Introduction to the future document lifecycle tool User point of view 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG /

Slides:



Advertisements
Similar presentations
Welcome to WebCRD.
Advertisements

Welcome to GoBig Printing | Quick Start Presentation The company that brought you here has spent years perfecting your marketing material. Each product.
Configuration Management
How the MoversPOE E-Tracking System Works for You! Introduction.
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
2 SS 14SS 14 CONTENTS Introduction Product Data management CATIA team PDM CATIA Integration SmarTeam File Management Customization Tools Advantages and.
JJCO Online System MANUAL for Associate Editors. Table of Contents 1.Log In 2.Main Menu 3.Associate Editor Dashboard 4.Checking MS 5.Reviewer Selection.
PRESAGE-CTE Seminar MED Programme MED Programme Paris, 22 nd September 2009.
Recommendations for CERN drawings EDMS
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
A "small" refresher about the new (& some older) functions in SmarTeam/CartWeb Catia Forum – 2011, the 14th of April SmarTeam tricks & tips 1.
David Warne Independent Manufacturing Consultant.
HOW TO REGISTER A TEAM Version 1.04 Rev Season 1v1.04 Rev ASA’s Online Registration.
Meta Tags What are Meta Tags And How Are They Best Used?
Outlook 2007 Tips, Tricks, and Tools. Overview Main Screen Navigation Pane View Pane Reading Pane To–Do Bar Create a New Message Contacts Create a Signature.
Tutorial Introduction Fidelity NTSConnect is an innovative Web-based software solution designed for use by customers of Fidelity National Title Insurance.
CAD Service Update 27 November 2012 P.O. Friman CAD Service th Catia Forum 11/27/2012.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
ASAP (Assessment Submission and Processing) Submission Processing Overview for IRF-PAI IRF Conference May 2, 2012.
ACT! 2008 (10.0) Product Tour for ACT! 2007 (9.0) Users.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
E-Pay 2.0 Upgrade.
Actilab Pharma Online Services User Manual June 2004.
Career Services Center Employer Training. This is the main login page. The link can be found at Employers.
Welcome to a brief overview of the upgraded Education Maintenance Allowance system. This presentation will give you a quick look at the system and will.
Member Mail Order Helpful Hints, Reminders and Tools.
Configuration Management Matti Kuikka CONFIGURATION MANAGEMENT by Matti Kuikka, Unit Manager, Ericsson, Turku, Telecom R&D, Wireless Charging.
WPM What’s behind the icon? Work Programme Management.
Drafting Module - Hatchings 15/09/ th Catia/SmarTeam Users’ Forum1 Drawings quality improvement CATIA V5 R23.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CAD Service Update 20 September 2012 P.O. Friman CAD Service EDMS: th Catia Forum.
WELCOME to the QSNY Portal Public School Self-Study 1.
Markle Site Map + Wireframes. FUNCTIONALITY: Links: Spec Section # Page Buttons: page map Program areas -- Public Engagement through Interactive Technologies.
FMCSA Portal Prioritization Phase 1 Release, December 2010 v1.3 Company: Viewing/Editing Your User Profile.
CATDUA V5 Automation UPDATE.
R.Leuxe13th CATIA FORUM – EDMS Page 1/24 Commercial & Normalized Components in 3D + Materials News and Reminders.
Agenda Basic concepts and demo in service portal (search KB articles)
Click the “Add Team” button to create a brand new team. Click the “View Teams” button to view team’s you have already registered.
R.Leuxe20th CATIA FORUM – EDMS Page 1/16 Updates on screws, materials, pins, and UHV components.
Dassault Israel Helbling Workshop: communication Diego Perini EN/MME Dassault Israel Helbling Workshop: communication - Forum Catia n° /03/2013 -
CS 350, slide set 11 M. Overstreet Old Dominion University Spring 2006.
Introduction CAD Data Exchange CERN 11 th CATIA FORUM 7 th June 2012 B.Riffaud.
17 TH CATIA USER FORUM GUCS. OUTLINE: -GUCS -IMPORTANT MESSAGES -ONGOING ACTIVITIES -DATA EXTRACTION STP, PDF 3DXML Marc Timmins th CATIA.
GUCS News M.Timmins12 th CATIA forum20/09/ GUCS reminder - News from the SMT workshop - 29 th – 30 th of August Outline.
PLM WG News CATIA Forum 2013 March 28th Stephane Bally on behalf of the PLM WG 1.
Latest news from GUCS ( Groupe Utilisateurs Catia-SmarTeam ) T.Klioutchnikova10th Catia Users Forum 22/03/2012.
Managing TDM Drawings Lifecycle WorkFlow Created: March 30, 2006 Updated: April 10, 2006 By: Tony Parker.
ROE WEBSITE SUBMISSION OF RETURNS OF EARNINGS ONLINE.
Can you do this in SmarTeam?
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
PMIS Introduction to Sunflower Release 2.9 New Features And Custom Enhancements Training Presentation US Department of Health and Human Services.
© CGI Group Inc. User Guide Subversion client TortoiseSVN.
Dummy Screens for Online Pre-enrolment 3. Click “Continue” 2. Students under 18 have to download the appropriate Parental Consent Form to be signed by.
REACH 2018 Find your co-registrants and prepare to register jointly.
Tools for WGs Plone Database Communication &Outreach.
Testing Process Roman Yagodka ISS Test Leader.
With rosa sanchez pdr coordinator
Welded assembly General methodologie
Quickr Places & Templates Introduction
CATALOG & New Life Cycle
Markle Site Map + Wireframes.
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
SA DMP TOOL Demonstration
Marc Timmins - GUCS communication
© 2018 The University of Iowa
Blackboard Beginner Level Training
– E.Urrutia for Kraftanlagen / Assystem
Presentation transcript:

