River to Sea TPO May 28, 2014 River to Sea TPO May 28, 2014 1 “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.

Slides:



Advertisements
Similar presentations
Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.
Advertisements

Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
From US 17 to SR 11 and SR 11 to Cone Road FPID No
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Titusville to Edgewater Bike Loop PD&E Study
I-4 Master Plan Implementation Harold W. Barley Executive Director Tampa Bay Regional Transportation Summit October 10, 2013.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
I-95/Pioneer Trail Interchange
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
Using the “Cloud” in Daily Operations
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
River to Sea TPO CAC A Presentation to: May 19, 2015.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
I-4 ULTIMATE DESIGN PRESENTATION TO THE VOLUSIA TPO AUGUST 21, 2012 FDOT Contact: John Zielinski (407)
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Regional Trails Corridor Assessment. Project Goals »Complete the regional trails network in the TPO Planning Area and advance the Florida Greenways and.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
2040 Long Range Transportation Plan for River to Sea TPO CAC and TCC Meetings May 19, 2015.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Pioneer Trail I-95/Pioneer Trail Interchange Turnbull Bay Rd County & Port Orange request restoring interchange to TPO “unfunded” LRTP To allow interchange.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Program Manager Administrator
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
SEMINOLE COUNTY Financial Project IDs: & Public Meeting December 6, 2011 Presented By: Stephanie Ghezzi, PE.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
Alternative Alignments Public Meeting
Congestion Management Process / Performance Measures Report
Potomac Yard Metrorail Station
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Central Polk Parkway PD&E Study
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
River to Sea TPO Meeting US 92/International Speedway Boulevard
CR184 (Quintette Road) Bridge #480045
A Presentation to: River to Sea TPO Board May 27, 2015.
Florida Transportation Commission FY 2009
September 25, 2018 District 5 SUN Trail Update
LRTP Alternatives Results
STATE SUEE AND ONE WAY CORRIDORS
Volusia TPO Board Meeting January 22, 2013
Lyle Parkway to SR 540 (Winter Lake Road)
Heart of Florida Loop East Section
Space Coast TPO State Road (S.R.) 528 Update
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road From east of SR 434 to east of 472 Volusia County FPID:

2 Segment 1 CR 532 (Polk/Osceola County Line to SR 528 (Beachline Expressway) Segment 2 SR 528 (Beachline Expressway) to SR 435 (Kirkman Road) Segment 3 SR 434 to US Segment 4 US to SR 472 Segment 5 US 27 to CR 532 (Polk/Osceola County Line )

The Extensions PD&E Reevaluation will address Express Lanes Access Modifications Environmental Engineering Public Involvement Rail Envelope R/W Evaluation The Extensions PD&E Reevaluation will address Express Lanes Access Modifications Environmental Engineering Public Involvement Rail Envelope R/W Evaluation 3

4 General Use Lanes Express Lanes Express Lane Entrance Ramps Express Lane Exit Ramps Interchange Ramps Dirksen Rd. Saxon Blvd. SR 472 Rhode Island Ave Extension Ramp to 4 Express Ramp from 4 Express Express Lane Direct Ramps to and from I-4 West/South I-4 WB I-4 EB

5 General Use Lanes Express Lanes Express Lane Entrance Ramps Express Lane Exit Ramps Interchange Ramps Dirksen Rd. Saxon Blvd. SR 472 Rhode Island Ave Extension Ramp to 4 Express Ramp from 4 Express Express Lane Direct Ramps to and from I-4 West/South I-4 WB I-4 EB

6 Typical Section SR 400 (Interstate 4) Without Rail Corridor Volusia County Design Speed = 70 MPH Typical Section SR 400 (Interstate 4) With Rail Corridor Volusia County Design Speed = 70 MPH

Option Express Lanes Rail Homes Impacted Businesses Impacted Ponds (Acres) Wetland Impacts (Acres) Costs (Millions of Dollars) County Line to Dirksen Drive Dirksen Drive to Rhode Island PartialFullPartialFull Wetlands Mitigation Right of Way Construc tion Total 122NO YES NO YES

Public Involvement Activities SpringSummerFallWinterSpringSummerFallWinter Public Involvement Plan Website SECTION 4 (US to SR 472) Alternatives Public Meeting Public Hearing LDCA

Further refine and evaluate alternatives based on input received Public Hearing Complete environmental and engineering documents Location design concept approval (LDCA) from Federal Highway Administration

Colleen Jarrell, P.E. Consultant Public Information Liaison HNTB Corporation 610 Crescent Executive Ct., Suite 400 Lake Mary, FL (800) Beata Styś-Pałasz, P.E. FDOT Project Manager Florida Department of Transportation District Five 719 South Woodland Boulevard DeLand, FL (386) River to Sea TPO May 28, 2014 River to Sea TPO May 28,