Hex Box Breakwaters On Potomac River at low tide. A pier is being built right up to the breakwater and using it to provide calm water for the dock.

Slides:



Advertisements
Similar presentations
Chapter 3 Communities and Biomes
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Module Floor Systems.
Cofferdam.
As one of the first steps in the retrofitting process, workers removed the existing concrete floor.
Construction Geometry
Ocean Vocabulary The energy is being passed through the water as a wave. 2.Wave: the movement of energy through a body of water.
The guide Carlos Cantú. First look the location…. East of London in the county of Kent. The major part of the area we will study lies within the Reculver.
25 seconds left…...
We will resume in: 25 Minutes.
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
Measurement for Civil Engineering works
Rivers Erosion, Weathering, Sediments and Deposits.
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
Foundations and basements
Warm Up Think about where water comes from. Is there more or less water on Earth than there was 1 billion years ago?
Intertidal Zone Ms. Bridgeland. Intertidal Zone Shallow area connected to the beach that is made up of high tides and low tides Talk about habitats that.
Chapter 34 Bridge Construction.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 8 Slide 1 Unit 8 Fireplace and Stair Details.
Ocean coasts support plant and animal life.
Moving to the Oceans – Estuaries 15 8 th Grade Science Copy items in red and images indicated.
Wave Action Chap 11, Sec 2. Essential Questions (Chap 11, Sec 2) 1. How does a wave form? 2. How do waves change near the shore? 3. How do waves affect.
Ocean Waves Text Book Page #
What do all these pictures have in common? 3 answers required.
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
There are many types of bridges including:
Lesson 1: Wave Action. What is a Wave Most waves form when winds blowing across the water’s surface transmit their energy to the water. Waves start in.
CAISSON FOUNDATION.
Aquatic Biomes. Salt in Water Most of the salt in oceans is carried in by rivers.
EARTHS WATER By: Kamiya J. Avery W. LaMarcus J. and JaMarcus W.
Earth’s Land The impact of waves, wind, water and ice on the earth’s land is what causes erosion. ci.uofl.edu/tom/photos/ Hawaii/oahu-waves.jpg.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
Waves and wind batter the coast. In some places the waves erode the land along the coast. This high cliff has rocks that have tumbled down.
Ehringer. Salt marshes  Along the coasts of Florida, salt marshes are the bridges between the sea and the land. They are very productive systems that.
Characteristics of Waves
Galveston coastal fieldwork Task question:. texas/houston/article/Sea-swallowing-Galveston-faster-than-
Tanya Ribakoff B.S. Eckerd College Reef Balls. Half circle shaped concrete balls with different size holes throughout Set on seafloor Submerged at high.
Chapter 9: Water Erosion & Deposition
Interactions with the built and marine environment.
Wetlands and Water Quality By: Allie & Kaitlin. Wetlands Wetlands are important because that’s where the animals and plants live. If we didn’t have the.
GREEN You are responsible for recording everything typed in GREEN on your notes sheet.
Th Estuaries How many meanders do you see? How are they beneficial? - “ Earth: The Water Planet” DVD 9:03 -Coach Lesson 23: “Marine Ecosystems and Estuaries”
SEA WALL Description Concrete or rock barrier built at the foot of cliffs or at the top of a beach. Has a curved face to reflect the waves back into the.
CAISSON FOUNDATION.
FOUNDATIONS.
Construction Inspection for FO Activities - Geosynthetics
Chapter 7 section 2 Marine ecosystems. Marine Ecosystems coastal areas and open ocean. coastal organisms adapt to changes in water level and salinity.
Weathering and Erosion. Wearing Down the Land from Above In addition to the tectonic processes operating within the Earth, there are forces operating.
WAVES and TIDES Section 2.3 page 64 WAVES Large ripples set in motion by steady winds Waves on the surface of water are the result of a transfer of energy.
S.T.B.S. College of Diploma Engineering
The Hydrosphere and Biosphere
Rock & Landforms I-5. Moving Water and Landscapes Water runs downhill –GRAVITY! Water runs downhill –GRAVITY!
Rock & Landforms I-5. Moving Water and Landscapes Water runs downhill –GRAVITY! Water runs downhill –GRAVITY!
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
Chapter 11 Fresh Water.
Theme Review Plants, Seeds and Soil
All You Need to Know About Gabions Gabions. Gabion is a cylindrical cage or a metallic box which is filled with concrete rocks. They find a wide variety.
Planning and Placing Concrete
Water and the Atmosphere Chapter 1 Fresh Water
B.V.Patel Institute of Technology-Diploma studies
L - Walls BEFORE AFTER DESCRIPTION:
Ocean Waves Text Book Page #
PowerPoint 9: Coastal management strategies
Permeable Paving.
River Erosion Erosion shapes the land in different ways as the river moves from its source to its mouth: Near the source of a river, in the upper course,
Erosion at Long Island’s North Shore
Wetlands.
Beach Erosion.
Presentation transcript:

Hex Box Breakwaters On Potomac River at low tide. A pier is being built right up to the breakwater and using it to provide calm water for the dock.

Hex Box Characteristics Dimensions: 8’ long, 3’ to 7’ wide, height 4’ to 6’ Weight varies with height, from 3.6 to 4.5 tons. 11% porosity of wall face from 12” Dia. holes gives wave reflection coefficient of .3 with a 25 foot wave length. This is less than a 1:2 slope rock breakwater and does not consider the extra effects of the angled face on reducing reflection effects. No steel in concrete, Synthetic structural fibers used for reinforcement of the 5000 PSI concrete. Tongue and groove slots in ends lock each box to its neighbor as well as two concrete pins that are driven down through the floor of the box into the riverbed to hold their position.

Hex Breakwater Layout The inside of a hex box fills with sand and allows recruitment of plants and animals in a sunlight, calmer environment. Hex boxes have a higher replacement habitat value than rock, while allowing animals to pass through the large holes in the box’s walls.

Typical Stone Breakwater SAV and grasses cannot grow on rip rap because of the lack of soil and sunlight. They cover up to 5 times the river bottom that a hex box covers, smothering all plant and animal life that may be there under the rock and filter cloth. The large weight of the rock causes settling of the rock into the river bottom and lowering of the breakwater’s effectiveness over time, as well as needing maintenance to replace rock that role off in storms. The rock breakwater is hazardous to people walking on them and to boats passing nearby.

Breakwater Habitat Smooth cordgrass at high tide inside box. Salt meadow hay planted breakwater. Oysters growing inside box. Natural recruitment of SAV inside box.

Installing boxes from truck to water. Flatbed trucks can carry 5 boxes. Launching the plugged box. Looking down at the tongue and groove connection between boxes. Driving 4” concrete pins down through the floor of the box.

Hex Breakwaters being towed into position. The boxes have a draft of 3’ 7” when plugged and floating. This allows distance launching to access areas where you can not reach the shoreline over land. This installation was reached after over a mile of towing from the launch point.

Hex Boxes at Eagle Bay Dec. 20, 2006 3 days after 1st installation. June 29, 2007 2 more breakwaters added up river. Jan 21 07 3 weeks after 1st installation. Aug 8, 2008 during a storm.

Installation downriver from 301 Bridge Aug 9, 2007 Aug 14, 2007 Aug 22, 2007 May 23, 2008