Introduction to the future document lifecycle tool User point of view 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°131

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°132 Contents 1.Scope 2.Why a lifecycle process for the 2D and 3D? 3.Pre-requisite - The Profile Card 4.Pre-requisite - Statuses and links between Catia documents 5.The ‘Ready for Check’ 6.Case 1 - Control of a 2D in link with a 3D part 7.Case 2 - Control of a 2D in link with a 3D product 8.Case 3 - Control of a 3D alone 9.Case 4 - Control of a 2D/3D in link with another 3D 10.Global view - Examples 11.The ‘Cancelled’ 12.Impact of the ‘Cancelled’

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n° Scope Mechanical Design OfficesIntegration Design Offices 2D + 3D3D2D

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n° Why a lifecycle process for the 2D and 3D? To synchronise the documents in all databases: Reference + Index  To have the same database for the design offices (Smarteam/Catia = Design Tools) and the downstream services (CDD/EDMS/CDN = visibility of the documentation)  To have archived what has been controlled To manage easily old/new references if necessary  A drawing evolves (so its in-link 3D)  In the future, to follow up the parts of the accelerators/cern-projects through the 3D To use the same 3D for another design  To avoid duplicates  To count the use-cases in any top assembly  Traceability Furthermore, To use the correct tools for the quality control/lifecycle process To re-place the ‘Preliminary’ status

3. Pre-requisite - The Profile Card ITEM 2D 3D CDD Number First Save Smarteam 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°135 Update Cartweb Reminder Filling the attributes correctly

PRE REQUIS 4. Pre-requisite - Statuses and links between Catia documents 3D Product 2D Product 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°136 3D Part 2D Part 2D 2D Part In work Last version Check In In Work Date of last Check In In work A U T O M A T I C C O N T R O L Cancelled

« Children first!! » 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°137 Drawing 5. The Ready for Check What is it? A function used by the designer to say : “ My data is ready to be controlled” A function who verify the states with the Parent Children Links. A function which freeze the data during the Control process. What is archived is what has been checked Nota: For modifying a part in ‘ Ready For Check ‘, the function will be used (see later) RFC In workDate → ProductComponent RFC IF Part or Product RFC → IF RFC → Part in linkParent Children RFC IF RFC → Parent Children Links and Ready For Check Cancelled Ready For Check Propagation Facility -Ready For Check from Parent to all children. + children Drawings.

