Set out masonry structures

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Measuring and Layout Tools
Construction Surveys
Basic Setting Out.
BELLWORK SINGLE POINT PERSPECTIVE
Access BDD Survey School
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
CORDLESS DRILL WHAT IS IT ? WHAT IS IT USED FOR ? click here
© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Levelling Checks.
Log Rules. Tree versus Log Volumes Trees contain sections that resemble different geometric solids. Trying to fit one rule to approximate the entire tree.
Surveying Chain Surveying
DATUMS AND BENCH MARKS Gun Metal Bolt Polished Flint Iron Covers Cover Stone Granite Pillar Gun Metal Bolt Name plate Concrete Firm Rock SECTION FUNDAMENTAL.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Fabrication of Fishtank Platform EAS 199B living with the lab.
Precise Digital Leveling Section 7 Wrap-up and Bench Mark Resets.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
OSHAX.org - The Unofficial Guide to the OSHA
Unit 204: Common plumbing processes
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
AIR NAVIGATION Part 3 The 1 in 60 rule.
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
AIR NAVIGATION Part 3 The 1 in 60 rule.
Instructions  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
S.H.H.S Building Construction
Solid Sole 60 Degree Raker
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
CHAPTER 2 CHAIN SURVEYING Tape Measurements
1.Meet B Parmar ( ) 2.Swapnil A Parmar ( ) 3.Pratik C Patel ( ) B.E- 2 SEM MECHANICAL ENGINEERING LINEAR MEASUREMENTS.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
Dry lining by direct bond – overview
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Intro to Power Tools Ag Mech I Class Notes. Objectives AM15.01 Explain how power tools are used in agricultural mechanics. AM15.02 Know and demonstrate.
Chapter (5) Leveling Introduction:
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Left side Right side Note pad Roll block. The Plan.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Ventilation Skill Drills.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Objective 6.03 Remember tools and their safety practices related to the agricultural mechanics industry.
Installing Guttering and Rainwater Systems
This presentation, together with the next few presentations, outline the procedures for measuring and calculating vertical distances. Accurately It is.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Transferring Datums.
Carpentry & Joinery Diploma Level 1 Flash Cards.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Substructure Groundworks - Hazards
Remember tools and their safety practices related to the agricultural mechanics industry. Objective 6.03.
McEvoy and Langston inc
Visit for more Learning Resources
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
PERSPECTIVES & ELEVATIONS
Rectangular Coordinates Level control in trenches
Strip Foundations The foundation runs under all the loadbearing walls.
Cubes Orthographic projections One and Two-point Perspective
Leveling By : Parveen Kumar.
Leveling.
Leveling.
Leveling.
Graphic Communication
Leveling.
Presentation transcript:

Set out masonry structures Unit Outcomes: Interpreting given instructions to establish setting out work to be carried out. Selecting required quantity and quality of resources when setting out and building masonry structures Assisting in the setting out and building of masonry structures to working drawings Mike Dixon

MATERIALS FOR SETTING OUT A BUILDING The following list would be for a small detached house: plans and specifications two measuring tapes (30m),preferably steel optical level Mike Dixon

MATERIALS FOR SETTING OUT A BUILDING • site square (optional) • 50 mm × 50 mm timber pegs • 25 mm × 100 mm timber for profiles • lump hammer to knock in pegs • claw hammer Mike Dixon

MATERIALS FOR SETTING OUT A BUILDING hand saw a line concrete (ballast and cement) to secure pegs (although sometimes unnecessary) sand (for marking out trenches) Mike Dixon

MATERIALS FOR SETTING OUT A BUILDING 50 mm round head nails 75 mm round head nails. The list is not exhaustive, but should give you some idea of what is required. Mike Dixon

RESOURCES FOR TRANSFERRING LEVELS Generally speaking most buildings are built level (horizontal) so it makes sense to do the setting out on a level plane. A building is kept level by various methods. Using datum points and Ordnance Survey bench marks (OBM) in transferring levels. Mike Dixon

RESOURCES FOR TRANSFERRING LEVELS The picture shows the position of the average sea level of the UK. This is called 0.000 metres and is taken from the average level of the sea in Newlyn, Cornwall. Marks are positioned countrywide (shown dotted) in relation to this sea level and are often carved in stone walls, churches, government buildings, or sometimes cast in a concrete pedestal Mike Dixon

RESOURCES FOR TRANSFERRING LEVELS The picture shows a datum with an ‘assumed’ level of 10.000 m. The floor level is 10.000 m so the floor level is the same as the datum. The bottom of the excavation is 9.000 m, so the excavation is 1.000 m below the datum peg. The top of the foundation concrete is 9.150 m. So the thickness of the foundation concrete is, 9.150 – 9.000 = 0.150 m. Mike Dixon

