RAILROAD OPERATIONS UPDATE ‘The Monster Arrives” 15 AUG 1969.

Slides:



Advertisements
Similar presentations
Rien Visser, Virginia Tech
Advertisements

Retrieval of damaged truck on Geehi River Aqueduct.
Rigging and Rigging Practices Section G of the Logging Code.
Unit 2 Learning the Basics
Loading and Transporting Logs Section K of the logging code.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Bob cat Skid steer loader
Transportation Infrastructure Technical Assistance Survey (oil counties)
Chapter 7 Negotiating Intersections
U.S.D.A. FOREST SERVICE PACIFIC NORTHWEST REGION (R6) Snag Felling Incident Facilitated Learning Analysis (FLA) Narrative : Two employees were removing.
Proof Coil Chain A welded link chain. Chain size is designated by the diameter of the steel used in making the links (e.g.. 3/16"-3/4"). Made from low.
The Erie Canal.
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
17.3 Transportation.
UNIT #3 The Executive Branch CHAPTER #10 The Federal Bureaucracy LESSON #3 The Many Jobs of the Bureaucracy.
Edwin B. Forsythe NWR Wildlife Drive Repair Report February 8, 2013.
Snapshot of a Typical Week at Fossil Creek. Recent Accomplishments at Fossil Creek Installed 10 portable restrooms throughout the area Re-designed kiosk.
Isolating a person or animal for a period of time to prevent the spread of a contagious disease.
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
Carpet and Rug Cleaning specialist for Professional Carpet Cleaning services in Sutton, Croydon and Wimbledon
Suntraders Company Ltd. / Anthony Kent Gibbons Industrial Park, Christ Church, Barbados BB17101 (246) Fax: (246)
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
1 SAFETY Rail/Line Haul Operations. 2 SAFETY Agenda l Overview l Rail Team Organization l Risk Assessments l Medical support l Safety support l Ground.
Current Integrated Use of Biomass from Forest Treatment Plummer Forest Products.
Engineers Without Borders H&S Presentation
Optimization of Building Deconstruction for DOD Facilities Principle Investigators: Dr. Angela Lindner University of Florida, Environmental Engineering.
Agricultural Careers Logging Specialist By: Dr. Frank Flanders and Ms. Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department.
 After a near miss or incident when asked what happened your most common reply is “ I thought it would work”  This is only the tip of the iceberg.
Wood shredder | Fall 2012 Eric Champagne, Horticultural Supervisor Building Services, Grounds and Event support, University services Building Services,
Today I got to do something I have never done before. I was invited to join a chase crew for a hot air balloon team. This is the first time I have seen.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Brush 341 Winch Operations. B341 PTO Winch The winch on B341is very different from the electric winches on B342. This winch is driven by a PTO off the.
PH: Opening Page – On a colour 7” touch screen monitor. (Acdat – Active Data) which is mounted within the operators vision of the cab.
Unit 9 Railroad Fire Case Study Hutton / Shasta Case Northern California Siskiyou Ranger Unit California Department of Forestry and Fire Protection.
Vehicle Characteristics/Pre-Checks/ Driving/Winching
WARM- UP 1.Which city receives the most annual precipitation? 2.Which city has the longest growing season? 3.The average for July’s climate in Southern.
Use of Mulchers for Fire Line Construction Rory Thompson Researcher Wildfire Fires Operations Research Centre FERIC Western Division Rory Thompson Researcher.
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
3840 NW Bus Evans Rd. – Prineville, OR 97754
Off-road and unusual tracks Off-road and unusual tracks Posted on 1st, 2008 at 3:01 pm Before a self- drive trip, you should carefully study the route.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Timber Harvest Elements of Forestry Kenneth Williams Fisheries Extension Specialist Langston University Aquaculture Extension Program.
A lesson on the industrial Revolution
SHIPPING OPERATION MANAGEMENT
OSHA NOTICE & DISCLAIMER “This material was produced under grant SH20866SH0 from the Occupational Safety and Health Administration, U.S. Department of.
Trinity County Collaborative Group teams up with the Six Rivers National Forest.
Ch. 10: Negotiating Intersections
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
The Urban Game Activity An interactive story of industrialization.
How did building a waterway through New York State change the course of U.S. history?
Hire Different Varieties of Lifting Gear in UK
Snapshot of a Typical Week at Fossil Creek
John Christian President, Logistics, Processing and Disposal
Chapter 6 Life in the New State
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Chapter 18: Planning Your Travel
Integration & Commissioning
Chapter 7 Negotiating Intersections
Performance-driven solutions for tomorrow’s heavy haul world
Logging Equipment Operator
The “Natural” Logger - American Beaver
Flatbed Trucking Companies - Facts You Want To Know
Manual Forklift Suppliers in UAE
Performance-driven solutions for tomorrow’s heavy haul world
Tree Harvesting By Mr. Kennedy.
The “Structall Difference”
6 MMC (Off Site Production)
Section 2 Forest Technologies
Presentation transcript:

