Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.

Slides:



Advertisements
Similar presentations
WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)
Advertisements

Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
National Institute of Standards and Technology SBIR Program Mary Clague NIST SBIR Program Manager National SBIR Conference June 16,
SMALL BUSINESS INNOVATION RESEARCH PROGRAM NATIONAL CONFERENCE – WASHINGTON, DC - JUNE 15-17, 2015.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ASEP Ergonomic support development Fall 2002 The Need... “Scientific evidence shows that musculoskeletal disorders of the lower back and upper extremities.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
The Small Business Innovation Research Program U S C E N G I N E E R I N G T E C H N O L O G Y T R A N S F E R C E N T E R A N A S A R E G I O N A L T.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
SMALL BUSINESS INNOVATION RESEARCH PROGRAM SBIR ROAD TOUR 2015 – VINCE GARCIA/PETER ROOHR.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Small Business Innovation Research Program (SBIR) Presented by Sharina Broughton.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Session VI: Cryomodule Construction Summary
Mike Anerella December 17, 2013
Status and plans for the 3.9 GHz section of XFEL
Plans towards CC in the LHC a US – centric perspective
Crab Cavities Contribution from the U.S.
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
LINAC AG • IAP • Goethe Universität Frankfurt
WG-1 Session Cavity Performance Cryomodule Performance
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Second SPL Collaboration Meeting, Vancouver May 2009
NIST SBIR Administrator
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HIE-LINAC status report
Daresbury ESS In-Kind Contributions
Presentation transcript:

Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes

Advanced Energy Systems, Inc. SBIR Program Format Phased Program Phases Awarded Independently Phase One Starting July 09 (in neg. now) –8-9 Months –Limited Program –500 Hours (13 Man Weeks) –Feasibility Study –Costing Study for Phase Two –Awards mid to late April Phase Two –Based on successful Phase One, Late Summer 2010 Award. –Phase Two is proposed via Phase One report. –Two year program $750K max Level Funded –Year two technically optional for DOE –Detailed Design, Hardware, and Test phase

Advanced Energy Systems, Inc. Submitted SBIRs The Crab Cavity: AES (Cole), BNL, LBL, and SLAC Couplers for the Crab Cavity including LOM, SOM, HOM, and FP: AES (Cole), BNL, LBL, and SLAC A Cryostat for use with the Crab Cavity: AES (Holmes) and FNAL Crab Cavity Tuning Devices: AES (Holmes) and FNAL Of these we only won the first, the Crab Cavity SBIR.

Advanced Energy Systems, Inc. Impact Only have funding for engineering and analysis of Cavity. Effort on potentially complex coupler structures will have to come from elsewhere. Same for Cryostat and Tuner development.

Advanced Energy Systems, Inc. Prototype Crab Cavity Collaborators are AES, BNL, LBL, and SLAC Phase 1 –Preliminary Design of Cavity (3 man months supported by SBIR) Coordinate transfer of Physics Design Develop initial mechanical solid model Perform Initial Thermal and Structural Analysis Preliminary Mechanical Design and Fabrication Feasibility Study Phase 2 –Complete mechanical design with supporting thermal/structural analysis. –Generate complete fabrication drawing package for the Crab Cavity. –Fabricate Prototype Crab Cavity –Perform BCP and HPR on Prototype Crab Cavity at AES if our facilities can accommodate it. We anticipate that we will be able accommodate an 800 MHz elliptical crab cavity. –Support Crab Cavity VTF testing at BNL

Advanced Energy Systems, Inc. Crab Cavity Couplers Focus of the coupler SBIR was to have been the coupler structures. The boundary between the cavity and couplers is quite blurry for some of the configurations. It is reasonable to expect that provisions can be made to retrofit couplers at a later date.

Advanced Energy Systems, Inc. Cryostat Effort required to look at retrofitting cavity to some existing cryostat will have to come from elsewhere. This program can support some of this but it will be at the expense of the cavity work. Best results will be from external support of cryostat engineering. We will provide models and drawings of the cavity.