D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University ICD Update: January Shutdown Work Lee Sawyer On behalf of Andy White, Mark Sosebee,

Slides:



Advertisements
Similar presentations
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Advertisements

Beam Position Monitors MICE CM Harbin January, 2009.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
ICD Energy Calibration Andy White January 16, 2002.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
25 March DOE Review Alan L. Stone Louisiana Tech University The ICD Project  Purpose & Location within the DØ Detector  History: Run 1 vs 2.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Calorimeter Status Nirmalya Parua, Brook.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
12 March 2002 Calorimeter Software Mtg Alan L. Stone Louisiana Tech University ICD Status High Voltage Changes Invalid Alarms ICD channels in caladdress.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Testing of C-layer bottom hole counters A.Ito, J.Negret, B.Satyanarayana.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Ted Eltzroth RunII Stop in ttbar & ICD. 06/24/02 Ted Eltzroth Stop direct production qq -> tt ->c Z 1 0.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
Calorimeter Status Electronics Installation and Commissioning
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Mini-drawers, FE-ASIC , Integrator
Electronics for RPC Upscope
Cabling Lengths and Timing
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Status of the Crystal Ball
GEM-based Digital Hadron Calorimetry for SiD
Limited Streamer Tube Project Summary
Presentation transcript:

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University ICD Update: January Shutdown Work Lee Sawyer On behalf of Andy White, Mark Sosebee, Barry Spurlock, Ted Elzroth (Univ. of Texas – Arlington), Qun Yu, Alan Stone, and ibid. (Louisiana Tech Univ.)

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University (Some of) The Cast of Characters Mark Sosebee Andy White Qun Yu

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Object of January Shutdown Fix Everything! –When the ICD-N was installed in Fall, 2001, we knew we had some questionable channels. –Other channels weakened or failed since then Both electronics problems (preamp pulser) And PMT or related problems (LED pulser) On the order of 5% dead/bad channels by January –Spare motherboards, HV divider cards (“bases”), and replacement drawers were prepared in anticipation of the shutdown. –New PMTs ordered Past the advertised lifetime for these tubes But we run at low voltage => relatively low integrated current. We anticipated on the order of 10% PMT replacement per year.

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Drawer Repairs Only pulled drawers from the North Endcap –South has been in good shape since installation –Maybe two low channels that we would have liked to have examined on the teststand –Possibility of creating new problems when drawers are pulled => Law of Diminishing Returns sets in! Total of 18 Drawers Pulled –Roughly equal number from NE and NW. –Major effort to uncable/recable an entire crate.

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University ICD Drawers NE Crate NW Crate Documentary evidence that professors occasionally do work…

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Repair Summary: NW NW1-CH1: Replaced PMT#9056 with PMT#7968 NW1-CH2: Replaced signal line (from socket to motherboard) NW1-CH3: Replaced signal line (from socket to motherboard) NW1-CH4: Replaced base NW3-CH3: Replaced preamp NW4-ALL: Replaced entire drawer with spare NW5-CH4: Replaced base NW5-CH5: Replaced preamp NW6-CH4: Replaced base NW7-CH5: Replaced base NW8-CH1: Replaced base NW8-CH4: Replaced preamp NW9-CH1: Replaced base and preamp NW10-CH4: Replaced base NW10-CH6: Replaced PMT#7906 with PMT#4839 NW11-CH2: Replaced PMT#5486 with PMT#8752 NW16-ALL: Replaced pulsar connector P135

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Repair Summary: NE NE5-CH1: Replaced base, replaced PMT#4094 with PMT#7979 NE5-CH2: Replaced base NE5-CH3: Installed spring posts (missing) NE5-CH4: Replaced base, installed spring posts (missing) NE5-CH5: Installed spring posts (missing) NE5-CH6: Relaced PMT socket, installed spring posts (missing) NE6-CH2: Replaced preamp NE6-CH3: Replaced base and preamp NE7-ALL: Replaced entire drawer with spare NE7-CH4: Replaced PMT#7487 with PMT#8019 NE11-CH2: Replaced base NE11-CH6: Replaced preamp, replaced PMT#8011 with PMT#7480 NE13-CH3: Replaced base NE14-CH4: Replaced base NE14:CH6: Replaced base NE16-CH1: Replaced base

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Radioactive Source Testing Andy White and Mark Sosebee also source tested 4.5 supertiles in the NE –Confirms mapping of an additonal 54 channels –Both top and bottom NE quadrants tested –Confirms mapping fixes to CalChan.cpp –In addition to sources testing previously done on other quadrants. We are now confident in the ICD mapping Source testing is tough –Signal hard to distingiush from noise –Need a strong source to penetrate Aluminum box

D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University Conclusions Every ICD channels is being readout –Two weak channels in North and two in the South –A couple of other problems (pulser cable or pulser card in F/O) that do not hamper readout, but debugging a problem in the future. –New PMTs still need to have the High Voltages adjusted Andy W. will do it this week. –Still need to verify teststand MIP response in situ This may be a long-term goal Should teststand channel-to-channel variations be used without verification with collider muons? –Still need to finalize ICD weighting in reconstruction.