RAILROAD OPERATIONS UPDATE ‘The Monster Arrives” 15 AUG 1969

Recall in our last Update, the McCloud River Railroad, in a joint project with the McCloud River Lumber Company, installed a heavy duty End-Ramp at the stub end of the McCloud Team Track. The purpose of this ramp is to facilitate the requirement to handle the increasingly larger forest equipment needed to harvest trees in the rugged and remote region South of McCloud. Future Harvest Area

This Week, the McCloud River Railroad delivered the heaviest piece of logging equipment yet; a large Yarder with associated equipment. Here it is coming Over-the-Hill on a Heavy Duty Flatcar between two Idler-Flats and locomotive #42 ‘Bones’ in command of the train.

The piece of logging equipment featured in this special move is a ‘Washington Iron Works’ two drum Skyline Yarder with a telescoping 80’ Tower (the Cab has been removed for shipment). This machine weighs-in at nearly 350,000lbs when fully equipped for logging. It has a 450hp Cummins engine and can grab trees nearly half a mile away. While not the heaviest load the MRR has ever hauled, it is the heaviest self-propelled machine that it has ever handled.

The Railroad Crews have cut-off the lead Idler-Flatcar and spotted the Heavy Duty Flatcar at the new End-Ramp. The Lumber Company Crews have broken the chains on the load and are in the process of attaching a tow cable to the Yarder which will be used to winch the Yarder down the ramp.

While the other Lumber Company Crews are preparing the Yarder to be winched down the ramp, these Loggers are unloading the Yarder’s Cab onto a waiting Lumber Company Truck using good old fashioned cat bars and muscle. No worries about scratching the paint. The Cab is Armored for the protection of the Operator, and it is going to get scratched-up soon enough anyway… it is a Logging Machine after all.

Looks like the crews have a good handle on it. Slow & Easy gets it Done (especially when the Insurance Underwriter and all the Company Executives are watching). The Lumber Company brought one of their Woods Cats into town to use its winch as a brake while a local Heavy Towing Company was hired to winch the Yarder down the ramp.

FUTURE UPDATES The next phase of the Yarder Operation will be to move the Yarder to the Lumber Company’s Maintenance Facility for final assembly, operator training, and a systems check as Lumber Company crews mount the Yarder’s cab, attach the control systems, and load the drums with 2500 ft of cable in anticipation for a hard but productive life in the woods. This should take about a week. Following final assembly, the next big hurdle will be to drive the Yarder to its’ work site and set it up for logging. Currently we do not have an anticipated date for this. The move of such a large and heavy piece of equipment across several California state roadways and through National Forest land requires a number of State and Federal permits which are currently tied-up in ‘bureaucratic red tape’. In the meantime, McCloud Lumber Company crews are in the process of shoring-up several bridges along the proposed route and building bypass roads across Company Owned land to keep progress moving and to get this Yarder busy Making Money!