02.05.2011 Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

RFQ End Flange Dipole Tuner Finger Cooling. Basis of Study Need multi-purpose end flange –Adjustable dipole mode suppression fingers –Beam current transformer.
Basic Governing Differential Equations
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Radiopharmaceutical Production Target Foil Characteristics STOP.
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
MICE Collaboration meeting at Columbia University, New York 12 – 14 June 2003 How Liquid Hydrogen behaves thermally in a Convective Absorber by Wing Lau,
Target & Horns Fluxes were distributed. W/ J-PARC type 2.5 o, 2 o, 3 o. Target cooling evaluation and test Target stress analysis Serious stress analysis.
Rotating Tungsten Helium cooled Target RoTHeTa Cyril Kharoua Daniela Ene, Ferenc Mezei, Etam Noah, François Plewinski, Pascal Sabbagh, Luca Massidda (CRS4,
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
ISIS Second Target Station
Proton Accelerators for Science and Innovation Workshop at Fermilab
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
ICHS4, San Francisco, September E. Papanikolaou, D. Baraldi Joint Research Centre - Institute for Energy and Transport
1 cm diameter tungsten target Goran Skoro University of Sheffield.
Study of a new high power spallation target concept
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA | UNCLASSIFIED | 1 Post Irradiation Examination of an Alloy 718.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
Consideration of Baffle cooling scheme
Mitglied der Helmholtz-Gemeinschaft TIK 3.1 Moderator & Reflector System TAC Meeting 15. October 2015 | Yannick Beßler (FZJ), Daniel Lyngh (ESSS)
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Felix Dietrich | LCWS 2014 | | Target stress Analysis at DESY Felix Dietrich (TH-Wildau), James Howarth, Sabine Riemann (DESY), Friedrich Staufenbiel.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
1 mm 1.5 mm 2 mm 0.5 mm 1.5 mm ABSTRACT Within the framework of fusion technology research and development, a neutron source has long been considered a.
TIK 3.1 Moderator & Reflector System
Beam Instrumentation in Monolith Stephen Molloy PBI Taskforce Leader.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Mitglied der Helmholtz-Gemeinschaft ESS cold and thermal Moderators Moderator & Reflector System Project Introduction Meeting | Yannick Beßler,
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
3 May th High Power Targetry Workshop - Malmö1/25 Free Surface and Splashing Simulation of a Windowless Target Concept for ESS Luca Massidda, Vincent.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
Mitglied der Helmholtz-Gemeinschaft Automated adjustment of the electron beam line of the 2 MeV Electron Cooler at COSY March 11, 2015 | 17:15 | A.Halama.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
ANNE I. S. HOLM AARHUS UNIVERSITET INSTITUT FOR FYSIK OG ASTRONOMI BASELINE DESIGN OF THE ESS HIGH ENERGY BEAM TRANSPORT LINE ANNE I. S. HOLM.
SPS High Energy LSS5 Thermal contact & cooling aspects
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Beijing Institute of Technology
Crab Cavity HOM Coupler Specification Drawings & Tolerances
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Tungsten Powder Test at HiRadMat Scientific Motivation
Beam Window Studies for Superbeams
EUROnu Beam Window Studies Stress and Cooling Analysis
E. Papanikolaou, D. Baraldi
Beam dump for J-Parc neutrino facility
Update on Fracture Analyses
RSFs & categorisation 20 May, 2019.
SPL-SB and NF Beam Window Studies Stress Analysis
APTM and GRID interface requirement PBIP and PBW
Presentation transcript:

Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th High Power Targetry Workshop - Malmö, Sweden, May 2nd to May 6th 2011

Zentralabteilung Technologie Purpose of work Design principle of the proton beam window (from 2003) Location of the PBW in ESS Assumed beam profile Analytical calculations CFD calculations for water cooling CFD calculations for helium cooling Conclusion and outlook Outline

Zentralabteilung Technologie Purpose of Work - In 2003 a novel type of Proton Beam Window (PBW) for high beam current densities was proposed by Juelich. Due to the end of the ESS-Work in 2003 only very rough investigations were possible. - This work picks up the 2003 design idea adjusted to the actual proton beam parameters for ESS. - Providing more in depth calculation for water and even He cooling. - Optimize the design to minimize stress. - Show potential of this design. - Presentation shows current status of ongoing work

Zentralabteilung Technologie Design principle of the PBW Reduce wall thickness by reducing radius to minimize heat deposited in window proof of manufacturing sample

Zentralabteilung Technologie The Proton Beam Window in the ESS Target Station - The PBW separates the accelerator vacuum from the atmosphere around the target. - The atmosphere around the target could either be a rough vacuum or helium at atmospheric pressure. - Distance from the target is mainly defined by accessibility for handling. Most likely more that 1.5 meter. - Therefore the beam footprint at the PBW <> beam footprint at the Target. - ESS Proton beam line design for the last few meters before the target not fixed yet. - Most likely the footprint at the PBW will be smaller (higher peak current density).

Zentralabteilung Technologie The Proton Beam Window in the ESS Target Station Target PBW Collimator ? Beam Envelope ESS 2003 LP2011 ESS design approach for rotating Target ~ 1.5 m

Zentralabteilung Technologie Assumed beam and heat deposit profile Since beam profile at target and even more at the PBW is not fixed we took the following conservative assumption: Beam size to be double Gaussian with ± 2·  within footprint of 200 x 60 mm (same size as beam on target), assuming no shrinking of the footprint at the PBW. Most likely the beam footprint will be smaller at the position of the PBW. Therefore the current density (and thus peak current density) is assumed to be about double compared to the value at the target. Mathematically this corresponds to a 10 MW proton beam.

Zentralabteilung Technologie Design Loads and Boundary Conditions Peak heat deposition by protons in the tungsten target was calculated (Sordo et al.) to be ~ 3 W/mm³. Scaling by density (aluminum vs. tungsten) leads to 0.43 W/mm³. We conservatively doubled to 1 W/mm³ Pressure of cooling medium was chosen to be 10 bars for water and 40 bars for helium Pressure difference over window was chosen to be 1 bar Window material Al 6061 T6 Sordo et al.

Zentralabteilung Technologie Heat load used for Calculation Gaussian profile   =2, P 0 = 1kW/cm³ (± 2·  within beam footprint) Al 6061 – T6

Zentralabteilung Technologie Analytical calculations (VDI Wärmeatlas) water / 10 bars / 40 °C he / 40 bars / 40 °C

Zentralabteilung Technologie CFD results for Water cooling (T in = 40°) mean velocity 3.2 m/s

Zentralabteilung Technologie Stress for Water Cooling point of highest stress max. stress in beam region ~35 MPa

Zentralabteilung Technologie CFD results for Helium cooling (T in = 40°) mean velocity 54 m/s

Zentralabteilung Technologie Stress for Helium Cooling max. stress in beam region ~116 MPa (inside pipe)

Zentralabteilung Technologie Conclusions and Outlook - Even with very conservative assumptions this type of PBW should be good for more than 5 MW beam power if cooled by water. - Helium cooling seems to be possible. Values for temperature and stress are still acceptable. Helium cooling would be beneficial in case of cooling medium leaking into the accelerator. - There is still room for optimization of the design. - We will look into alternative materials (to allow higher temperatures for Helium cooling) - As soon as beam foot print data will be available for ESS we could significantly reduce conservatism. Thank you for your attention