RESOURCES FOR TRANSFERRING LEVELS When the Ordnance Survey system is used for reference, the nearest OBM is used. Then a relative temporary bench mark (TBM), or site datum is positioned on site. It can be in the form of a steel or wooden peg set in concrete and is very often protected by a fence. Mike Dixon

SITE CLEARANCE AND HEALTH AND SAFETY A number of things need to be taken into consideration during the stages of setting out, such as: The tools and equipment required Digging the actual foundation, either by hand or using heavy plant equipment. Mike Dixon

SITE CLEARANCE AND HEALTH AND SAFETY The area where the structure is to be built could have been barren for a long time, and may have become a tipping ground for all kinds of rubbish such as glass, metal objects, even hypodermic needles. Therefore, great care should be taken when clearing the area ready to commence setting out. When putting pegs into the ground, remember that objects can be buried out of sight such as underground pipes and cables. Mike Dixon

SITE CLEARANCE AND HEALTH AND SAFETY Methane gas can also be a problem if the ground has been used previously for material excavation, such as sand or gravel, and then backfilled over the course of time for house construction. Some of these considerations would probably have been checked for at an earlier stage. But you should always be aware and take precautions such as wearing appropriate personal protective equipment. (PPE) Mike Dixon

LOCATING EXISTING SERVICES Before any excavations take place, whether it is digging out foundations or trenches for new drains, etc., a survey of the area must be carried out. This is done to find out whether there are any underground services in the area. These service could be: gas pipes water pipes Mike Dixon

LOCATING EXISTING SERVICES electricity cables telephone cables drainage pipes. Mike Dixon

LOCATING EXISTING SERVICES If a mechanical digger is carrying out the excavation, then damage to the service can happen extremely quickly. The digger bucket can go through the ground and the service without much effort. This can cause delays to the work due to the time it may take to carry out repairs to the damage, which will add extra cost to the project. Mike Dixon

LOCATING EXISTING SERVICES There will also be a great deal of inconvenience to the people in the surrounding area, who may be left with no electricity, gas, water, etc. for a long period of time while the service is being repaired. Service providers can’t always send out a repair crew immediately, and this inconvenience may go on for several days. Mike Dixon

PROCEDURES FOR SETTING OUT Setting out at the right place Finding the right place to set out sounds like an obvious thing to state, but it is very important that this is done absolutely correctly. Buildings have sometimes had to be completely demolished for being put up in the wrong place! This is because building lines and boundary lines are often involved, and there are very strict regulations governing these. Mike Dixon

PROCEDURES FOR SETTING OUT Mike Dixon

DIMENSIONAL ACCURACY It is most important that a building has square (90°) corners. Therefore, the setting out of a building must be square to avoid construction problems later. For example: Roof not fitting! Kitchen units not fitting! Mike Dixon

DIMENSIONAL ACCURACY Site square A site square is an optical instrument used to set out right angles simply and accurately. It is supported by a tripod. The body of the instrument contains two telescopes that are mounted at 90° to each other. The telescopes also pivot vertically so that various distances can be sighted. Mike Dixon

DIMENSIONAL ACCURACY Builder’s square A builder’s square is the most commonly used way of setting out a corner if no optical square is available on the site. It is made of timber or metal and obviously has to be practical enough to be easily carried and held in place for checking corners. Mike Dixon

DIMENSIONAL ACCURACY The 3:4:5 method A building can also be set out using the 3:4:5 method, which is a way of forming right angles using trigonometry. It may sound tricky, but the 3:4:5 rule is not very difficult to understand. Mike Dixon

DIMENSIONAL ACCURACY The 3:4:5 method If you take three straight lines, one 3 cm long, one 4 cm long and one 5 cm long, and then join them together to make a triangle, the angle opposite the longest line will always be a right angle. Mike Dixon

DIMENSIONAL ACCURACY How to set out a right angle using the 3:4:5 method Mike Dixon

METHODS FOR TRANSFERRING LEVELS Mike Dixon

METHODS FOR TRANSFERRING LEVELS Transferring levels by spirit level and straight edge This is a very basic method of transferring a level. Peg B is levelled from peg A (the datum) and then peg C is levelled from peg B. The straight edge and level are rotated 180° at each levelling point to eliminate any error in the level or straight edge. Mike Dixon

METHODS FOR TRANSFERRING LEVELS Optical level An optical level is a levelling device that comprises a camera, a tripod and a staff or grade rod. The camera swivels on a pin projecting from the top of the tripod. The average optical level is accurate to within 6 mm over a distance of approximately 30–40 m. Once placed in position on the tripod and adjusted for level, the optical level projects a level line across the distance between the datum peg and the point to which this datum level is to be transferred. Mike Dixon

