H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.

Slides:



Advertisements
Similar presentations
What is PACMAN Training Network? Marie Curie Innovative Doctoral Program hosted by CERN Particle Accelerator Components’ Metrology and Alignment to the.
Advertisements

Solomon William KAMUGASA
MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
H. SCHMICKLER Alignment challenges for a future linear collider.
CLIC MDI Working Group QD0 external reference structure A. Gaddi, H. Gerwig, H. Hervé, N. Siegrist, F. Ramos.
Applied Geodesy Group Survey and Alignment of the ILC An approach to cost calculation and network simulations VLCW06 Vancouver, British Columbia, July.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
H. MAINAUD DURAND PACMAN goals and partners A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
H. MAINAUD DURAND PACMAN training network A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
Project Status & Next Steps Solomon William KAMUGASA
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment

2 SUMMARY BDS pre-alignment requirements and strategy MDI area requirements and strategy: o Determination of the position of QD0 w.r.t other components of the BDS o Left w.r.t right side o Monitoring of QD0

3 BDS: requirements concerning pre-alignment Within +/- 0.1 mm (1  ) Active pre-alignment Beam based alignment Beam based feedbacks Within a few microns Active pre-alignment = Determination of the position of the components in a general coordinate system thanks to alignment systems Re-adjustment thanks to actuators + The zero of each component will be included in a cylinder with a radius of a few microns:  10 µm (BDS components) (14 μm / 17 μm for main linac components) Adjustment required: step size below 1 µm, 5 DOF Mechanical pre-alignment PRE-ALIGNMENT (beam off) CLIC Error of misalignment of the fiducials (1σ): 0.02 mm over 200 m Fiducialisation: 0.05 mm rms ILC

4 BDS: strategy Solution proposed Installation and determination of the Survey network Transfer of reference into tunnel Installation and determination of the tunnel network Absolute alignment of the elements Relative alignment of the elements Active prealignment Control and maintenance of the alignment

5 BDS: strategy Solution proposed Installation and determination of the Survey network Transfer of reference into tunnel Installation and determination of the tunnel network Combination of 3D triangulation and trilateration coupled with measurements on vertical plumb wires Methods validated on an LHC pit in 2010 (depth of 65 m): precision of 0.1 mm and accuracy of 0.5 mm Hypothesis considered for CLIC: absolute position at the bottom of each pit: ± 2 mm (depth > 100 m) Distance < 2.5 km

6 BDS: strategy Solution proposed Absolute alignment of the elements Relative alignment of the elements Metrological Reference Network Installed w.r.t the tunnel network Overlapping stretched wires propagating the precision over long distances Simulations in 2009: o Precision at the bottom of the shaft of ± 2 mm o Calibration of metrological plates: ± 5 μm o Distance between pits: 3.5 km o Wires: 400m long Std deviation of 3.6 μm over 200m of sliding window Propagation network simulations

7 BDS: strategy Solution proposed Absolute alignment of the elements Relative alignment of the elements TT1 facility Precision on a 140 m wire: better than 2 microns over 33 days Standard error in the determination: 11 microns in vertical, 17 microns in radial. Can be improved!

8 BDS: strategy Solution proposed Absolute alignment of the elements Relative alignment of the elements SPN: Support Pre-alignment Network : Sensors that are part to the component Micrometric measurements between zero of the component and sensors interfaces

9 Fiducialisation of components Fiducialisation of their common support, including stabilization support Alignment on a common support Whole assembly ready to be aligned Active prealignment Determination of the position

Scientific project PACMAN project: Propose and develop an alternative solution integrating all the alignment steps and technologies at the same time and location (CMM machine)

DMPES ELTOSIT ETALONDE METROLABCH SIGMAPHIFR Cranfield UniversityGB ETH ZürichCH LAPPFR SYMMEFR University of SannioIT IFIC / FESICES Delft University of TechnologyNL Hexagon MetrologyDE National InstrumentsHU TNONL Start date : 1/09/2013 Duration: 4 years Marie Curie Initial Training Network (ITN): Web site: Recruitment under way Innovative Doctoral Program CERN as host institution 10 PhD students associated partners

12 BDS: strategy Solution proposed Active prealignment Adjustment with Cam movers

13 BDS: strategy Solution proposed Active prealignment Cam movers

14 SUMMARY BDS alignment strategy: status and next steps MDI area: o Determination of the position of QD0 w.r.t other components of the BDS o Left w.r.t right side o Monitoring of QD0 o Detector w.r.t BDS geometry

15 MDI area Determination of the position of QD0 w.r.t other components of the BDS (1) Same solution than for BDS Main difference concerns the MRN network (due to lack of space): o No overlapping of stretched wires in the last meters o No HLS system needed for the modeling of the sag, which will be extrapolated Longitudinal position: use of sensors (capacitive, LVDT) to follow the relative position. Strategy proposed : Requirements : Position of the zero of QD0 w.r.t ideal straight line of the 500 last meters of BDS: ± 10 μm rms (including fiducialisation)also needed for ILC (± 20 μm not including fiducialisation) Longitudinal relative position between QD0 and QF1: ± 20 μm rms

16 MDI area Left side w.r.t right side 16 Requirements: Monitoring of the position of left QD0 / right QDO within ± 5 μm rms Determination of left reference line w.r.t right reference line : within ± 0.1 mm rms Monitoring of left reference line w.r.t right reference line : within a few microns Monitoring of one BDS w.r.t other o Link stretched wires on both side by a common references (like in the LHC), using the survey galleries Strategy proposed :

1725 April 2012MDI session at KILC12- Daegu, South Korea17 Mini survey galleries Survey mini galleries

18 MDI area Left side w.r.t right side 18 Monitoring of the position of left QD0 /right QD0: Concept 4 Reference Rings (RR) located at each extremity of QD0, supported from outer tube 6 radial spokes per RR RR spoke Line of sight for alignment systems In two steps: A monitoring of the position of QD0 w.r.t RR thanks to proximity sensors. (initial calibration of their position performed on a CMM) A transfer of the position of RR thanks to 6 spokes to alignment systems. By combination of redundant information, the position of the center of 4 RR is computed.

Transfer quality ~ 0.1 μm (12 dismounting /remounting) Thermal expansion driven by granite thermal expansion, and confirm that the thermal expansion of zerodur is very small Young modulus checked. 19

20 Summary In the MDI area, 3 subjects are under study currently, common to CLIC and ILC: The monitoring of the position of QD0, through a collaboration with NIKHEF Concept proposed First tests performed on 1m long spokes Sensors under validation on TBTM Survey mini galleries Concept proposed The improvement of the fiducialisation process via PACMAN 10 PhD students will start to work on the project beginning of 2014 In the BDS area, taking into consideration the very tight alignment tolerances for ILC, an active alignment will be needed. The solution proposed for CLIC could be applied: Determination of the position of components using alignment sensors Re-adjustment using cam movers.