Innovating in a compact environment

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
BOX PUSHING TECHNOLOGY
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Bridge Engineering (6) Superstructure – Concrete Bridges
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
GROUND TREATMENT WORKS COMPENSATION GROUTING FARRINGDON STATION Client: CrossRail Main Contractor: BFK (Bam-Ferrovial-Kier JV) Site Location: Farringdon.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
GROUNDWATER CONTROL.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
There are more than 500,000 bridges in the United States!
GE Regional Round-ups Central & South West May 2015 Water, Ground & Environment compiled for internal use only.
TRENCHLESS TECHNOLOGY
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
The changing world of Network Rail Simon Kirby, Managing Director Infrastructure Projects.
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
TWIN SAILS OPEN LIFT BRIDGE. Introduction Types of Bridges Open Lift Bridge Architecture of TWIN SAILS OPEN LIFT BRIDGE Details of TWIN SAILS Specialities.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Viaduc de Millau. Project timeline 28 June28 June 1989: governmental approval of the middle route October19 October 1991: selection of the.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Tower Bridge. Tower Bridge is a suspension bridge in London, over the River Thames. It is close to the Tower of London, which gives it its name. It has.
Construction Quality Management Metro Goldline Eastside Extension Los Angeles January 19, 2007 ASCE Construction Institute Conference.
Schematic Design CCCC-FHDI July, 2011 Port Sudan SPC Flyover Engineering Let the world more smoothly.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Kenny Constructions Pty. Ltd. are a dynamic, mid-tier quality assured contractor with a proven track record in successfully delivering civil, structural.
The Tunnel Dismantling Machine (TDM)
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
CAISSON FOUNDATION.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
August 6, 2013 LAKE FORREST DRIVE UPDATE. sandyspringsga.gov Lake Forrest Drive Update  Actions To-Date Work Orders – 13 since 2009 for clean-up, 8 of.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
DIAPHRAGM WALLS.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
DESIGN AND CONSTRUCTION GUIDELINES
INTRODUCTION TO TRENCHLESS TECHNOLOGY
Using project records to show delay and disruption
M40 J12-J14 – Data Analysis, Modelling and Scheme Development
Bridge modelling with CSI software.
Awarding Criterion for late tender: the lowest bid- why?
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Print Reading.
Materials Innovation Hub Challenge Martin Richardson
Construction Considerations
6th. Semester Schedule: 1st. Week
Life Cycle Costing.
Presentation transcript:

Innovating in a compact environment EAST KENT ACCESS PHASE 2 CLIFFSEND UNDERPASS JACKED DECK TUNNEL

JACKED STRUCTURES The concept of horizontal construction to install underground structures developed in mid-late 20th century. The work is characterized by off-line construction of the permanent structure elements with a relatively short period of installation and minimal disruption to surface facilities.

ESTABLISHED METHODS

JACKED DECK CONCEPT A patented approach which builds on proven horizontal jacked installation techniques Based on the installation of a slide path within access tunnels or boxes. Deck units are jacked in along the slide path as excavation takes place in a compartmentalized shield fixed to the leading unit.

JACKED DECK BENEFITS Continuous face support with full structural lining Minimizes exposed soil face Install greater spans and longer drive lengths Close installation accuracy

ALTERNATIVE ABUTMENTS Jacked Access Box and piled abutments Jacked foundation and wall boxes Tunnel and piled abutments

VolkerFitzpatrick HOCHTIEF JV EAST KENT ACCESS PHASE 2 Client: Kent County Council Engineer: Jacobs Scheme prequalification in 2008 Bids submitted in March 2009 Original scheme concept for Cliffsend: Twin Jacked Boxes Contract Award: VolkerFitzpatrick HOCHTIEF JV

EAST KENT ACCESS PHASE 2 The East Kent Access road involves: 8km dual 2 -lane carriageway with 3 roundabouts An area of outstanding archaeological significance Design and Construct Structures 2 span dual carriageway road bridge over railway A 100m+ underpass under rail tracks and level crossing at Cliffsend Client’s Perspective Its not a road scheme It's a railway crossing scheme with archaeology

SCHEME LAYOUT A299 CLIFFSEND A256

CLIFFSEND UNDERPASS Looking West Picture courtesy of VolkerFitzpatrick HOCHTIEF JV

KCC/JACOBS TENDER SCHEME Suggested installation concept based on box jacking Two parallel boxes 10m wide x 7.2 m high Total box length 2 x 103 metres, each in three sections Cover below rail tracks 6m

VolkerFitzpatrick HOCHTIEF JV Design and Construct Submission Following Value Engineering

VolkerFitzpatrick HOCHTIEF JV CLIFFSEND TEAM Permanent Works Designer Atkins Third Party Checker Tony Gee & Partners Precast Concrete Sian Formwork (Deck) F P McCann (Segments) Deck Jacking Mammoet Piling Keller Tunnelling Pilots - Murphy Deck - McBurney Jacked Installation Consultant Jacked Structures Main Contractor VolkerFitzpatrick HOCHTIEF JV

Drift - Head Brickearth GEOLOGY Drift - Head Brickearth Overlying Thanet Sands (1-2m thick) Drift - Chalk Head Overlying Chalk (1-2m thick) Solid - Thanet Sand Thickness increasing towards the south, Solid- White Chalk Underlying entire site

PILOT TUNNELS

DECK / SHIELD

SLIDE TRACK

ANTI DRAG SYSTEM

JACKING

EXCAVATION Average progress 2m / day

NETWORK RAIL INTERFACE Continuous automatic monitoring Track fettling during non revenue hours

GOING FORWARD Integrated structural solutions facilitate greater structural lengths and spans A cost effective approach Continuous structural ground support reduces risk Applicable to Underpasses, Metro Stations and Launch Boxes Early engagement is vital to realise full benefits