The students: Mohammad Shabaro (10611393) Mahmoud Mousa (10612458) Yosri Asfour (10508901) Supervisor: Dr. Iyad Assaf 1.

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

HOT & COLD WATER SYSTEMS
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING.
Heating, Ventilating, and Air-Conditioning
CON 4003 Construction Estimating Prof R. V. Locurcio.
Five star hotel in Nablus
Cold feed to hot water cylinder Sink Basin Bath Drain valve Stop valve WC cistern 100 litre (minimum storage cistern)
MEP design Mechanical, Electrical, Plumbing. Often separate consultants Can be separate even within a single firm Often performed on a design-build basis.
Granulation Project 2 MECHANICAL SYSTEMS IN BUILDINGS IBN SENA HOSPITAL IBN SENA HOSPITAL Prepared by: Abdullah Hasayen Mazin Khalid Moath Ayyash Mohammad.
Geothermal Retrofit of HVAC Systems
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTEMENT OF MECHANICAL ENGINEERING MECHANICAL SYSTEMS OF AL-OYOON HOSPITAL-NABLUS Graduation Project.
HVAC SYSTEM DESIGN Businessmen Club Supervisor: Dr Salameh Abdulfattah
May 2013 Supervisor Ins.RamezKhaldi Luay A. Aghbar ( ) Husni H. Malysha ( ) Mohammad S. Ahmad ( ) Yousif F.Abdi ( )
Objectives Finish with ducts and fans Define project topics.
PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prep ared by: Abdulla Alawneh Islam Salahat Mohammed Jaber Majdi.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING MECHANICAL ENGINEERING DEPARTMANT Mechanical Systems for jenin headquarter building Supervisor:The.
1 Pipe2000 Campus Facilities Modeling by Dr. Don J Wood Pipe2000 Modules.
Energy Valve Delta T Manager
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
© 2011 Rinnai America Corporation TANKLESS WATER HEATING TECHNOLOGY For Commercial.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
Prepared by : Hashem Ihasn Janajreh Mohammad Abu Sarah Sari Khaled Sobeh Ahmad Medhat Attiyah Supervisor : Dr. Iyad.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Drugs Addicts Rehabilitation Center
Prepared by : Ameed mahmoud qzaih Mohammad mustafa yaseen Samer abdelrazaq khanfar Supervisor : Dr. Eyad Assaf.
Prepared by : Abd Aljabbar Rabaya Ammar Salloum Sameh Shawahni Supervisor : Dr. Eyad Assaf 1.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Graduation Project Mechanical system for Building of_ al Kuwait Surgery Specialized Hospital.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Section 3 Using Heat.
Technology in Architecture Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing Example Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Water Management Water is an important natural resource that requires proper management. Appropriate flow rate, pressure, and water quality are necessary.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10 : CONTROL VALVES IN CLOSED LOOP SYSTEMS.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
}السلام عليكم ورحمة الله وبركاته{
Plumbing system fundamental and design course
Book E3 Section 1.4 Air-conditioning
The Data Center Challenge
An-Najah National University Secondary School Design
System Diagrams Symbol Library – Black Background David Sellers
An-Najah Sport Center An-Najah National University
Kindergarten Amani Nasasrah , Enas Awad Shadia Yamin , Sondos Ghanim
water to water heat-pump
Chamber of Commerce & Industry
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prepared by: Abdulla Alawneh Islam Salahat Mohammed.
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
HVAC SYSTEM DESIGN ALMAQASED HOSPITAL
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
Mechanical System For AL-Rehan Hospital
Electrical Gas Plumbing Heating & Cooling
Heating, Ventilating, and Air-Conditioning
Chilled Beam Performance:
Graduation Project – 2 Mini-Mall
______________ Combustion Engine
Maintenance at ALBA facility: Strategy for the conventional services
PROJECT NAME: HVAC AND MECHANICAL SYSTEMS DESIGN
Mechanical Systems Design for Al-Bahrain Hospital
Mechanical Systems For Al-Zakah Hospital
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Presentation transcript:

The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1

2 - Hospital Description. - Heating load calculation. - Cooling load calculation. - Duct Design. - Pipe Design. - Riser and Boiler Room. - Plumping system. - Equipment Selection. - Summary

3 Hospital location Country: Palestine City :Jerusalem

4 -Inside and out side design condition:

5

6

7

8 Section from second floor

9

10 Section from second floor

11

12

13  Total Cold Water Fixture Unit is 380 F.U & Total Hot Water Fixture Unit is 140 F.U  Domestic hot water boiler is 293 KW  Domestic water storage tank is 150 m³

14

15

16

17 Drainage system: Every stack size is 4” Every stack contain vent that’s size is 4” Building drains are connected by horizontal branches in size 8 inch Any horizontal branch must be sloped in range (1-1.5)cm for every 100 cm.

18 Fire fighting system :  In Almaqased Hospital there is 20 landing valve and 20 fire cabinet Distributors in the building, in each floor there is five landing and five fire cabinet  Pump is selected to provide 1000 gpm and 130 psi, the water must be provide the further landing valve by 250 gpm and 100 psi  Storage tank capacity is 450 m³

19

20

21 Medical gases in theaters

22 Boiler: It is selected from De Dietrich Company Boiler load = 1220 KW Boiler Model No. :GT530 DIEMATIC-m3 Chimney is designed to exhaust gases from boiler and its diameter is 50 cm Chiller: It is selected from Petra Company Chiller load = Ton Chiller Model No. :W P S a 435 2S

23 Supply fan : It is selected from Greenheck Company There is three supply fan are selected depend on flow rate and static pressure And this supply fan no.1 Supply Fan Model No. : RSF-200 Exhaust fan : It is selected from Petra Company There is nine exhaust fan are selected depend on flow rate and static pressure And this exhaust fan no.1 Exhaust Fan Model No. : P-EX-T-640

24 Air Hander Unit(AHU ): It is selected from Petra Company In this project there is three (AHU) are selected for theaters. This (AHU) model no. that supply theater 1 & 2 (AHU) Model No. : PAH H C 40 C 5 H 4 X 5 Fan Coil Unit(FCU): It Is Selected From Petra Company In each room there is Fancoil that’s Compatible with its needs

25 Pumps: The pump is selected from Salmson company depending on the total flow rate  Chilled pump: flow rate=52.6 L/S Pump Model No. : SMC  Hot water pump: Flow rate = 1.35 L/S Pump model: SMC  Cold water pump: Flow rate = 2.31 L/S Pump model: SMC

26 *All steps of design and plans of HVAC system are done. *All steps of design and plans of plumping system are done. *we select a suitable equipment for the system which satisfied the required conditions.

27