ISO Wellhead Integrity

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

Completion Object Overview June 2013 WITSML/PRODML Standards.
Characteristics of Instruments P M V Subbarao Professor Mechanical Engineering Department A Step Towards Design of Instruments….
Baker Jardine Petroleum Engineering & Software Gas Lift Diagnostics A New Approach Daniel Lucas-Clements Baker Jardine.
Lesson 8 Offshore Drilling
Sdm 2000 H. Millwater, K. Griffin, D. Wieland Southwest Research Institute A. West, H. Smith, M. Holly The Boeing Co. R. Holzwarth Air Force Research Laboratory.
Chain out of plane bending fatigue
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Petroleum Engineering 406 Floating Drilling
IBM Proof of Technology Discovering the Value of SOA with WebSphere Process Integration © 2005 IBM Corporation SOA on your terms and our expertise WebSphere.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
Introduction to Systems Analysis and Design Trisha Cummings.
OGP STANDARDS COMMITTEE MEETING Berlin, Germany Presentation of TC 23: current events and the agenda of the coming years V.V.Vernikovsky, executive.
Subsea Industry Standardization Landscape
Orynyak I.V., Radchenko S.A. IPS NASU Pisarenko’ Institute for Problems of Strength, Kyiv, Ukraine National Academy of Sciences of Ukraine Pisarenko’ Institute.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
Aero-structure Cost Estimation and Optimization Integrated KBE System Background This research focuses on thermoplastic aero-structure cost estimations,
Department of Civil and Environmental Engineering, The University of Melbourne Finite Element Modelling Applications (Notes prepared by A. Hira – modified.
ITEC224 Database Programming
Orynyak I.V., Borodii M.V., Batura A.S. IPS NASU Pisarenko’ Institute for Problems of Strength, Kyiv, Ukraine National Academy of Sciences of Ukraine Pisarenko’
Subsea Light Well Intervention
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
Raft & Piled-raft analysis (Soil-structure interaction analysis)
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
1 Virginia Tech Vortex-Induced Vibrations Project A. H. Nayfeh, M.R. Hajj, and S. A. Ragab Department of Engineering Science and Mechanics, Virginia Polytechnic.
SOFTWARE DESIGN (SWD) Instructor: Dr. Hany H. Ammar
T +44 (0) W insensys Intelligent Sensing Solutions LIFE OF FIELD INTEGRITY MONITORING FOR SUBSEA ASSETS Lenny Sutherland Director,
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
IMP Research and Technological Development Programs Oscar Valle Molina Federico Barranco Cicilia Mexican Petroleum Institute (IMP) ICRARD Meeting June.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
INTERACTION AND COMPATIBILITY BETWEEN PROPULSIVE PLANT AND ENGINE ROOM / DOUBLE BOTTOM STEELWORK.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
Classification: Internal Status: Draft Design of offshore structures in a field development perspective ”From nothing to nothing with solid profit” $$
System engineering round table discussion
Frame with Cutout Random Load Fatigue. Background and Motivation A thin frame with a cutout has been identified as the critical component in a structure.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
OrcaFlex OrcaFlex User Group, Slide 1 of 5 - Fatigue Analysis Automated Analysis from Multiple Simulation Files Analysis Options: –Regular.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
19th January 2012 Don Wells (Hess)
Well Integrity round table discussion Washington 2010 By Olav Inderberg and Jens-Henrik Neuenkirchen.
University of Illinois Contribution Amr S. Elnashai Sung Jig Kim Curtis Holub Narutoshi Nakata Oh Sung Kwon Seismic Simulation and Design of Bridge Columns.
Offshore and Onshore Calibration Why Choose IKM Measurement Services Australia Pty Ltd.
Introduction to Well Completions
Fatigue Analysis in ASME B31.3 Piping
SEMINAR ON PRESENTED BY BRAHMABHATT BANSARI K. M. PHARM PART DEPARTMENT OF PHARMACEUTICS AND PHARMACEUTICAL TECHNOLGY L. M. COLLEGE OF PHARMACY.
The application of quantitative risk analysis (QRA) techniques for well construction in complex reservoirs West Vanguard Snorre cross-section.
The Rotation Sleeve System Triangle Equipment AS in co-operation with Ericsson Saab Avionics AB The EXPRO Group.
NASEM Subsea Bolt Performance Workshop April , 2017
Date of download: 10/9/2017 Copyright © ASME. All rights reserved.
Chapter 1 The Systems Development Environment
Cementing How it is Done
Analysis of Heading in Artificially Lifted Wells
Chapter 1 The Systems Development Environment
Orynyak I.V., Borodii M.V., Batura A.S.
Systems Analysis and Design
Chapter 1 The Systems Development Environment
Completion Object Overview
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Committee on Standardization of Oilfield Equipment and Materials
Updating the failure probability of miter
Riser and Flowline Hose Systems Design to Installation
Thought for the day “Engineering is the art of modelling
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Numerical Analysis of slopes
Chapter 1 The Systems Development Environment
Review and comparison of the modeling approaches and risk analysis methods for complex ship system. Author: Sunil Basnet.
Presentation transcript:

ISO 13628-1 Wellhead Integrity A systems approach needed requering information from several traditional disciplines

Introduction: System overview Rig and riser loads on well Complex interaction between drilling and well components Soil interface

Subsea Tree Terminology Horizontal subsea tree (HXT) Tubing hanger Tree connector threaded onto bottom of Composite Valve Block Tree connector Wellhead (HP) housing Conductor (LP) housing

History Fatigue damage to wellhead West of Shetland in the 80’ies. Assumed damage caused by vortex induced vibrations VIV Observed movements in several wellhead in the North Sea in 2005, 2006 and 2010 One wellhead was retrieved and inspected without findings Fatigue calculations from different parties with differences in results of several magnitudes. “Wellhead Fatigue – Method Statement Update” in 2009, as a joint effort, Statoil and DNV, with input from WH suppliers. Further updated and issued by the WH JIP ISO 13628-7 Table B.6 Principal parameters

Background Increased re-entry on existing wells on the Norwegian continental shelf. Complex well designs and operations including multilateral- and smart wells increases drilling time. Increased amount on intervention and work-over operations on sub sea wells. Life time extension of wells, Specified total drilling time for new complex wells can be up to 300 days Increased size of drilling rigs and weight of BOP’s, on new rigs up to 400 ton

Wellhead and connectors – current status Dry wellheads and XT’s moved offshore and subsea Designed for pressure containment Designed with little consideration to fatigue i.e. Fatigue life not specified in design Complex geometry, difficult to calculate Inspection not possible, no logging of fatigue damage rates normally available and operational history records are not “too” detailed. Advanced Wellhead Calculation methods in place, but: By nature, sensitive to variations in input parameters. The data as cement level etc. need to be logged for as built doc’s of the well. Calculation models not calibrated with offshore field measurements some info from instrumentation, but more needed for calibration of analytical tool and identification of effects like rig trim etc.

Tree Connector / Wellhead Fatigue Design Practice Design Practice Main Points The fatigue assessment of subsea tree connectors and wellheads requires analyses and understanding the interactions of: The floating vessel and drilling and marine riser Subsea well stack-up Wellhead and downhole casing assemblies Cement and soils The methodology reflects industry experience and offers a balance among analysis efficiency compatible with project and operational constraints The methodology is based upon dynamic analysis of models to obtain global response loads of the floating drilling unit, riser, and wellhead Finite element analyses are then used to translate local stresses and to define stress concentration factors for structural details of interest. Fatigue lives will be based upon local stresses and fatigue resistance defined by S-N curves

Wellhead Integrity in 13628-1 ISO 13628-1 Appendix XX Wellhead Integrity TOC (based on Wellhead Fatigue Analyses Method and NORSOK U001) Introduction Objective Scope Safety Philosophy System Description Well Drilling CWO Loads Load Conditions General - Operational phases Extreme/Survival (NORSOK U001) Installation, drilling, CWO Fatigue Drilling, CWO Analyses Methodology Modelling Philosophy Extreme/Survival Analyses Input Data Local Response Analyses Global Load Analyses Design Criteria (general, no new factors) Extreme/Survival (different i ISO 13628-4/-7/13624-1) Reporting Interaction with other stakeholders Reporting format What to report Stress concentration factors Component capacities for pressure, tension, moment (combined loads) Component/connector stiffnesses Cumulative fatigue damage