PROGRESS IN THE PRIASOFT DATA ENTRY Master Data Entry at District Level 1. All Banks, Treasury and Postal a/c have been created. Vouchers Entry District Level 07 and 05 nos of Receipt and Payment vouchers respectively have been entered in Z.P Level. Block Level Eleven Blocks Master Data have already been entered and the following three blocks enter some vouchers. Sl NoName of the BlockPayment Voucher Received Voucher 01Gop31nil 02Satyabadi37nil 03Pipili0205
PROGRESS IN THE PRIASOFT DATA ENTRY Panchayat Level Entry Master data for 230 G.Ps has been completed and in 03 nos of G.P of different block 08 nos of Receipt and 12 nos payment vouchers have been entered. Problem faced in the PRIASOFT at the time of data entry and report generation. 1. Contra Voucher not saved. 2. Diversion of fund from one scheme to other scheme could not be entered. 3. Mixture of payment is not entered at a time as in PAMIS. 4. An Entry guide line (like PAMIS) with Head of Account and procedure of entry of different vouchers may kindly be prepared and send through mail for correct voucher entry at different level.
BLOCK AND GP STATUS OF PRIASOFT Block Panchayat Entered Masters Entered Opening Balance Entered VouchersTotal No of Village Panchayats Total No of Village Panchayat s with Master Entry Total No of Village Panchayat s with Opening Balance Entry Total No of Village Panchayats with Receipt/Payment Voucher Entry ASTARANGAyes (RV-0)/(PV-0) 14 30/(RV-0)/(PV-0) BRAHMAGIRIyes (RV-0)/(PV-0) 18 70/(RV-0)/(PV-0) DELANGAyes (RV-0)/(PV-0) 18 70/(RV-0)/(PV-0) GOPyes (RV-0)/(PV-31) 29 32/(RV-2)/(PV-6) KAKAT PURyes (RV-0)/(PV-0) 14 40/(RV-0)/(PV-0) KANASyes (RV-0)/(PV-0) 22 60/(RV-0)/(PV-0) KRUSHNAPRA SADyes (RV-0)/(PV-0) 20 60/(RV-0)/(PV-0) NIMAPADAyes (RV-0)/(PV-0) 28 30/(RV-0)/(PV-0) PIPILIyes (RV-5)/(PV-2) 19 31/(RV-6)/(PV-6) SADARyes (RV-0)/(PV-0) 26 20/(RV-0)/(PV-0) SATYABADIyes (RV-0)/(PV-37) 22 40/(RV-0)/(PV-0)
STATUS OF GP COMPUTERS SUPPLIED BY OCAC Status Report. Sl No Name of the Block Total No of G.P Nos of Computer Received for G.P Computer Transfer to G.P 1Astaranga14 2Bramhagiri18 3Delanga18 4Gop29 5Kanas22 6Krushna Prasad20 7Kakatapur14 8Nimapada Pipili19 10Sadar26 11Satyabadi22 Total230
20 SEATED LAN FACILITY CENTRE AT BLOCK Sl NoName of the BlockStatus of Lan Facility Centre Remark 01AstarangaSite not ready 02BramhagiriUnder Progress 03DelangaUnder Progress 04GopSite not ready 05KanasUnder Progress 06Krushna PrasadUnder Progress 07KakatpurUnder Progress 08NimapadaUnder Progress 09PipiliUnder Progress 10SadarUnder Progress 11SatyabadiUnder Progress
BLOCK WISE GP INFORMATION IN RURAL SOFT Sl. No. Block Name Total No. of GP No.of GP Info. Entered Total No.of Village No.of GP having Road Linkages to Block Head Quarter No.of GP having its own building No.of GP Building Electrified No.of GP having BSNL telephone facility No.of GP having Mobile Services No.of GP Provided With Drinking Water ASTARANGA BRAHMAGIRI DELANG GOP KAKATPUR KANAS KRUSHNAPRASAD NIMAPADA PIPILI PURI SADAR SATYABADI Grand Total
A S VPN IS VERY SLOW IT IS NOT POSSIBLE TO ENTRY IAY BENEFICIARY DETAILS IN RURAL. NIC. IN. IT IS REQUESTED TO REVIVE THE V - SAT INSTALLED IN BLOCK AND DRDA. Sl NoName of the Block Status of VPNRemark 01AstarangaWorkingVery Slow 02BramhagiriWorkingVery Slow 03DelangaNot WorkingExchange Problem 04GopWorkingVery Slow 05KanasWorkingVery Slow 06Krushna PrasadWorkingVery Slow 07KakatpurWorkingVery Slow 08NimapadaWorkingVery Slow 09PipiliWorkingVery Slow 10SadarWorkingVery Slow 11SatyabadiWorkingVery Slow 12DRDAWorkingVery Slow VPN STATUS OF BLOCK AND DRDA
PROBLEM FACED AT THE TIME OF UPDATING MGNREGS Material Vouchers could not update in all the PS Level projects. In this regard mails are given to MORD NIC team but the problem has not yet been sorted out.