1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Technical Support Activities in PH-ADO-PO
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
V. Bobillier1 Cable installation status.
Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Performances of the HV system out of Drawers Roméo Bonnefoy, Robert Chadelas, Christian Fayard, Marie-Lise Mercier, Eric Sahuc and François Vazeille (LPC.
Upgrade of the TileCAL LVPS System Gary Drake Argonne National Laboratory, USA In Collaboration with The University of Chicago CERN Feb. 25, 2009 ATLAS.
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE7029 ATLAS CMS LHCb Totals
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
PMF STATUS ALFA - Electronics meeting 11th February 2008
"Drawer Mechanics - MiniDrawer"
Tile Upgrade Workshop (CERN- February 2008, 8 and 9)
Upgrade activities at Clermont-Ferrand
Tile Upgrade Workshop (CERN- February and 9)
Concept of Drawers Thoughts on Drawers and mini-Drawers: Small story
Mini-drawers, FE-ASIC , Integrator
R&D on the sliding comparison of standard and mini-drawers
Status of upgrade works at Clermont-Ferrand
Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009)
Radiation- and Magnet field- Tolerant Power Supply System
Status at CERN and commissioning
Presentation transcript:

1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont engineers were at CERN  Late availability of HV cable and Cooling  Instability of Cooling  Test stopped before the first night by Mohamed: No HV Trip during these 5 first hours  Tests continued later by David and Giorgi with a stable Cooling - On LBC44 (week end): 72 hours  No HV Trip - On LBC1 (next week end)  No HV Trip whereas trips (without air) were expected after a couple of hours Comment: Use of linear PS

2  Request reminded since Meeting of March 2 nd  Compressor ready to work, but sniffer pipes not yet available  Proposition of using dedicated pipes for Commissioning with an easy handling  Recommendations  If the extraction of the LBC44 Super-Drawer was kept: - Made by Clermont team - in the presence of Clermont engineers  No HV Commissioning step without using the Compressor  First conclusions: - Confirmation of observations many times reported: strong dependence from the season (Winter/Summer environment) - But it would be wrong to conclude that it is the only possible explanation (see previous talks) - The action of extracting the Super-Drawer LBC44 to have a look inside should be reconsidered  this observed behavior does confirm the experience of experts saying that there will be nothing to look at!

3 HV CANbus tests and Results Historical tests of the HV CANbus Results of CERN and Clermont tests Recommendations Proposed solutions for the near future ’06 March 23 rd Clermont-Ferrand team

4 Historical comparison of the various set ups and test durations in the chronological order of the works Set up # of a full Daisy chain SiteCANbus PS CANbus Long cables? Daisy chain cables Drawer LVPS Test duration 1 Long term test of Opto cards Clermont No and FlatFlat 16 SDrawers DCS testsClermont Long ATLAS cableFlat 16 SDrawers CERN testsATLASClermont Long ATLAS cable ATLAS then flat Some SDrawers Few days in Clermont tests Clermont Long ATLAS cable Flat then ATLAS 16 SDrawers Few days in CERN testsATLASClermont Long ATLAS cable? 16 SDrawers Not yet made  Summary of results: The ATLAS CANbus cable prevents a good working  Good working: Set ups 1, 2, 3 (Flat Daisy chain), 4 (Flat Daisy chain)  Bad working: Set ups 3 (ATLAS Daisy chain), 4 (ATLAS Daisy chains) the set up 4 being more complete (Drawers are supplied)

5 Results of the tests 1. Tests of the HV side at CERN showed a not correct working of the CANbus for a certain number of Drawers (in both A and C sides, ≥12), and a strange stability over time (Stability OK after ~1.5 hour) but replacing the ATLAS CANbus cable by another one (flat in the tests) gives a correct working. 2.These results are completely reproduced at Clermont, but powering the 16 Super-Drawers enhances the bad working using ATLAS cables (Bad working> 4 super-Drawers, but long CANbus cable longer than in the pit of about 50 m) 3. Reducing the transmission speed from 250 Kbit/s to 125 Kbit/s gives a right working using ATLAS CANbus cables 0. It must be clearly known if the CANbus at the readout side works properly when the 16 Super-Drawers of a Daisy chain are all powered in the pit conditions

6 Recommendations - The output voltage of the CANbus PS must be 20V when ATLAS will start (  Drop of ~4V in the long CANbus cable + Regulator specifications) Later, depending from the radiation accumulation effects, the voltage could be increased up to 24V.  Actions: - To come back to the first design of the CANbus PS - Comment: We were sorry to discover the changes made on these PS’s at the HV side … without a good knowledge of the HV electronics and forgetting to inform the Clermont responsibles who manufactured the CANbus PS - A Capacitor has to be installed at the first node of each Daisy Chain (A Filtering to prevent too big consumption when data are transferred, mainly due to the length of the long CANbus cable going to USA)  Actions: - Pull the corresponding Super-Drawer - Fix the Capacitor (inside a dedicated box) at the HV Micro card input

7 Proposed solutions for the near future There are 2 possibilities: what is more painful ?  Playing with the inter-Drawer CANbus cables or with the Drawers ?  In any case, last tests must be made at CERN (Test 5), having all the Super-Drawers powered within one Daisy chain  Change of the cables Actions (mainly on LB) - Good choice of new CANbus cables - De-commissioning of LB then new cabling - Tests at ADC-I side and HV side  Change of the speed Actions (On LB, EBA and EBC: ~3 months with a good access) - Pull every Super-Drawer to access to the Speed switch of each Micro card - De-certification of each Super-Drawer with the risk of induced new failures - Tests to be made at least on the HV side (Clermont HV Test Bench) Warning: No use of MobiDICK (too big job) except if the Commissioning detects failures - New optimization of the HV DCS (  speed decreased) Just after Test 5 completion: A decision must be taken !