GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 1 Gamma-ray Large Area Space Telescope Status of the EM Vib Tests GLAST Large Area Telescope: GLAST Large.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Finite Element Analysis and Testing Correlation of the Mercury Laser Altimeter Craig L. Stevens Mechanical Systems Analysis & Simulation.
Mechanical Systems Analysis Branch/Code 542 Goddard Space Flight Center Analysis of Damping Treatments Applied to the MAP Spacecraft Scott Gordon Code.
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT Project Gamma-ray Large Area Space Telescope Status of the EM Thermal Tests GLAST Large Area Telescope: GLAST Large Area Telescope: Tracker Subsystem.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
Spacecraft Structure Development - Vibration Test - (60 minutes)
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectPeer Review, March 24-25, E2 1 Gamma-ray Large Area Space Telescope 7E2: EM test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT Project Integration and Test October 1, Environmental Test Requirements: Structural LAT Structural Tests: There are three environmental.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Glenn Research Center at Lewis Field Random Vibration Testing of Hardware Tutorial 1 Fatigue Life Assessment William O. Hughes/7735 Mark E. McNelis/7735.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 O. Ferreira CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
THEMIS INSTRUMENT SUITE
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
GLAST Large Area Telescope
Presentation transcript:

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 1 Gamma-ray Large Area Space Telescope Status of the EM Vib Tests GLAST Large Area Telescope: GLAST Large Area Telescope: Tracker Subsystem INFN - Bari

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 2 Outline  Test strategies  First results  Panel vib plan: tests done!  Tray thermal plan: tests to be done  Tower vib plan: ok plan and procedure ready for TRR, fixture calibration done, tower test to be done  Tower thermal-vacuum plan: TBR  EM Matrix plan Reference LAT Documents: 1.LAT-MD-00408, LAT Instrument Performance Verification Plan 2.LAT-SS-00788, LAT Environmental Specification 3.LAT-TD-01005, Thermal Test Results on Thick Converter Mock-up Trays 4.LAT-TD-01249, Thermal Test Results for Pre-Engineering Model Trays 5.LAT-PS-01584, LAT Tracker Tray SSD Ladder Panel Assembly Procedure 6.LAT-TD-01004, EM Tray Vibration Test Plan 7.LAT-TD-01037, EM Tray Thermal Test Plan

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 3 EM Tray vib levels Frequency (Hz) ASD Qual Level (g 2 /Hz) ASD Accept Level (g 2 /Hz) ASD Launch Level(g 2 /Hz) dB/oct dB/oct Overall14.0 g rms 10.0 g rms 7 g rms Duration2 min1 min Random vibration Frequency (Hz) ASD WN Level(g 2 /Hz) Overall g rms Duration (min) 20 ÷ White Noise Frequency range 20  2000 Hz Sweep rate2 oct/min Target Amplitude 0.5 / 0.25 g 0-pk Sine sweep

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 4 Tray vib set up Accelerometers position: Control: two mono-axial accelerometers positioned on two of the four L-shaped block TP1&TP2 Fixture: three mono axial accelerometers placed on a corner on one of the four L- shaped block TP6 Tray: one three-axial accelerometer in the middle TP5 Centrotecnica set up: - 1 LDS V864LT shake table - 2 fixtures - 9 read out channels - 4 trays/day test rate capability W side on the top

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 5 EM Tray vib sequence thrust axis StepDescription TestLevel 1Fixture, tray and accelerometers mounting 2Fixture calibration and tray resonance search Sine sweep0.25 g 0-pk 3Pre-random vibration White noise0.45 g rms 4Random vibration Launch 5Post/Pre-random vibration White noise0.45 g rms 6Random vibration Acceptance 7Post/Pre-random vibration White noise0.45 g rms 8Random vibration Qualification 9Post-random vibration White noise0.45 g rms 10Normal mode check Sine sweep0.25 g 0-pk 11Dismounting 12Test completion

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 6 EM Trays: some results (1) Sine sweep before/after randomRandom vibration + White noise Resonance search: 0 = 815 Hz, Q  51 Resonance check: 0 = 809 Hz, Q  49 Z accelerometer response X accelerometer response Y accelerometer response

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 7 Light ≈ 1000Hz ≈ 800Hz Heavy tray Mid tray EM Trays: some results (2) ≈ 660Hz

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 8 EM Trays: some results (3) “Watch-dog” Input-notched: 13.6 g rms Output-notched: 59.6 g rms Applied notching on qual ASD: output ≤ 16 g 2 /Hz (  Q=10) “Watch-dog” Heavy tray (TS05) 660Hz  Output-expected: g rms

