Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
A Laser Based Alignment System for the CLIC project
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
H. SCHMICKLER Alignment challenges for a future linear collider.
Measurement report of Boostec girders 1/13 Sylvain GRIFFET, 15/11/2010 Measurements performed on the 28th of October 2010 with the Laser Tracker LTD500.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
Measurements of DB supporting systems Fiducialisation Sylvain GRIFFET, 21/03/2011 Measurements performed in February and early March /13 EDMS n°
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
H. MAINAUD DURAND PACMAN training network A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
List of changes and improvements for the next generation CLIC module
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET

Outline Actual plan Case of MB quad and DB quad Means Proposals and questions

3 Main linac alignment requirements Problem Within +/- 0.1 mm (1  ) Active pre-alignment Beam based alignment Beam based feedbacks Within a few microns Active pre-alignment = Determination of the position of the components in a general coordinate system thanks to alignment systems Re-adjustment thanks to actuators + The zero of each component will be included in a cylinder with a radius of a few microns:  14 μm / 17 μm for main linac components 1 µm Adjustment required: step size below 1 µm, 5 DOF Mechanical pre-alignment PRE-ALIGNMENT (beam off)

Tolerances

5 Alignment strategy Solution proposed (for all area of CLIC) Installation and determination of the Survey network Transfer of reference into tunnel Installation and determination of the tunnel network Combination of 3D triangulation and trilateration coupled with measurements of on vertical plumb wires Methods validated on an LHC pit in 2010 (depth of 65 m): precision of 0.1 mm and accuracy of 0.5 mm Hypothesis considered for CLIC: absolute position at the bottom of each pit: ± 2 mm (depth > 100 m) Distance < 2.5 km

6 BDS: strategy Solution proposed Absolute alignment of the elements Relative alignment of the elements Metrological Reference Network Installed w.r.t the tunnel network Overlapping stretched wires propagating the precision over long distances Simulations in 2009: o Precision at the bottom of the shaft of ± 2 mm o Calibration of metrological plates: ± 5 μm o Distance between pits: 3.5 km o Wires: 400m long Std deviation of 3.6 μm over 200m of sliding window Propagation network simulations

7 Alignment strategy Solution proposed Absolute alignment of the elements Relative alignment of the elements All the components or the supports on which are pre-aligned the components will be aligned w.r.t Metrological Reference Network (overlapping stretched wires)  All the components must be pre-aligned on their supports within a micrometric precision and accuracy  As the requirements of alignment concern the zero of each component, the position of each zero of component must be known within a micrometric precision and accuracy w.r.t the sensor interface. Laser tracker: AT 401 cWPS mechanical interface

8 Alignment strategy Summary of the configuration

9 Alignment strategy Summary of the fiducialisation steps for DB quad: Determination of each zero of component w.r.t fiducials (external alignment references): BPM, DB quad Assembly and measurement of the assembly of components w.r.t their fiducials (DB quad and BPM) Alignment of components on supports (DB quad + BPM on girders) and determination of their position in the support coordinate system Determination of the supports coordinate system w.r.t sensors interface Best solution for accuracy : to group the determination of the zero of the components w.r.t sensors interface! Zero of component to be precised.

10 Alignment strategy Summary of the fiducialisation steps for MB quad: Determination of each zero of component w.r.t fiducials (external alignment references): BPM, MB quad Assembly and measurement of the assembly of components w.r.t their fiducials (MB quad and BPM) Alignment of components on supports (MB quad + BPM on common support) and determination of their position in the support coordinate system, for a given position of micro positioning adjustment system (stabilization) Determination of the supports coordinate system w.r.t sensors interface Best solution for accuracy : to group the determination of the zero of the components w.r.t sensors interface!

11 Alignment strategy 2 solutions concerning the location of sensors: Sensors directly on the components Lever arm effect towards alignment reference (stretched wire) important Heavy load on BPM Sensors mounted on the common support: The position of micro positioning adjustment system must be taken into account Determination of the position of BPM not direct

Means

15 Means and strategy Fiducialisation and dimensional control of objects < 1.2 m: CMM measurements (Tolerances of measurement of Leitz Infinity: 0.3 μm + 1 ppm) For objects > 1.2 m or as control after transport: Combination of « mobile » means: Laser tracker: AT 401 Micro triangulation InstrumentStandard deviation between instruments and CMM measurements AT401< 5 μm Micro triangulation < 5 μm Romer arm< 10 μm Romer arm

16 Some ideas… Objective: the most precise and accurate measurement between the zero of the component and the sensors interfaces.  Perform the measurement of the magnetic axis of DB quad and MB quad in a CMM  If a “vibrating stretched wire” technique is used to perform the magnetic measurements, measure the position of this wire thanks to oWPS and cWPS. Then their mechanical interfaces and the mechanical interfaces of the alignment sensors can be determined through very accurate CMM measurements.  For the DB quad, use WPS mounted on supports installed on the V-shaped supports.

17 Some questions…  Definition of the zero of the components  Case of the MB quad: according to the requirements, the position of BPM should be known more precisely and accurately than the MB quad: 2 configurations to be studied  Clear definition of the tolerances needed: what does “quadrupole offsets: 20 µm” mean?  Kinematic pitch problem raised by Kurt: For the type 1: for a pitch with vertical delta of 1 mm, φ=0.38° - longitudinal displacement of the center of ~ 2.5 mm - vertical displacement ~ 8 µm

Thank you very much!