Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM-2012-0026 Safely Delivering the Department of Energy’s Vision for the.

Slides:



Advertisements
Similar presentations
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Advertisements

Eduardo J Salazar-Vega, MPH CPH Jan Koehn, MS CIH.
TurnKey Project Management Services Capabilities Briefing.
1 MARLAP, MARSSIM and RETS- REMP: How is All of this Related…or NOT? Robert Litman, Ph.D. Eric L. Darois, MS, CHP Radiation Safety & Control Services,
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
PRESENTED BY PETER A. SALPAS, PH.D., SALPAS CONSULTING, INC. WITH PATRICIA J. HALSEY, U.S. DEPARTMENT OF ENERGY DEIDRE THARPE, RESTORATION SERVICES, INC.
Crane Operations Objective
National Committee for the Certification of Radiation Protection Officer SAFETY AND WORK PROCEDURE IN SALES OF RADIOACTIVE MATERIAL AND IRRADIATING APPARATUS.
WORKER EDUCATION AND TRAINING PROGRAM UPDATE: A Partnership for Worker Protection DOE/ NIEHS Nuclear Worker Training Program DOE and DOE Contractors.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Office of River Protection 2014 Hanford ORP Site Status Report Glen Clark, WRPS 2014 ASP Workshop September, 2014 Albuquerque, NM Glen Clark, WRPS.
Developing a Chemical Risk Management Program
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
U.S. Department of Energy’s Consolidated Audit Program (DOECAP) U.S. Department of Energy’s Consolidated Audit Program (DOECAP) Dr. Todd L. Hardt DOECAP.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
Control Selection Techniques Employed for D&D Projects with Emphasis on Nuclear Criticality Safety Controls Brenda L. Hawks Engineering Director Oak Ridge.
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
1Managed by UT-Battelle for the Department of Energy Doing Business with Oak Ridge National Laboratory Presented to the SBTDC Opportunities 2008 Will Minter,
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Copyright ©2000 Business & Legal Reports, Inc. SPCC Safety Training Presentations Spill Prevention and Control.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
H&S Consultants Consulting Services and Project Management.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
Doing Business with Oak Ridge National Laboratory Presented to 22 nd Annual OSDBU Procurement Conference Keith S. Joy, Director ORNL Small Business Programs.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Geneva, Switzerland5-7 April, 2004 Monitoring of radioactively contaminated scrap metal in Latvia A.Dreimanis (Radiation Safety Centre, Latvia)
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
Office of River Protection 2015 Hanford ORP Site Status Report
OSU-CHS ALARA Statement The OSU-CHS radiation safety program will be conducted in such a manner so that exposure to faculty, staff, students, the public,
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
An Alternative Disposal Method for Activated PCB Capacitors N.M. Brachmann F.R. Brumwell S.W. Butala S.Y. Chen J.-J. Cheng Presented at the DOE Accelerator.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
1 Operations Objectives April 21, Q
Performance Based Trending of Waste Disposition Project Data Quality Presented by Gary Coleman M.S. Nuclear Safety Engineer Bechtel Jacobs Company LLC.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Integrating Human Performance Improvement Concepts and Tools into Work Planning CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Bob Cochran Chair, EFCOG Energy Facility Contractors Group Achieving Excellence in Management and Operations.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Tripartite Meeting Tokyo, September 2007 Ship Recycling An Overview of Regulatory and Industry Developments Presented by INTERTANKO and ICS on behalf of.
1 X Oak Ridge Office of Environmental Management 2015 Site Status Report Presented by Vanna Gaffney.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 DOE Oak Ridge Office Rebecca Whitehead.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Progress in EM’s Footprint Reduction for the Oakland Projects Office Projects Rich Schassburger November 16, 2010.
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
Site Control Instructional Goal The participant will see the need for a well-planned site control program and will experience some of the decision making.
SITE EMERGENCY RESPONSE All sites are different. Different chemicals. Different configurations. Advance planning and training is necessary to protect worker.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
Duties of the Resident Inspectors at the Texas Low- Level Radioactive Waste Disposal Facility in Andrews County Diane Wakefield, Health Physicist, Resident.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
Best Practices in Performing DSA Legacy Reviews
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Oak Ridge Office of Environmental Management Update
Davisville Junior Public School / Spectrum Alternative Senior School
LANL Onsite Transportation
ES&H for the LCLS Tess Byler, SLAC April 24, 2002
Presentation transcript:

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Safely Delivering the Department of Energy’s Vision for the East Tennessee Technology Park Mission Dynamic Radiological Inventory Control at the Tank W-1A Remediation Project Presented by: Gary Coleman Jr., M.S., Nuclear Safety Engineer Energy Facility Contractors Group (EFCOG) Safety Analysis Workshop May 4-10, 2012, Santa Fe, New Mexico WM

