Solid Sole 60 Degree Raker

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Sectional Assembly and Installation
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Interior Wall and Ceiling Finish
Cabinet and Countertop Installation
Gable Roofs and Components
Ceilings & Basic Roofing
Basic Setting Out.
Step-by-step assembly instructions
Competency: Draw Wall Sections
Split Sole 45 Degree Raker
Mortise Locks Created by M.Martin 9/05. Types - your Ref: P45 of textbook.
Framing Agriculture Structures
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Evaluate area for vertical shore placement and determine length for header and sole. Header and sole will utilize 12” O.H. for outside vertical posts and.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
OSHA Office of Training and Education
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Structural Collapse: Shoring
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
2 Post Vertical Shore/Laced Post
All About Flats By Samantha Lee. What is a flat? Theatre flats are large pieces of constructed and painted wood that are placed on the stage to serve.
ROOF.
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Gable, Gambrel, and Shed Roofs
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Presentation 26: HIP RAFTER LAYOUT.
Lesson 9 Framing Agriculture Structures Next Generation Science/Common Core Standards Addressed!  CCSS.ELA Literacy Cite specific textual evidence to.
Header and Sole should be cut at 48”. Verticals should be measured to reflect total height of void to be shored minus 8 ½”. 8 ½” accounts for the dimension.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
LESSON TOPIC 1.2 SHORING.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Roof and Ceiling Framing
Scratch Build a Water Tower
Wall Framing Grimsby Secondary School Technology Dept.
Ag Construction Studs Vertical framing boards are called.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Roof Types, Components & Terminology
Structural Engineering
After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses.
How to Build a Divider Wall By Charysse Roberson.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Blocking a b c d.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Drafting 2 (Arch) Quiz Review #5
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Mezzanine Build Plans.
Installation Walkthrough Image Guide
Framing Agriculture Structures
Competency: Draw Wall Sections
Surface Area and Volume
Stick Together & Civil Structures
Framing Agriculture Structures
Design Brief Liam and Dorsa.
Break down Lance rack Cut one of each of these for each rack
Competency: Draw Wall Sections
Introduction The Gamma Bracing System
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
Introduction The Gamma Bracing System
Presentation transcript:

Solid Sole 60 Degree Raker 30” Wall plate should measure the insertion point height plus 3 ½” to accommodate the rise of capture from the sole plate and 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Ex. A 8’ insertion point would receive a wall plate = 10’ 9 ½ “ Application: Cut the wall plate and lay it down face up and nail the 30” cleat onto the top 30” mark of the wall plate.

Solid Sole 60 Degree Raker Sole plate should measure the insertion point height X 7. This calculation is based on the rise/run ratio for a 60 degree system of 12/7. plus 2’ to accommodate a 24” cleat. The 24” cleat receives 14 X 16d nails. An additional variable needs to be added to the sole plate length to accommodate the degree of rack of the wall as well as a wedge pack and the potential length needed to reach the sole anchor system. Ex. A 8’ insertion point would result in an (8 X 7) 54” or 4’6” collection point on the sole plate plus the additional measurements from above = 6’ 9 ½” Application: Cut the sole plate and lay it down face up and pre nail the 24” cleat onto the 8’ mark from the front edge of the sole plate ***When nailing this cleat only drive one nail into the sole plate to temporarily maintain its position. This collection point requires adjustability and cannot be finish nailed until the shore is pressurized. 6’ 9.5” 54”

Solid Sole 60 Degree Raker Sole Anchors should be engineered when existing anchors are not proximal to desired raker placement or adequate. These anchors are a minimum of 4”X4”X4’ with 4 – 1”X36” steel pickets driven at 12” spacing at each raker location. Two pickets may be utilized when driven into concrete or paving material. It may be suitable to run one continuos sole anchor to accommodate multiple rakers. Ex. A 16’ X 4”X4” could be utilized to accommodate a three rakers at 6’ spacing between rakers. Application: Measure the distance on the ground that correlates to the sole plate measurement plus 3 ½” for the wall plate, 3 ½” for 4X4 wedges, and 3 ½” for sole plate. This sum results in the distance from the wall at which the sole anchor should be placed. This should be built while the raker shore is being constructed. This diagram represents a bird’s eye view. Drilling holes for the pins results in greater assurance that the pins will be driven plumb. Raker

