Sabine Block 13: Oil Remediation. SS. W. BEAUMONT BACKGROUND – INTIAL INDICATION  OIL SHEEN OBSERVED BY HELICOPTER  PIPELINE WAS INITIAL PROBABLE CAUSE.

Slides:



Advertisements
Similar presentations
L 13 Fluids [2]: Statics  fluids at rest
Advertisements

Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
V-backed stainless steel screen pump intakes: The following Evolution Oil Tools inc product is a screen assembly to prevent large solids from entering.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
SAND CLEANING STATFJORD C FIELD TEST Stavanger 18 – 19 January 2006 Henrik Dannström, MATOR AS.
©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.
CAREERS IN MINING. It’s an exciting time to be involved in the minerals industry.
OIL SPILL DISASTER FROM SUNKEN SHIP AT PARADEEP DR. D. K. BEHERA N. R. SAHOO STATE POLLUTION CONTROL BOARD OCTOBER-2009.
United States Coast Guard Vessel Response Plan Requirements CDR Doug Simpson Sector Ohio Valley Chief, Prevention Dept.
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
By: Kaila & Chelsey Ocean Exploration By: Kaila and Chelsey.
Reservoirs Covered in Ch. 5 of Vickers Text
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
Blue Water Diving Blue Water Diving Guidelines Editor, John Heine A California Sea Grant College Program Publication No. T-CSGCP-014.
Unit 4: Primary Resources Energy from the Oceans.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
USS MISSISSINEWA (AO 59) Oil Offloading Operations Ulithi Atoll, FSM February 2003.
Salvage and Marine Firefighting & CAPS/Dispersant Regulations: Vessel Response Plans for Oil 33 CFR Part 155.
Lesson 8 Offshore Drilling
Drilling for Oil.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Wrecks of the World II Wreck Remediation and Pollution Recovery – Case Studies Zach Malinoski.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
CAREERS IN MINING Rubin Pajoohan Fartak International Engineering co.
Ships in Service Training Material A-M CHAUVEL Risk Assessment Case Study Product Tanker.
NFPA 31 Standard for the installation of Oil- Burning Equipment
©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.
BVN BVN TM PEV2 – Boilers Head Office – Department Technology Equipment - V0 – November 2009.
3 CASE STUDIES - POTENTIALLY POLLUTING WRECKS SS JACOB LUCKENBACH SS PALO ALTO F/V MWAALIL SAAT.
Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003.
David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.
L 13 Fluids [2]: Statics  fluids at rest  More on fluids.  How can a steel boat float.  A ship can float in a cup of water!  Today’s weather Today’s.
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
BARGE DAVY CROCKETT RESPONSE
L 13 Fluids [2]: Statics  fluids at rest  More on fluids.  How can a steel boat float.  A ship can float in a cup of water!  Today’s weather Today’s.
Barge MM53 Field Surveys & Report 29 January 2006 Steve Lehmann, SSC Renn Hanson, Situation Unit.
Oceaneering International Disaster Management ISDS 3100 GROUP 1: ANGELA BUCHER, AANCHAL GUPTA, BENJAMIN PETERS, MEGHAN QUINT, TIMOTHY BABCO.
Scuba Steve Scuba Squad Dive Plan. Site Assessment Our Mission: identify which ship we are looking at.
96 Spills Reported 2,195 Gallons Discharged. ATB COMMITMENT Navy Base Bangor HELENA STAR.
Government-Initiated Unannounced Exercises (GIUE)
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
L 13 Fluids [2]: Statics  fluids at rest  More on fluids.  How can a steel boat float.  A ship can float in a cup of water!  Today’s weather Today’s.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Unit 9- Conducting Diving Activities Unit 9: Conducting Diving Activities Overseeing Dives Dive briefings and debriefings Overseeing Boat Dives Overseeing.
L 13 Fluids [2]: Statics  fluids at rest  More on fluids at rest  How is atmospheric pressure measured?  Today’s weather Today’s weather Today’s weather.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
1 Sector LA-LB State Region 9 RRT Meeting APR 2012 to JUN 2012.
Sector San Francisco USCG Sector San Francisco Regional Response Team 9 June 2012.
Dabney P. Hegg Senior Professional Staff U.S. Senate Committee on Commerce, Science and Transportation.
Sector San Francisco USCG Sector San Francisco State ACM – 18 January 2012.
Sector San Diego Area Committee and Incident Management Division Update RRT9 June 27, 2012.
PREFERRED UTILITIES MFG CORP South St. Danbury CT T: (203) F: (203) www. PREFERRED-MFG.com.
Presented by idoldear.com
Automotive Heating And Air Conditioning
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
What to Expect in the Maritime Policy in the 111th Congress
Ship to Turbine (STT) TM
SUSTAINABLE DRILLING OF OIL & GAS WELLS
MSU Morgan City Response IMD – Marine Environmental Response
NAVSEA SUPSALV Mission
Suryoday Technologies ISO 9001:2015 Co.
Firefighting equipment
Olusola Ayilara, P.E., P.G. PST-DCRP Section, Remediation Division
Presentation transcript:

Sabine Block 13: Oil Remediation

SS. W. BEAUMONT BACKGROUND – INTIAL INDICATION  OIL SHEEN OBSERVED BY HELICOPTER  PIPELINE WAS INITIAL PROBABLE CAUSE BUT WAS SOON DISCOVERED TO BE THE WRECK OF A SHIP  RESOLVE HIRED FOR AN INITIAL DIVE SURVEY

Assessment Phase Initial Dive Survey – September 3 rd 2009 Resolve crew conducted side scan sonar sweeps of where sheen was seen Dive support vessel followed sheen and entered water to do initial dive inspection Divers were able to determine that the vessel’s hull was only sticking out 4-6’ above the mud line and that the vessel was capsized approx 180 deg and heading SE to NW Divers also notes nickel size black bubbles floating up from the wreck but were unable to determine exactly where the source was due to a visibility of 3 inches near the bottom

LANA ROSE ASSESSMENT PHASE ALL PURPOSE SUPPORT VESSEL

Assessment Phase Back Deck of Support Vessel Lana Rose

Located Oil Oil was observed to be located in tanks; 1C, 4P, 5C, 5P, AND 5P deep tank

SS. W. BEAUMONT BACKGROUND - HISTORY  BUILT in 1944, WWII LIBERTY SHIP Under emergency ship building program  Program was established to keep up with the amount of vessels being sunk  Simple general cargo ships for carrying supplies and troops

TYPICAL LIBERTY SHIP Courtesy library of congress BACKGROUND

Specifics  LOA - 441’-6”, B – 56’-10.75”  SUNK IN TRANSIT TO PORT NED FOR SCRAPPING (EARLY 1970’S)  WATER DEPTH 40 FT  WATER TEMPERATURE 60-70° F

ASSESMENT PHASE 1 st Assessment – checked for the presence of oil 2 nd Assessment – quantify the oil present Divers used underwater magdrill w/ self tapping drill bit to drill into the hull. Sample holes were located using double bottom plans of a typical liberty ship.

DIVE SURVEY ASSESSEMENT PHASE DB PLAN / DIVER PREP. TO DIVE ON WRECK

TRAINING DIVERS ASSESSMENT PHASE MAGDRILL W/ SELF TAPPING DRILL BIT

Oil Recovery Phase Coast Guard Determined the need to extract the oil from the wreck Approx 16,000 gallons estimated on board Resolve Pioneer was immediately mobilized to act as dive/salvage platform throughout project Resolve Pioneer mobilized to act as dive/project management platform throughout project

RESOLVE PIONEER RECOVERY PHASE Transfer of dive gear from Lana to Pioneer Pioneer on site over wreck

SURVEY POSITIONING OIL RECOVERY PHASE

3D-IMAGE OVERLAY OF PIONEER OVER WRECK BACKGROUND

DECK OF PIONEER OIL RECOVERY PHASE Dive Shack FRAC tank Boiler

Dive Shack OIL RECOVERY PHASE

PROCESS OIL RECOVERY PHASE Installation of Flange Assemblies on Oil Tanks Circulation of oil from wreck through FRAC tank and back to the wreck. Due to the heavy viscosity of the cargo the oil must be heated in order to pump Heated oil skimmed from FRAC tank to oil stowage tank.

Closed Loop Circulation Cargo needed to be heated in order to pump Using closed loop heating system allowed cargo to be uniformly heated while keeping oil from entering the environment Better method than localized heating (such as using steam coils, steam injection, or water injection) as all of the oil is exposed to the heat. Easily allows cutting agents to be introduced while minimizing environmental risk Doesn’t allow any cargo to leak from vents

3D MODEL OF PUMPING OPS OIL RECOVERY PHASE

FLANGE ASSEMBLY OIL RECOVERY PHASE Flange Assembly Coupon Boring Bar

3” Desmi Pumps w/ Attached 3” Hose OIL RECOVERY PHASE

Hydraulic Power Pack OIL RECOVERY PHASE

Hose Installation OIL RECOVERY PHASE

Hose Installation OIL RECOVERY PHASE

OIL SKIMMING OIL REECOVERY PHASE

Product Tanks OIL RECOVERY PHASE FRAC Tank Receiving Mud Tank

Skimmers OIL RECOVERY PHASE

Results Of the estimated 16,000 gallons on board Resolve extracted 12,000 gallons of heavy oil Coast Guard & Resolve concluded there was no more pumpable product and the risk of leakage was mitigated enough to demobe equipment

Questions? Contact: Joseph Farrell III