CDD/CDN 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n° Case 1 - Control of a 2D in link with a 3D part RFC Checked R Cancelled In work PRE-REQUISITE Smarteam ISO Control C1 END Ready For Check Checked Released Cancelled Functional Control C2 OK KO Date MAIL AUTOMATIC MAIL For the parent and the children RFC Checked R RFC Ready For Check = ISO Control (C1) → Checked R Functional Control (C2) → 3D Part2D Part Propagation Facility -Ready For Check from Drawing to all children + children drawings. -Checked or Released from Drawing to 3D in Link.

Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 CDD/CDN 27/11/ Case 2 - Control of a 2D in link with a 3D product RFC Checked R Cancelled In work PRE-REQUISITE Smarteam ISO Control C1 END Ready For Check Checked Released Cancelled Functional Control C2 OK KO Date MAIL AUTOMATIC MAIL For the parent and the children RFC Checked R RFC Ready For Check = ISO Control (C1) → Checked R Functional Control (C2) → RFC Checked R 2D Product3D Parts3D Product2D Parts Propagation Facility -Ready For Check from Drawing to all children + children drawings. -Checked or Released from Drawing to 3D in Link If state of children ≥ state of parents R

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n° Case 3 - Control of a 3D alone Checked R Cancelled In work PRE-REQUISITE Smarteam Ready For Check Checked Released Cancelled KO RFC KO Nota: - No control in CDD - For the commercial parts, don’t forget to give them to the Librarian responsible (Raphael) 3D

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n° Case 4 - Control of a 2D/3D in link with a other 3D + RFC Checked R RFC Ready For Check = ISO Control (C1) → Checked R Functional Control (C2) → 2D Part3D Part3D Part in Link CDD/CDN RFC Checked R Cancelled In work PRE REQUIS Smarteam ISO Control C1 END Ready For Check Checked Released Cancelled Functional Control C2 OK KO Date MAIL AUTOMATIC MAIL For the parent and the children Checked R RFC 2D Part Propagation Facility -Ready For Check from Drawing to all children + children drawings. -Checked or Released from Drawing to 3D in Link If state of children ≥ state of parents R

10. Global view: Ready For Check 3D Product 2D Product 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1312 3D Part 2D Part OK Ready For Check In workDate PRE-REQUISITE RFC Checked R Released OK RFC

10. Global view: Checked 3D Product 2D Product 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1313 3D Part 2D Part OK Ready For Check In workDate PRE-REQUISITE RFC Checked R Released OK Checked R RR R Smarteam Control CDD Control Checked CDD Control

Smarteam Control CDD Control 10. Global View : Released 3D Product 2D Product 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1314 3D Part 2D Part OK Ready For Check In workDate PRE-REQUISITE RFC Checked R Released OK R RR R R Nota: CDD/CDN control = components must be controlled BEFORE doing the assembly validation Release = a.01 become a.

11. The ‘Cancelled’ 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1315 When? - During the quality control.. … when the designer wants to modify the 3D/2D while the documents are in RFC / Checked Designer: ”Ok my documents are ready to be controlled “ → Mail Designer: ”Excuse me but I want to modify my document” → Mail New version in Work (Old is cancelled) … when the controller for the ISO refuses to validate the 2D (thus also the 3D) ISO Controller: “It’s not correct for me” → Mail Designer begins the modifications. New version in Work (Old is cancelled) … when the controller for the Functional refuses to validate the 2D (thus also the 3D) Controller for Functional: “It’s not correct for me” → Mail Designer begins the modifications. New version in Work (Old is cancelled) RFC CDD: ISO Cancelled C.OC.I RFC Cancelled C.OC.I Checked RFC CDD: ISO RFC Cancelled C.OC.I CDD: Functionnal RFC a.01 a.02 a.01 a.02 a.01 a.02

3D Part 12. Impact of the ‘Cancelled’ 3D Product 2D Product 27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1316 3D Part 2D Part OK PRE-REQUISITE RFC Cancelled Checked OK RFC R Cancelled Checked RFC Checked Cancelled C.O C.I RFC

27/11/2012Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°1317 Conclusion A new process tool is going to be born: With this tool, we’ll be able to validate the 2D/3D parts or the 3D alones. Through this presentation, you can see where our - PLM-WG members - thoughts are leading us to. Your suggestions are welcome! Please, contact the PLM-WG. Thanks. Gilles