Template v1 September 12, 2012 1 Copyright © 2012. Infor. All Rights Reserved. www.infor.com Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling.

Slides:



Advertisements
Similar presentations
ERP LN Service Depot RMAs and Repairs Presented by: Strategic Systems Group, Inc.
Advertisements

Template V.16, July 19, 2011 System i Service Management Overview Pete Stamm, Founder, RMB Solutions.
Day 3 Conference Details
Warehouse Management in Microsoft Dynamics AX 2012 R3
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Using the Serialized Item Enhancements Rollout training.
Template v5 October 12, Copyright © Infor. All Rights Reserved. Baan-to-LN Differences Training “Warehousing and Inventory”
Template v7 January 30, Copyright © Infor. All Rights Reserved.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Miscellaneous Project Enhancements.
Template v5 October 12, Copyright © Infor. All Rights Reserved. Baan-to-LN Differences Training “Multi-site and Common Data”
Template v5 October 12, Copyright © Infor. All Rights Reserved.
Supply Chain Logistics Management
Infor Confidential Template V.25, March 9, 2007 Copyright © Infor Global Solutions Infor EAM Overview Dwayne Maxwell, EAM Business Solutions.
Implementing Shop Floor Reporting at Schrader Bridgeport
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: Crediting and Rebilling Invoices Enhancements Rollout.
SALES ORDER MANAGEMENT SYSTEM. According to the current global status, companies can't waste time sourcing suppliers or waiting for information on the.
Day 3 Conference Details
Material Requirement Planning (MRP)
EMBA Session November 15,2012. Overview of Lecture  Review of cost behaviors  Rationale for ABC approach  Factors supporting an ABC system  Cost flows.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Managing the Integration Between Service and Quality.
Template v4 September 27, Copyright © Infor. All Rights Reserved. Day 2 Conference Details Dial-in Information (Also in meeting.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Managing Material Demand for Preventive Maintenance.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Usability Enhancements in Service Overview Rollout.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN An Overview Swaroop Patnaik, Infor.
Template v7 January 30, Copyright © Infor. All Rights Reserved.
Template v4 September 27, Copyright © Infor. All Rights Reserved. Day 2 Conference Details Dial-in Information (Also in meeting.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Infor Warehouse Mobility Transaction Programming Kiran Madduri,
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Quality Management System
Template v5 October 12, Copyright © Infor. All Rights Reserved.
Template v5 October 12, Copyright © Infor. All Rights Reserved. Baan-to-LN Differences Training “Sales, Purchasing & Pricing”
Infor LN 10.4 Invoicing - Advance Invoicing Enhancements
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Using the New Claim Features Rollout training Campus.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Estimating Differences Rollout training.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.3 to v10.4 Moving Average Unit Cost (MAUC) Hours Differences.
Template v4 September 27, Copyright © Infor. All Rights Reserved. Day 4 Conference Details Dial-in Information (Also in meeting.
Presented by D’Sunte Wilson Microsoft Dynamics Nav (Navision) Training – Day 2.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Time Track Installation and Configuration Development Team.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Service - Checking Material Availability in LN service.
Production Process Contents: Maintaining bills of material (BOM) Production process.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN v v10.4 Configurable Contract Deliverables.
Lesson 1: ICBS-R Application Overview. Copyright 2002 Sterling Commerce, Inc. All rights reserved. 2 Agenda WMS Concepts Modeling Participants Managing.
REQUISITIONS, PURCHASE ORDERS, & RECEIPTS Purchasing Application Training Course City of Decatur 1.
Midwest User Group September 23, 2013 Grand Rapids, MI Paul Rubin Strategic Information Group Advanced Repetitive vs. Work Orders The Great Debate.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN - Overview of Kanban Module Swaroop.
Overview Purchase Mantra. Mfg/Pro - Purchasing Agenda Overview of Purchase Module Road Map Schedule Activity List Study Methodology Modeling Training.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Warehouse Mobility for LN - Other Transactions Swaroop Patnaik,
Template v4 September 27, Copyright © Infor. All Rights Reserved. Day 4 Conference Details Dial-in Information (Also in meeting.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Time Track Customizations Development.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
AutoSimply Process Flow. Legend System Process Manual Process System Document Manual Document Flow Connector to another slide Terminator Predefined Process.
Template v7 January 30, Copyright © Infor. All Rights Reserved. 1 LN: v10.4 Subcontracting with Material Flow in Service Overview.
Oracle Apps scm training Purchasing module Contact for free demo : Specto Training
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Infor Factory Track TM 6.00.
M ICROSOFT DYNAMICS AX 2012 T & L ONLINE TRAINING Contact US: visit our website US:
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Quality Management Demonstration
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Infor Factory Track TM 6.01 Composite Barcode Usage.
Contact for free demo session : Specto Training
Template v7 January 30, Copyright © Infor. All Rights Reserved. Infor Confidential Copyright © Infor. All Rights Reserved.
Contact Us : Online | classroom| Corporate Training | certifications | placements|
Activity Based Costing
Common Learning Blocks
Tour - session 9 Work Order Release and Production Activity Control
Presentation transcript:

