What needs to be in place to be successful 2.Look at Implementation Survey Tools: SAS, BOQ, MATT and BAT, and action plan. 3.Discuss how to coach schools to High Skill and High Will 4.Network around Burning Issues

Classroom Management Workshop January 28 th or March 27 th at CESA 1 Universal Design for Learning October 25, 2013Kimberly, WI November 21, 2013 Trego,WI November 22, 2013 Chippewa Falls, WI December 12, 2013 Waukesha, WI December 13, 2013, Wisconsin Dells, WI External Coach Forum November , 2013 Wisconsin Dells, WI 11 th International Conf. on Positive Behavior Support, APBS March 5 – 8, 2014Chicago, IL WI PBIS Leadership Conference, August 18 – 20, 2014WI Dells, WI WI PBIS Network Events/Calendar/Registration SAVE THE DATE!!

For those of you implementing Tier 2: What do you wish you had done differently to prepare? What Tier 1 systems need to be strong to support Tier 2 implementation?

Implementation Survey Tools Tier 1: SAS – Whole staff given in fall BOQ – Team completes in spring Tier 2: MATT – Progress monitoring tool completed by team in late fall, winter BAT – Equivalent to BOQ completed by team in spring.

Self Reflection Time: Using your computers, look up your implementation Survey results: Given what was shared about the foundation needed for Tier 2, where might you direct your schools’ action planning efforts? Tier 2: If you have completed the MATT and/or BAT, what interventions need to be improved?

High Will and Low Skill Desire to improve and feel it is their job to help every child be successful No resources to get trained High Will and High Skill Healthy Culture--All desire to improve student success Culture provides resources for training High Skill and Low Will Set high standards Culture of school--it is not their job to help every student be successful “The student needs to WANT to learn” is a common response Low Skill and Low Will Nobody cares and nobody has the skill to change Low skill will eventually lead to low will High Will and High Skill: Where are your schools?

Work Group: Hand up, Stand up Pair With your partner: Brainstorm appropriate coaching actions for your quadrant. Share out. Whip around This activity will be repeated this afternoon, giving you an opportunity to put some of these ideas into action.

Networking

Marlene Gross Ackeret, PBIS TAC Lori Cameron, PBIS TAC

Agenda 1.Reminders and Upcoming Events 2.Family Engagement: Resources and Action Planning 3. Sustaining Implementation 4.Professional Learning Communities, PBIS, and Staff Culture 5.Networking with other districts 6.In District Planning Time

Classroom Management Workshop January 28 th or March 27 th at CESA 1 Universal Design for Learning October 25, 2013Kimberly, WI November 21, 2013 Trego,WI November 22, 2013 Chippewa Falls, WI December 12, 2013 Waukesha, WI December 13, 2013, Wisconsin Dells, WI External Coach Forum November , 2013 Wisconsin Dells, WI 11 th International Conf. on Positive Behavior Support, APBS March 5 – 8, 2014Chicago, IL WI PBIS Leadership Conference, August 18 – 20, 2014WI Dells, WI WI PBIS Network Events/Calendar/Registration SAVE THE DATE!!

SWIS 5.0 Updates Video Tutorials Tutorials.aspx Trainings & Webinars Webinars.aspx

Reminders and Year at a Glance PBIS Coaching Calendar coaching-calendar.html Internal Coach Year-At-A-Glance /resources.html

New Resources! “This is PBIS” 15 minute webinar Coach Resource Library Risk Ratio Calculator Family Engagement Resources Film Festival Videos

Family Engagement 1. Resources 2. Action Plan

PBIS Implementation Blueprint

Sustainability What does sustainability mean in your role as a coach? What actions are taking place in your building and/or district that you know will help sustain PBIS implementation? Use the Give One-Get One handout and write it down Silent Appointment Without making a sound look around the room, when you have eye-contact with someone not at your table, partner up and share your thoughts. Write down the other person’s perspective on sustainability. Repeat when given the cue.

