Mirjam Kühne 1 RIPE 34, September 1999 Registration Services Report presented by Mirjam Kühne
RIPE 34 LIR-WGMirjam Kühne 2 1,5 New LIRs a Day
RIPE 34 LIR-WGMirjam Kühne 3 Requests per Category
RIPE 34 LIR-WGMirjam Kühne 4 Number of new requests in 1,452
RIPE 34 LIR-WGMirjam Kühne 5 Address Space Usage
RIPE 34 LIR-WGMirjam Kühne 6 Activity Plan 2000 Membership Services –RS –TTM
RIPE 34 LIR-WGMirjam Kühne 7 Staff & Workload New RS manager: Nurani Nimpuno Average response time 2-3 days Efficient procedures –no radical staff increase
RIPE 34 LIR-WGMirjam Kühne 8 IPv6 20 queries in total 10 address space requests 5 sub-TLAs allocated Smooth start Few open issues (IPv6-WG)
RIPE 34 LIR-WGMirjam Kühne 9 LIR Training Courses 13 courses delivered since last meeting 14 courses planned –Amsterdam (NL), Glasgow (UK), Moscow (RU), Bratislava (SK), Athens (GR), Strasbourg (FR), Munich (DE), Florence (IT), Ankara (TR), Stockholm (SE), Dublin (IE) New course material ready soon
RIPE 34 LIR-WGMirjam Kühne 10 Number of Audits LIRs Audited Large Medium Small Total
RIPE 34 LIR-WGMirjam Kühne 11 Type of Audits Total Large Medium Small new allocation extern. compl. 1 internal infrequ. contact random
RIPE 34 LIR-WGMirjam Kühne 12 Number of Days Total Large Medium Small new allocation infrequent cont random
RIPE 34 LIR-WGMirjam Kühne 13 Problem Areas Policies –no problems found: 224 –assignments over AW: 46 Procedures –DB object overlaps –DB inconcistencies missing status dangling reference
RIPE 34 LIR-WGMirjam Kühne 14 Policy Changes AW –temporarily lowered to /23 –no maximum size defined Allocation Size –no maximum size defined –based on individual needs admin-c in inetnum –on-site requirement dropped
RIPE 34 LIR-WGMirjam Kühne 15 Procedural Changes Proposal to accept requests for reverse delegation from members only –consistent with general procedures –improves relation between RIR and LIR –LIR contact needs to know address policies Proposal to change syntax of domain object –to allow registration of multiple zones
RIPE 34 LIR-WGMirjam Kühne 16 RIR coordination
Mirjam Kühne 17 RIPE 34, September 1999 Questions and Answers