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Dynamic Radiological Inventory Control at the Tank W-1A Remediation Project Presented by Gary Coleman Jr. M.S., Staff Augmentation Nuclear Safety Engineering support to UCOR Oak Ridge via Energy Solutions Co-Authored by Jerry Gnoose, M.S., Staff Augmentation Waste Coordinator support to UCOR Oak Ridge via Energy Solutions Special Thanks to Jimmy Massey, UCOR Project Manager for the Tank W-1 A Remediation Project, and Karen Balo, UCOR Deployed Nuclear Safety Manager for the Tank W-1A Remediation Project

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Background information on Tank W-1A Tank W-1A is located within the main campus of the Oak Ridge National Laboratory (ORNL) Tank W-1A was installed in the 1950’s, and removed from service in 1986 While in service, Tank W-1A collected wastes from several high radiation analytical facilities at ORNL

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Background information on Tank W-1A During it’s operation, transfer lines to the tank leaked causing soil and groundwater contamination in the vicinity of the tank Remediation has been completed, and included removal of contaminated soil, the tank, and the concrete saddles and pad that supported the tank

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1 A Location

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1 A Facility

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Methodology Due to the close proximity of the project to other working facilities and personnel, there is a need for strict inventory control at the facility footprint The Tank W-1A Detailed Inventory Spreadsheet (TWDIS) was constructed to control and track dynamic inventory of Tank W-1A boxes of soil and waste staged within the Tank W-1A footprint

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Methodology ALARA concerns for workers on the site - footprint limited the number of filled containers to 24 A maximum of 6 boxes that had not been through confirmatory NDA were allowed to be on site

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Methodology The initial condition (IC) for inventory control was derived from the ALARA Design Plan, which formed the Specific Administrative Control (SAC) for inventory control Because of the high radiation levels from the soil, it was necessary to limit the number of containers on site to prevent unacceptable exposure at the project site boundary The Material at Risk (MAR) with the worst case 24 boxes were calculated to support the values used in the Safety Basis Hazard Evaluation (HE)

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Facility Footprint Processing Plan

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM B-25 Boxes Being Filled Inside the Enclosure

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Remote Camera View: ALARA at Work

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM B-25 Box Non-destructive Assay Station Onsite

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM B-25 Box Non-destructive Assay Station Onsite

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Radiological Inventory Juggling

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1A Detailed Inventory Spreadsheet The TWDIS Spreadsheet was developed as an aid to control and track the inventory of processed boxes within the project boundary The spreadsheet was developed and controlled in accordance with company Information Technology (IT) requirements for level 2 “Safety Significant Software” The spreadsheet was accessed by the Waste Coordinator and two back-up designees. Others were given “Read-Only” access as needed

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1A Detailed Inventory Spreadsheet Totals Empty/Vendor Site0 Empty/Container Staging Area8Section A Empty/Tank W-1A Site0Section B Full/Inside Weather Enclosure0Section C Full/Inside Service Annex0Section D Full/Awaiting NDA0Section E Full/Quarantine0 Full/NDA Complete0Section F Full/WDP Staging Area0Section G Full/Shipped to NNSS317Section H

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1A Detailed Inventory Spreadsheet Empty Containers8 Total Full Containers317 # Containers Offsite317Sections G + H # Containers Onsite0 # Containers (C,D,E+Q)0</= 6 per SAC of DSA # Containers (F)0</=18 per SAC of DSA

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank W-1A Detailed Inventory Spreadsheet The TWDIS Spreadsheet contains warning notes for the user when the container count exceeds 80 % of the DSA limit The user has advanced warning to prevent inadvertent exceedance of the respective DSA limit There were several other warning parameters loaded into the spreadsheet, to manage inventories inside the Weather Enclosure, and outside on the facility footprint

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM The Tank Being Removed Inside the Enclosure

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Results Excavation operations began in September of 2011 and concluded in April of B-25 boxes were filled, surveyed, characterized, and shipped off-site There were no inventory control violations, as the operations crew worked very closely with the Waste Coordinator to communicate container movements in accordance with the DSA SAC’s

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM B-25 Boxes Being Loaded for Shipment

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Conclusion The TWDIS Spreadsheet is a cost-effective yet rigorous method for protecting the assumptions listed in the project DSA, and flowed into the operating procedures A search of the DOE Lessons Learned system revealed several examples of radiological inventory control violations that were related to lack of vigorous controls with regards to inventory movement and control Operations in Category 2 Nuclear Facilities should be held to the highest standards with regards to Conduct of Operations

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Conclusion The TWDIS spreadsheet is just one small example of the rigor needed to safely and effectively conclude clean-up operations at a Category 2 Nuclear Facility

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM References BJC/OR-3420 Removal Action for Tank W-1A at the Oak Ridge National Laboratory, Oak Ridge, Tennessee, Project and Facility ALARA Design Review Checklist, Bechtel Jacobs Company LLC, May 2010 DSA-OR-TW1A-0051 Rev.7, Documented Safety Analysis for the Tank W-1A (Corehole 8) Removal Action, URS/CH2M Oak Ridge (UCOR), February 2012

Safely Delivering DOE’s Vision for the East Tennessee Technology Park Mission WM Thank you for your attention! Any Questions? I can be contacted at :