6 Ways You Can Promote and Sustain School-wide Implementation

1. Renew commitment each year Develop and recommit to team process and PBIS process with staff - ask for buy- in each year-showcase results and form a plan that addresses trends seen from this school year - if you can predict it, you can prevent it…. Develop “marketing plan” to renew commitment -how will you keep it novel and new in school and community? Continue to make it a priority Administrator’s commitment is crucial Continue to make it a top school improvement goal As it becomes standard practice it will be easier each year

2.Use self-assessment data to action plan and set annual goals Collection and use of data for decision-making Are we implementing SWPBS with fidelity?  SAS, TIC, BOQ Are students benefiting behaviorally, emotionally, academically?  ODRs, Suspensions, Academic data  Disaggregated data Are the systems and practices efficient?  Faculty/staff time  Student engagement  Cost benefit Satisfaction (students, staff, families) Are all stakeholders happy and seeing results for their efforts?  Feedback: surveys, focus groups, etc.

3. Develop a “Community of Practice” that is school-wide Establish an environment where individuals can feel safe about reporting concerns, supported by their school community, and empowered to be a part of the decision making process. Issues, concerns Input, ideas, innovations Data Feedback from ALL staff Celebrations of success

4. Help teams become organized and efficient Facilitate effective meetings Provide members with a schedule of meetings Send out meeting agenda in advance Establish and adhere to team meeting norms Assign roles/responsibilities to team members Provide a data summary that will help define problems with precision Organize for an effective problem solving conversation A key to collective problem solving is to provide a visual context that allows everyone to follow and contribute Document meeting minutes, decisions, actions, timelines

5. Gain Community, School Board and Family Buy-in Family engagement: If families are engaged, they will advocate for PBIS with the school board and in the community. Involving family voice from the beginning will promote ownership and result in fewer misunderstandings of the system

6. Empower staff Make it predictable and easy for them to do!

When you empower staff, you start to see high fidelity. When they know their behavior has a direct impact on student outcomes and a better school environment, fidelity increases. Take 5 minutes to reflect on the 6 steps to sustainability. Where is your school? You may want to spend some of you Distict Action planning time to share your reflections and create action steps

Collaborative Teams People….. Process…… Tasks

What is collaboration? A systematic process in which we work together, interdependently, to analyze and impact professional practice in order to improve our individual and collective results. DuFour, Eaker, & DuFour

How do Functional Teams Operate? “Functional teams make higher-quality decisions and accomplish more in less time, with less distraction and frustration. Furthermore, they avoid wasting time talking about the wrong issues and revisiting the same topics over and over again because of lack of buy- in.” Pat Lencioni

Patrick Lencioni The Five Dysfunctions of a Team INATTENTION TO RESULTS AVOIDANCE OF ACCOUNTABILITY LACK OF COMMITMENT FEAR OF CONFLICT ABSENCE OF TRUST 30WI RtI Center-PLC Session 1 Presume positive intentions rather than ulterior motives Willing to have courageous conversations to come up with best solutions Have consensus process in place and agreements to support majority decision even if don’t agree Team has established methods for calling each other out when not behaving in beneficial way Results and high expectations for each other (and respect for teammate’s work) are more important than personal gain or conveniences

Big Idea: A Functional Team holds itself accountable for the kind of results that fuel continual improvement

High Will and Low Skill Desire to improve and feel it is their job to help every child be successful No resources to get trained High Will and High Skill Healthy Culture--All desire to improve student success Culture provides resources for training High Skill and Low Will Set high standards Culture of school--it is not their job to help every student be successful “The student needs to WANT to learn” is a common response Low Skill and Low Will Nobody cares and nobody has the skill to change Low skill will eventually lead to low will High Will and High Skill: Where is your school?

Self Reflection: In which quadrant would you put your school? Why? What action steps are needed to move to High Will/ High Skill? If you are at High Will/High Skill, what action steps do you need to take to sustain?

Take-Aways REFLECT: What Information/Resources/Activities have I gained? PLAN: How will I use or extend this back on site? – Who needs to be involved? – What resources are needed? – What will I share? – When will I do it? – How much time will it take?

Unstructured Networking Time If there is time at the end, allow coaches to network on an informal basis