Template v1 September 12, Copyright © Infor. All Rights Reserved. Infor LN: v10.3 – v10.4 Manufacturing Non-conformance Handling Differences Rollout Training Campus Course Code: 02_ _EEN0471_ELN July 2014 Robert Nooder

Template v1 September 12, Copyright © Infor. All Rights Reserved. Introduction Overview Non-conforming Handling Reject production material Reject production end-item Agenda

Template v1 September 12, Copyright © Infor. All Rights Reserved. Objective new quarantine functionality: Support processes for handling a non-conforming item purchase, warehousing, production (SFC) Support Quarantine Inventory multiple locations, planning Enhance consistency terminology, processes Introduction Pre-requisite: Rollout Training: 02_ _EEN0441_ELN Warehouse Management, Inspection & Quarantine Differences

Template v1 September 12, Copyright © Infor. All Rights Reserved. Overview non-conformance Handling LN 10.3 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap RejectReturnScrap

Template v1 September 12, Copyright © Infor. All Rights Reserved. Overview non-conformance Handling LN 10.4 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap Quarantine Return Rework * ReturnReworkScrap * * * * * * * * * * QuarantineRework * * Return * * new

Template v1 September 12, Copyright © Infor. All Rights Reserved. Overview non-conformance Handling LN 10.4 Materials / Components Warehouse End items Warehouse Material Issue End item Receipt Operation 20 Operation 30 Operation 10 Production order End item Issue Material Receipt Scrap Quarantine Return Rework * ReturnReworkScrap * * * * * * * * * * QuarantineRework * * Return *

Template v1 September 12, Copyright © Infor. All Rights Reserved. Set-up Reject Production End-item / Material Warehouse Inventory Handling Parameters:Quarantine implemented Inventory Handling Parameters:Quarantine Inventory available for planning Warehouse:Quarantine implemented Warehouse:Designated quarantine warehouse Warehouse / Locations:Quarantine locations Item: Item Warehouse Data:Rejects Handling: Scrap, Quarantine, Both Item Warehouse Data:Disposition Due Lead Time

Template v1 September 12, Copyright © Infor. All Rights Reserved. Scenario Production order has been created and released Material has been issued from the warehouse to the shop floor A non-conforming material is found In the session “Material to issue for Production Orders” Reject a quantity of the applicable material Scrap and / or quarantine a quantity of the material Initiate the re-issue of the scrapped and /or quarantined material In the session “Quarantine Inventory” Decide on the disposition Handle the quarantined inventory Handling non-conforming Material

Template v1 September 12, Copyright © Infor. All Rights Reserved. Scenario Production order has been created and released On an operation a non-conformance is found In the session “Report Operations Complete” Reject a quantity of the manufactured item Scrap and / or quarantine the manufactured item In the session “Quarantine Inventory” Decide on the disposition (rework ) Maintain and release the generated production (rework) order Issue the applicable quarantined item Handling non-conforming End-item

Template v1 September 12, Copyright © Infor. All Rights Reserved. Production non-conforming Material Operation 20 Operation 30 Operation 10 Production order Receipt Inspection Bulk/Pick Quarantine Warehouse Staging the material can be moved to quarantine If the disposition is “return to supplier” a return purchase order is created the material can be scrapped

Template v1 September 12, Copyright © Infor. All Rights Reserved. Production order Quality Inspection order Receipt Inspection Bulk/Pick Quarantine Warehouse Staging If the disposition is “rework to existing specification” or “rework to new specification” a production (rework) order is created When QM is implemented and if applicable the quality inspection order (type “routing (TI)”) is created Depending on the outcome of the Quality Inspection Order or a decision outside LN the unfinished manufactured item can be moved to quarantine Production non-conforming manufactured Item Operation 20 Operation 30 Operation 10 Production (rework) order Depending on the outcome of the Quality Inspection Order or a decision outside LN the unfinished manufactured item can be scrapped)