Solid Sole 60 Degree Raker Raker should measure the insertion point height X 14. The total length of this measurement should be point to point on the completed raker. This is most easily accomplished by cutting one end raker cut and then pulling the total length measurement from the cut point to scribe out the opposing cut. The raker should receive 60 degree raker cut on the top end with opposing 30 degree cut on the bottom end. Ex. A 8’ insertion point would receive a raker = 112” Application: This is quickly accomplished by utilizing a speed square for the 60 and 30 degree scribe and a 2”X 4” block for the 1 ½” return cut. 112” 60 30 30 deg.

Solid Sole 60 Degree Raker Wall Plate and Sole Plate should be joined together insuring that the joint between the two forms a true right angle and is square. This can be accomplished by measuring 3’ up on the outside edge of the wall plate and 4’ out on the outside edge of the sole plate and then insuring that the measurement from mark to mark diagonally = 5’. Careful attention should also be paid to the marriage between the wall plate and the sole plate. The sole plate must butt up against the wall plate. This joint is captured by placing a 12” X 12” gusset on the joint with appropriate dimensional overhang and placing 8 X 8d nails in the wall plate and 5 X 8d nails in the sole plate. 5’ 3’ 4’

Solid Sole 60 Degree Raker Place the raker against the wall plate and sole plate. The cut ends should marry well with the cleats. Capture the wall plate joint by completely covering the joint with a 12X12 gusset and placing 8X8d nails into the wall plate and 5X8d nails into the raker. Capture the sole joint by placing a 12X12 gusset just inside of the return cut and placing 5X8d nails into the raker. The gap between the return cut line and the back edge of the gusset will accommodate a wedge pack that will pressurize the raker and not the gusset. This gusset will be finish nailed once the shore is pressurized. Upon completion, carefully flip the shore over onto the other side and duplicate the entire process. *** This diagram also depicts the 12/7 rise to run ratio of a 60 degree raker and how that correlates to the cleat placement or collection points on the wall plate and sole plate. . 60 deg. 8’ 30 deg. 54”’

Solid Sole 60 Degree Raker Stand the shore up and walk the raker into place. The sole plate cleat should be removed and a wedge pack placed between the return cut of the raker and the new position of the sole plate cleat. Finish nail the cleat. Lightly pressurize the wedges between the sole anchor and the sole plate and then the wedges between the cleat and the raker. insuring that positive contact is maintained between the wall and the wall plate. Insure that the shore is plumb and square to the sole anchor. Prior to final pressurization the wall plate should be pinned to the wall to insure that the shore does not “walk up” the wall. This is accomplished with 3 – ½” X 8” wall anchors. Other variables exist that should be referenced. Once the shore is pressurized and pinned the sole plate / raker gusset should be finish nailed. Rakers that are greater than 11’ in length which correlates to an insertion point of greater than 8’ require a midpoint brace of 2X6 dimensional timber on each side of the shore. These midpoint braces receive 5X16d nails in each end.

Solid Sole 60 Degree Raker Raker shores placed on soil also require a 18” square base utilizing 3 – 2X6X18” timber under the collection point on the sole plate.

Solid Sole 60 Degree Raker Raker Shores should be built as pairs at a minimum to class III status. Maximum spacing is 8’ between shores and cross bracing should be double 2X4 or single 2X6 timber. Mid point cross brace is only required if 4X4 raker length is >11’. (6X6 raker length is >17’). Diagonal “V” bracing is the minimum requirement and should be placed on the cross braces. “X” bracing should be added at a maximum of every 32’ and should always be placed on the end pairs. The “V” bracing which is placed on the cross braces allows spacing for a flush “X” brace when the other brace is run from raker to raker.