Plant Revitalization Task Force November 19, 2012.

Slides:



Advertisements
Similar presentations
PSC Update: Wind Energy Issues James W. Ellars, P.E. Chief Utilities Manager, Engineering Division Public Service Commission of West Virginia.
Advertisements

Siting Decisions Involving Renewable Energy Sources May 16, 2013 Paul Roberti, Commissioner Rhode Island Public Utilities Commission.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
Environmental Protection Commission of Hillsborough County Rule Revision Update June 28, 2012.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
NARUC/NIGERIA REGULATORY PARTNERSHIP Peer Review Presented by Elijah Abinah Assistant Director Public Utilities Division Arizona Corporation Commission.
Conservation Commissions and the Kinder Morgan Proposed Gas Pipeline PRESENTATION TO NORTHEAST MUNICIPAL GAS PIPELINE COALITION SEPTEMBER 22, 2014 MASSACHUSETTS.
National Pollutant Discharge Elimination System -NPDES Permit Process-
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Planning Permission Process and Procedures
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
CAMPUT 2015 Energy Regulation Course Donald Gordon Conference Centre Queen's University, Kingston, Ontario Role of Tribunal Staff, Interveners and Independent.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Sector Planning Process Alachua County Commission July 8 th,
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Environmental Impact Assessment (EIA): Overview
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Water Supply Planning Initiative State Water Commission November 22, 2004.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
Federal Energy Regulatory Commission The FERC Regulatory Process Dennis H. Melvin, Esq. Director – Legal Division (OAL) Federal Energy Regulatory Commission.
Module 1: Introduction to the Superfund Program. 2 Module Objectives q Explain the legislative history of Superfund q Describe the relationship between.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
WIND ENERGY SITING REFORM LEGISLATION Kenneth Kimmell, General Counsel, Executive Office of Energy and Environmental Affairs.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
1 CDBG and Environmental Review For Local Officials.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Chapter 39 Environmental Law. 2  Under what common law theories may polluters be held liable?  What is an environmental impact statement? What is the.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pete Doorn Special Remediation Branch Superfund Section Division of Waste Management
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Prepared by: Alex Fisch Planning Services Division.
Energy Policy Act – 2005 West-Wide Energy Corridors.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
Hidden Hills Solar Energy Generating System (HHSEGS) Presentation to Inyo County Board of Supervisors March 13, 2012.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
AES HUNTINGTON BEACH ENERGY PROJECT
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
SEQRA as a Tool to Review Energy Projects
Improving Energy Facilities Siting in Massachusetts
WIND ENERGY SITING REFORM LEGISLATION
Presentation transcript:

Plant Revitalization Task Force November 19, 2012

Energy Facilities Siting Board: Purpose and Structure Statutory purpose: Review proposed energy facilities so as to provide a reliable energy supply with minimum impact on environment at the lowest possible cost. G.L. c. 164, §69H EFSB has siting jurisdiction over power plants, transmission lines, intrastate gas pipelines, and large natural gas & oil storage facilities EFSB is a nine-member board chaired by the Secretary of EEA; also includes DPU (2), EOHED, DEP, DOER, and three public members (with labor, environmental, and energy expertise) -Statutory authority specified in G.L. c. 164 §§69G - 69S -Regulations specified in 980 CMR EFSB is administratively part of the Dept. of Public Utilities (DPU) DPU Siting Division is staff to the Siting Board and the DPU Commission. Adjudicates cases; prepares decisions for review 2

Energy Facilities Siting Board: Generation Facility Reviews A “ Generation facility” is defined as “ … any generating unit designed for or capable of operating at a gross capacity of 100 megawatts or more, including associated buildings, ancillary structures, transmission and pipeline interconnections that are not otherwise facilities, and fuel storage facilities.” Prior to electric restructuring, Board reviewed the need for, cost of, alternative sites and environmental impacts of electric generating facilities. Board review is now focused on environmental impacts To approve a proposal, the Board must find that that environmental impacts and mitigation costs are minimized. G.L. c. 164, §69J ¼ One year timeline is specified in statute for EFSB cases, but there are no penalties or “constructive approval” if not met. Possible outcomes: approval (with conditions); denial, or withdrawn request 3

