Subcommittee No. 7 - Certification of Test Facilities by Ronald K. Faller, Ph.D., P.E. Midwest Roadside Safety Facility John LaTurner, P.E. E-TECH Testing.

Slides:



Advertisements
Similar presentations
Job Safety Analysis Introduce yourself, background etc.
Advertisements

SITUATION RESPONSE FLOW CHART SUPERVISORS’S ACTIONS SITUATION OCCURS Direct observation, complainant reports, third party reports Document initial knowledge.
M.A.S.H.: The New Safety Hardware Crash Testing Criteria
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Indicators to measure the effectiveness of the implementation of the Strategy State of the art Karin Sollart Netherlands Environmental Assessment Agency.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Guidelines for Energy Efficiency Measure Cost and Non-Energy Benefits Subcommittee.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2012 Minimum School Bus Specifications for Oklahoma Every five years the National Congress on School Transportation meets to review and update the National.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
Section 305 Technical Subcommittee Chicago IL June 22 nd 2011.
SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety May 4, 2007.
1 Is PrintED ® Accreditation Right for You? Graphic Arts Education and Research Foundation (GAERF  )
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Electrical and Computer Engineering Irregular Object Dimensioning System Advisor: Professor Neal Anderson Michael Baccari Peter Bian Michael Coughlin Avi.
Diane Schilder, EdD and Jessica Young, PhD Education Development Center, Inc. Quality Rating and Improvement System (QRIS) Provisional Standards Study.
Welcome – Please sign-in and sit with your Mentor Professional Growth Planning Process.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Development of Verification and Validation Procedures for Computer Simulation use in Roadside Safety Applications NCHRP FUTURE WORK FOR TASK 8 Worcester.
1 Great Things Are Happening In Paramount Schools - Where We Inspire Great Learning Through Great Teaching Great Things Are Happening In Paramount Schools.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Summary of Assessment Reports and Gap Analysis
Managed by the International Fuel Tax Association, Inc.
A Few Quick Items from AASHTO June 2006 Jim McDonnell, PE Associate Program Director, Engineering.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 05/09/2013.
Post On-Scene Investigation and Report Preparation.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
What Documentation Needs to be Submitted With an Approval Application?
Local Wellness Policy for RCCIs: A Team Approach.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Minutes from Subcommittee No. 7 - Certification of Test Facilities by Ronald K. Faller, Ph.D., P.E. Midwest Roadside Safety Facility John LaTurner, P.E.
NCHRP 350 UPDATED. NCHRP 350 Historical Review Document Source Year Issued Number of Pages Test Vehicle & Weight HRB # lb. car NCHRP #115.
Test Documentation and Reporting AASHTO Task Force 13 Subcommittee 7 Laboratory Accreditation Spring 2006 Meeting Lido Beach, Florida May 11-12, 2006 Subcommittee.
First-Year Engineering Program Advanced Energy Vehicle External Sensors Reference:  AEV Lab Manual  External Sensors Grading Guidelines.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 M&V Cx Working Group Report New York City - M&V Summit Steve Dunnivant - Chair This presentation will probably involve audience discussion, which will.
By P/D/C Ken Guscott 1. Make MM Recommendations 3. Submit MM to Website Review by Area Monitor Feedback 4. Update DB2000 MM Other Submissions Review by.
How do You Fit within the Process? Roles and Responsibilities – Pre CAB (1/2) 1 Change Requestor Initiates the Change Request (CR) in Service-now Includes.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Turning our Action Plan into Action. Acronyms: FACA – Federal Advisory Committee Act WRDA 1996 – Water Resources Development Act of 1996.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
© A2LA Understanding the Accreditation Hierarchy - Who’s Who and What’s What ? NCSL International Conference Orlando, FL August 7, 2008 by Roxanne.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
ICC Industry Advisory Committee Purpose and Scope The purpose of the Industry Advisory Committee (IAC) is to promote, in cooperation with the International.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
Welcome to the Permit Implementation Regulations (AB 1497) Workshop.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Systems and Networking Department
March 2018 Facility Planners Meeting
EVC Accreditation Update Fall 2017 PDD Thursday, 3/31/17
Bumper Trajectories During High-Speed Impacts with 6-in. Curbs
Mark S. Orloff, MD Regional Councillor
SMSA Policy and Planning Committee
How to conduct Effective Stage-1 Audit
Update on AASHTO’s Comments Jim McDonnell, P.E. AASHTO
Region 8 Meeting Harvey Solomon, MD
Report of the Technical Subcommittee
Accredited Standards Committee C63® - EMC
Presentation transcript:

Subcommittee No. 7 - Certification of Test Facilities by Ronald K. Faller, Ph.D., P.E. Midwest Roadside Safety Facility John LaTurner, P.E. E-TECH Testing Services, Inc. AASHTO Task Force 13 Sarasota, Florida May 11-12, 2006

Subcommittee No. 7 Committee Co-Chairs I will be resigning my Co-Chair position effective May 12, 2006 The new Co-Chair will be Jeff Shewmaker of Safe Technologies, Inc. John LaTurner of E-Tech Testing Services, Inc. will continue to serve as Co-Chair.

TF 13 Recommendations ( ) Encourage FHWA to adopt policy requiring test labs be accredited by 3 rd -party org. Immediately arrange for ILC’s as they are easily accomplished over the long term, of great value in roadside hardware testing, and part of a 3 rd -party lab. accr. process Continue dialogue on lab. accr. & cooperate with FHWA to improve data quality & consistency

Why Laboratory Accreditation? ( ) Increase consistency, competency, quality, and accuracy within U.S. test labs Desire for test results to be globally accepted

Recent and Current Activities Handout of Fall 2005 meeting minutes Measurement Uncertainty – Determination of Impact Speed -some labs showed findings at Fall 2005 meeting Invitation sent to 4 labs on FHWA approved test list -no response Three ILC tasks (in progress) -test documentation and reporting -determination of vertical C.G. -measurement of OCD’s

Future Activities Accelerometer Data Analysis ILC by MwRSF -w/ and w/o head offsets for use by labs to verify intermediate analysis steps Continue to receive input from labs on three active ILC’s New ILC on accelerometer mounting methods

FHWA Update Nick Artimovich -status of plan for draft FHWA accreditation requirements -availability by the end of 2006/2007/2008?

ILC No. 1 – Test Documentation and Reporting Laboratory review of 350 Update documentation and reporting requirements Discussion led by Jeff Sankey – TRC, Inc. Summary of results to be provided to 350 Update research team (Sicking and Mak)

ILC No. 2 – Center-Of-Mass Determination Discussion led by Faller & LaTurner Two laboratories submitted feedback on MwRSF’s suspension procedure -Karco Engineering -E-Tech Testing Services, Inc.

C.G. Determination Responses Karco (Ivory) -problems with measurement setup in initial attempts -obtaining new crane for follow-up attempts -currently uses a tilt-table method -small measurement error (a few mm) leads to larger errors in C.G. location (i.e., up to 25 mm) -Karco will use whatever method is required -measurement taken at purchase or at test time?

C.G. Determination Responses (Continued) E-Tech (LaTurner) -evaluated suspension method and made revisions -uses self-leveling laser levels and tripods on each side of vehicle -white tape strips placed on sides -modified wheel hubs with swivel lifting eye bolts -experienced difficulty in obtaining a tight triangle -wind and plumb bob alignment effect results -new tires and roof-mounted equipment to get 28”

ILC No. 3 – Determination of Occupant Compartment Deformation Discussion led by Faller & LaTurner 350 Update is proposing to require all interior, windshield, and roof pre- and post-crush measurements be taken from vehicle’s interior and without use of exemplar vehicles -any thoughts? Three laboratories submitted feedback on MwRSF’s procedure -TRL -Karco Engineering

Occupant Compartment Deformation Responses TRL (Williams) -uses Vehicle Cockpit Deformation Index (VCDI) from EN discussed preferred methods for marking points in footwell without addressing measuring techniques Karco (Ivory) -uses exemplar vehicle for measurements -can use Faro arm to digitize interior but not used due to costs

Occupant Compartment Deformation Responses (Continued) E-Tech (LaTurner) -writing formal procedure at this time -technique similar to windshield measurements MwRSF -currently, measurements taken from two different base points in pickup truck cabs for foot and interior regions -need to formally write procedures for floor, windshield, and roof regions to comply with 350 Update

Accelerometer Mounting Methods Participating laboratories to develop an ILC plan

Questions and Comments What are your expectations for this subcommittee? Should crash testing labs for roadside hardware be required to attend and participate in Subcommittee No. 7 activities? -If yes, then by what date?