TASK Watch the video and then proceed to use the optical level to transfer a level in the room Mike Dixon

METHODS FOR TRANSFERRING LEVELS Optical level Step 1 – securely position tripod and lower level onto pin. Step 2 – adjust optical level using the adjustment knobs at the base of the level. Ensure that the bubble is accurately positioned within the vial on the top of the level. Step 3 – position staff or grade rod on top of the datum peg and adjust focus on optical level until a clear reading can be made. Mike Dixon

METHODS FOR TRANSFERRING LEVELS Optical level Step 4 – take reading at the point where the crosshair of the viewfinder crosses the staff or grade rod. Optical level view Mike Dixon

METHODS FOR TRANSFERRING LEVELS Step 5 – get a second person to move staff to new location to where level is to be transferred. This location is identified by a peg driven into the ground and slightly extended in height to that of the original datum peg. Step 6 – second person holds staff or grade rod against the peg, with its markings or gradings facing the optical level. Mike Dixon

METHODS FOR TRANSFERRING LEVELS Optical level Step 7 – second person moves staff up or down on the instructions of the person using the optical level, until the same reading is established. Step 8 – second person marks base of the staff or grade rod on the peg. Step 9 – a timber rail can be fixed at this point to maintain the mark. The top of the timber rail will be lined across this mark to show the height of the transferred datum level. Transferred level Mike Dixon

Step-by-step guide to setting out a building Make sure you know where the building line and boundaries are 2. Check your equipment before commencing 3. Establish a datum where it will not be disturbed Mike Dixon

Step-by-step guide to setting out a building 4. Always use measurements given and avoid scaling 5. Set out a base line (for example, front of a house). Make sure that you do not infringe on or over the building line 6. Be aware of any underground pipes, etc. Mike Dixon

Step-by-step guide to setting out a building 7. Check the drawings for errors 8. Take all measurements with care and accuracy 9. Check and double check setting out after completion. Mike Dixon

Step-by-step guide to setting out a building Step 1 – Establish frontage line 1. Peg A to Peg B. 2. Nails indicate corners of building. 3. Pegs reasonably level with each other. 4. Pegs must be secure and not move. Mike Dixon

Step-by-step guide to setting out a building Step 2 – Establish peg C Assume sizes are 4 m × 2 m: X² = 4² + 2² X² = 16 + 4 X² = 20 X = √20 X = 4.472 m Two tapes can be used now from A and B to find C. Mike Dixon

Step-by-step guide to setting out a building Step 3 – Establish peg D 1. Use two tapes and measure from pegs C and B. 2. Check diagonals A–D and C–B. 3. Building is square if the diagonals are the same length Mike Dixon

Step-by-step guide to setting out a building Step 4 – Erect profiles at E and F 1. Project line from nails in pegs A and B. 2. Mark profiles with nail or saw cut. 3. Profiles should be 1 m minimum away from face – further if machine digging. Mike Dixon

Step-by-step guide to setting out a building Step 5 – repeat step 3 The profile at peg D showing alternative corner set out Mike Dixon

Step-by-step guide to setting out a building Step 6 – Remove corner pegs 1. Attach continuous line as shown. 2. Line represents face line(s). 3. Line should not ‘bind’ on crossing Mike Dixon

Step-by-step guide to setting out a building Step 7 – Edges of foundations marked on profiles 1. Line attached – plumbed down and marked on ground with sand (shown dotted). . 2. Trenches excavated Mike Dixon

Step-by-step guide to setting out a building Locating walling and trench positions As part of setting out, you must accurately locate walling and trench positions onto both single wall and corner type profiles. Mike Dixon

Step-by-step guide to setting out a building Once the centre lines have been established onto the profiles, the trench positions and wall positions can be marked onto them, using the drawing and specification to determine the cavity size, wall thicknesses and foundation width. Mike Dixon

Step-by-step guide to setting out a building These measurements can then be added to the profile by the use of nails or saw cuts. Mike Dixon

Step-by-step guide to setting out a building Space between profiles and excavations The working space required between profiles depends on the method of excavation. When machines are used in excavations, There needs to be space to allow the machines to move. If trenches are to be dug out by machine, the spoil either has to be put into piles within reach of the bucket arm or carried away using a dumper. In this case, if the profiles are too close together they may be damaged or run over by the machines Mike Dixon

Step-by-step guide to setting out a building If the foundation is going to be dug by hand, less room will be needed as the spoil is removed by wheelbarrow. Mike Dixon

Step-by-step guide to setting out a building Transferring setting out information onto foundation concrete Marking wall positions onto concrete can be done by using spray paint, chalk or mortar to mark position lines. Use a level to plumb down onto the concrete foundation, with the top of the level just about touching the line. Mike Dixon