Energy Facilities Siting Board: Standards of Review Decisions based on record evidence, statutory requirements, and case precedents Decisions incorporate existing regulatory requirements and guidelines of federal, state, and local authorities; the Board can also impose more stringent requirements to achieve necessary impact mitigation Siting decisions also apply “policies of the Commonwealth” specifically enacted to guide the EFSB: - Environmental justice policy of EEA - Cumulative health impact considerations - Climate change policies 4

Footprint Power Salem Harbor: Overview of Petition to EFSB Petition filed with EFSB on August 3, 2012; seeking approval to construct a 692 MW natural gas-fired, quick- start combined-cycle generating facility pursuant to G.L. c. 164, §69J ¼ Footprint acquired entire 65-acre site where existing Salem Harbor Units are located Beginning June 1, 2014, Footprint proposes to demolish and remove all above-ground features of existing units; Footprint states that it will remediate the entire 65-acre site New facility including all ancillary structures will occupy 16 acres of site; National Grid Substation on site 5

EFSB Footprint Proceeding: Current Status Pre-adjudicatory phase is complete (Public notice, public comment hearing in Salem, site visit, opportunity to become intervenor/party in the adjudicatory phase) EFSB process is now in the adjudicatory phase First discovery responses due later this week, then more written interrogatories from Staff and other Parties Evidentiary hearings later; EFSB decision must be based on record evidence Today’s presentation is based on the Petition & site visit; issues based on discovery to date and prior experience with generation cases 6

EFSB Footprint Proceeding: Procedural Considerations Parties are free to raise new issues or argue whether information being sought is relevant, in need of confidential treatment, or within the scope of the proceeding Board must be open-minded and impartial throughout the proceeding; it decides issues as they are raised and in the written decision At this time, Staff (and Board) cannot opine on merits of Petition or state their views about the record 7

EFSB Footprint Proceeding: Intervenors City of Salem Salem State University Historic Derby Street Neighborhood Assn./Point Neighborhood Assn. North Shore Community Development Coalition IBEW Local 326 Salem Alliance for the Environment (SAFE) Conservation Law Foundation (CLF) National Grid 8

EFSB Footprint Proceeding: Description of Site Use/Remediation Footprint states that remaining 49-acres are available for development and it is in discussions with City of Salem about potential future uses; suggests that final development decisions may not be made until after EFSB decision Site characterization process has begun; expected to be complete within 2 months Until that process is complete, the extent of site contamination and potential clean-up approach and costs is unclear 9

EFSB Footprint Proceeding: Remediation Considerations Likely that remediation of the entire site will be addressed in the EFSB proceeding, although final development plans still evolving As part of conditions, the Siting Board may define the degree or extent of any necessary cleanup, consistent with -- or perhaps even exceeding – established DEP requirements. Future use of the site and remediation standards are closely linked Possible that other 49 acres could offer opportunities for additional impact mitigation beyond remediation. For example, moving the location of certain buildings or pieces of equipment, or providing additional screening within the 65- acre site, could potentially reduce noise or visual impacts to the surrounding community. 10

EFSB Footprint Proceeding: Major Areas of Review (so far) Noise Visual impacts Air emissions Water use, wetlands and Chapter 91 Solid and hazardous waste; demolition & site remediation Environmental justice Cumulative health impacts Zoning and local approvals Electric and magnetic field (EMF) impacts Construction and traffic impacts Safety Community impact mitigation Other 11

EFSB Footprint Proceeding: Next Steps Continuing discovery by the EFSB staff and intervenors Procedural schedule calls for evidentiary hearings last week of February EFSB will be attending Plant Revitalization Task Force meetings to update participants Findings of the Task Force expected to precede issuance of EFSB decision in late Summer 2013 Questions? 12