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 9 All trays first mode › 500 Hz 530 EM Trays: summary Vib test pass criteria:  / < 5%  / < 2%

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 10 EM Tower vib levels Sinusoidal vibration Modal surveyRandom vibration: new level TKRAcceptance (g)Qualification (g) Lateral (X)  3.7  4.6 Lateral (Y)  3.7  4.6 Axial (Z)  6.8  8.5 Sine burst: quasi static Frequency range20  2000 Hz Sweep rate2 oct/min Input Amplitude0.15 g 0-pk Alarm Levels± 1 dB Upper Abort Level0.25 g 0-pk Lower Abort Level- 2 dB

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 11 Tower vib set up: Accelerometer. # Side- wall Tray #Location Read-out axis 1+X19 (top)+x, -y cornerx 2+X19 (top)+x, +y cornerz 3+X19 (top)+x, +y cornerx 4+X10Center of structural close-outx 5+X1 (bottom)+x, +y cornerz 6+X1 (bottom)+x, +y cornerx 7+Y19 (top)+y, -x cornery 8+Y10Center of thermal bossy 9+Y1 (bottom)+y, -x cornerz 10+Y1 (bottom)+y, -x cornery 11-X10Center structural close-outx 12-Y10Center of thermal boss planey (top)Center of the top side of the top trayz 14-1 (bottom)Bottom side of the bottom tray near the +x, -y cornerx 15-1 (bottom)Bottom side of the bottom tray near the +x, +y cornery 16-1 (bottom)Center of the bottom side of the bottom trayz Accelerometer locations

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 12 Accelerometers location

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 13 Fixture calibration

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 14 EM Tower vib sequence X,Y,Z axis For each axis Run #Test DescriptionFrequencyComments 1Modal surveyInput: 0.15 g (20 – 2000 Hz) 2Sinusoidal vibration5 – 50 HzQual level 3Modal surveyInput: 0.15 g (20 – 2000 Hz) 4Random Vibration (-6 dB)Input 20 – 2000 Hz1 min duration 5Modal surveyInput: 0.15 g (20 – 2000 Hz) 6Random Vibration (- 3 dB)Input: 20 – 2000 Hz1 min duration 7Modal surveyInput: 0.15 g 20 – 2000 Hz 8Random Vibration (Full level)Input: 20 – 2000 Hz1 min duration 9Modal surveyInput: 0.15 g (20 – 2000 Hz) 10Random Vibration (Full level)Input: 20 – 2000 Hz2 min duration 11Modal surveyInput: 0.15 g (20 – 2000 Hz) 12Sine burst (1/4 level)25 Hz5 cycles 13Sine burst (1/2 level)25 Hz5 cycles 14Sine burst (full level)25 Hz5 cycles 15Modal SurveyInput: 0.15 g (20 – 2000 Hz)

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 15 EM matrix ItemQuantityQuantity to testSine burst (staticequivalent acceleration)Random Vibe + modalsurveySinusoidal vibrationFunctionalThermal CycleThermal balanceThermal VacuumTest site Panels24 Qual Z axis Centrotecnica (vib) Live Trays 51Qual Z axis QualCentrotecnica (vib) Alenia (thermal-vac) Dummy Trays 195 vib 19 ther Qual Z axis QualCentrotecnica (vib) INFN Perugia (in Terni) (thermal) Tower11Qual X,Y,Z Qual X,Y,Z Qual X,Y, Z QualItaly

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 16 Test plans & procedures: EM open items Tower vib test FEM from Hytec Warning and abort levels Discussion of non-conformances and procedure variations Add a Sinusoidal test levels at protoflight level? Add a step …

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 17 Flight units New random level: Qual tower  Protoflight tower Trays tower A vib level? Trays flight vib level?

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 18 Towers: random levels Tower A Old levels (general GEVS levels) New levels Qualification (12.3 grms, 2 min) Workmanship (6.8 grms, 1 min) Trays for tower A Qualification (14 grms, 2 min) Qualification ?? (14 grms, 2 min) Towers 1-16 Acceptance (8.7 grms, 1 min) Workmanship (6.8 grms, 1 min) Trays for towers 1-16 Acceptance (10 grms, 1 min) Acceptance ?? (10 grms, 2 min)

GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 19 Tray assembly&test sequence Tray factory (panels)Vibration testLadder factory Tray assembly: ladders and MCMs on trays Thermal cyclesStacked cosmic rays*Electrical testFast electrical test*Tower assembly * Live trays Vacuum bakeout Plyform Centrotecnica Roma G&A G&A Mipot