Venice Beach Shuttle Business Plan Prepared by Bonnie Cheeseman, GRVNC Ad Hoc Parking Committee Chair

Slides:



Advertisements
Similar presentations
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Advertisements

[Company Name] Business Plan.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
How Costcos Mega Gas Station Will Create Traffic Congestion An Analysis: Text and Pictures.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
FUTURE OF PARKING IN VENICE BEACH Venice Neighborhood Council Meeting January 22, 2013.
December 3, 2014| Nadine Navarro Manager, Smart Commute, Metrolinx NEW DIRECTIONS FOR SMART COMMUTE, METROLINX.
Beautiful PB Workshop Summary 212 ideas + proposed design solutions summarized in four priority investment strategie s: Create a highly integrated network.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Honda Los Angeles Marathon XXV SRLA Info. News Flash SRLA will NOT have a booth at the Expo that will be held at Dodger Stadium, 1000 Elysian Park Ave,
PARKING COMMISSION. CITY PARKING SYSTEM SPACE COUNT BY FACILITY.
OSG Analysis on the Gloucester County Rail Line Study State Planning Commission December 3, 2008.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Parking and Transportation Services Presentation December 2, 2008.
Identifying Successful Transit Oriented Developments in Los Angeles By: Lupita Ibarra Introduction to GIS Midterm Project February 8, 2011.
Company Name Business Plan.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Thomas S. Cahir Administrator July 9, FEDERAL STATE CONTRACT ASSISTANCE LOCAL ASSESSMENTS FARE BOX REVENUE HUMAN SERVICE TRANSPORTATION GRANTS CCRTA.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
June 2011  Route  Operations & Riders  Benefits  Construction  Operations & Maintenance  Potential System Manager  Next Steps & Conclusion Overview.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Make the Right Decisions to Connect the Southern California Light Rail.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
GoBerkeley 1 goBerkeley: Integrating TDM and Parking Management into Downtown Berkeley Monday, October 28 th, 2013 Steer Davies Gleave 970 – 355 Burrard.
Transportation 101 June 12, Presenting Agencies  Southwestern PA Commission’s CommuteInfo program  GG & C Bus Company, Inc.  Mid Mon Valley Transit.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Fossil Fuel Savings Through Traffic Reductions for Laguna Beach Dennis Silverman Physics and Astronomy UC Irvine October 2007.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
TAG 2012 Survey Data. Survey sent to 16, responded.
Transportation 101 August 7, Presenting Agencies  Southwestern PA Commission’s CommuteInfo program  IndiGO: Indiana County Transit Authority 
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Morgan County Transit Discussion UTA Corporate Staff Presentation November 19, 2013.
Implementing Quality and Efficiency in Transit Planning Mike Summerlin Former Chairperson Raleigh Transit Authority.
DC Circulator Transit Development Plan TPB Access for All Advisory Committee October 28, 2010.
The Main Street Bike Lane Project LADOT Bike Program.
Rod Weis, Texas A&M University Lana Wolken, Texas A&M University Joe Richmond, University of North Texas Operating Your Own System Versus Contracting.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
San Diego Trolley. Current Current/future expansion Propose extension.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
(CITY OF LOS ANGELES) ITEM TH16A COASTAL COMMISSION SEPTEMBER 2014 HEARING.
Twin Peaks – Mt. SutroTwin Peaks – Mt. Sutro Connector Trail Community MeetingConnector Trail Community Meeting February 2, 2016February 2, 2016.
Urban Land Use Chapter Major Land Uses 1. Residential (40%) 2. Transportation (33%) 3. Commercial (5%) 4. Industrial (6%) 5. Institutional and Public.
1 Update on Transit in West Kelowna District of West Kelowna - November 12, 2013 Matthew Boyd – Senior Transit Planner Steve Harvard – Senior Regional.
Role in a Livable Community April 5,  Over it’s 40 year history, RVTD has seen service grow in the first 20 years and steady decreases over the.
Add Your Thoughts: love 1.What do you love about your neighborhood? most want to change 2.What would you most want to change about your neighborhood? big.
The CTA Gray Line A Benefit for Chicago. Overall Plan Create New CTA Gray Line –On in-city Metra Electric ROW Use Existing Infrastructure Purchase of.
Tonight’s Agenda  Project Overview  Existing Parking Summary  Post-It Note Exercise & Discussion  Parking Management Toolbox  Small Group Breakouts.
Lifeline Transportation Funding: Improving Health Care Access Karen Cohn, MS, CIH San Francisco Dept. of Public Health, Occupational & Environmental Health.
1 520 Tolling Implementation Committee Cascadia Center for Regional Development Beyond Oil Conference Thursday, September 4, 2008 Richard Ford, Commissioner.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Finance Committee & City Council October 10, 2016
Tour Buses, Public Safety, and the Quality of Life in Princeton
Center City Connector 101.
Transportation and Parking Services
Presentation transcript:

Venice Beach Shuttle Business Plan Prepared by Bonnie Cheeseman, GRVNC Ad Hoc Parking Committee Chair

Mission Statement  The Venice Beach Shuttle mission is to move tourists and residents through Venice Beach by reducing traffic congestion and therefore optimizing opportunities for commerce by access and convenience for all.

The Venice Beach Shuttle Team  The overseers of this service will be a cooperative team of key Los Angeles City Departments and Neighborhood Volunteers:  The Grass Roots Venice Neighborhood Council, Ad Hoc Parking Committee  The Los Angeles City Council District 11 Field Deputy and office.  The City of Los Angeles Department of Transportation (DOT) Regional Transit Division

VB Shuttle Business Plan Summary  Needs Assessment: Venice Beach Traffic Mobility: Past, Present, & Future: –The traffic congestion in Venice is due primarily to the lack of adequate public transportation, years of neglected traffic planning for Venice Beach as a high density residential community with an ever increasing popularity as an international tourist destination. –Venice Beach has become the Number 2 tourist destination in Southern California, only 2 nd in popularity to Disneyland. (Some surveys show Venice as Number 1.) –An average summer weekend yields approximately 350,000 visitors to Venice Beach. –Residents and Tourists currently compete for an extremely limited number of street parking spaces to avoid costly beach parking fees ranging from $6.50 during off peak hours to $20.00-$25.00 dollars during peak hours and holidays. –A Venice Beach Shuttle service will greatly reduce the traffic congestion in Venice, by moving tourists from outlying parking lots, particularly the Santa Monica State Beach Parking Lot that has approximately 3,700 parking spaces, is under utilized and is located at the north end of Ocean Front Walk.

Opportunities for Venice Beach: Shuttle Creates a Win-Win Situation for All  Creating Opportunities to Meet Transit Needs: - Benefits to Tourists: The Venice Beach Shuttle will be a cost effective way for tourists to move from one end of the beach to the other, over a 2 ½ mile spread between the north and south beach areas. - Commerce: Venice Beach Businesses benefit from the mobility of tourists throughout Venice, including the Abbot Kinney Blvd. Business District. - Residents: Locals benefit by being able to patronize local businesses and restaurants without getting into their cars. - Environment: Less traffic congestion means healthier air quality.

The Venice Beach Shuttle Service Concept  The key strategy for the Venice Beach Shuttle is to create a micro-managed transit service that makes sense for the community of which it serves.

Existing Transportation System in Venice  Currently, the MTA and Santa Monica Big Blue Bus run through Venice, but on routes that are indirect, infrequent, not running at weekend peak need hours, don’t connect to beach parking lots and are not user-friendly.  The current DASH Shuttle runs from a distant parking lot in Marina Del Rey off the 90 freeway to Windward Ave in Venice, but is disconnected to major parking lots and typical tourist routes and transit needs.  The proposed Venice Beach Shuttle will utilize a strategic route in Venice that will maximize tourist and resident mobility throughout the Venice community.

The Venice Beach Shuttle Goals & Objectives  The Shuttle Five-Year Goals: –The primary objective is to reduce traffic congestion by getting tourists to and from the Santa Monica State Beach lot, encouraging residents to stay out of their cars by using the shuttle for short-run transit, to increase commerce along the Abbot Kinney business corridor and along the entire Shuttle route. –The second objective is to have the Shuttle financially sustain itself by corporate sponsorship and advertising.

Proposed VB Shuttle Route  Shuttle Route, Thumbnail Mileage Count and Trip Time Estimate: Barnard Way: Santa Monica State Beach Parking Lot Adjacent to Navy St.; to Venice Beach Speedway or Pacific to Windward; to Speedway or Pacific to Washington; to Washington and Abbot Kinney Blvd; to Abbot Kinney Blvd. and Venice Blvd.; to Abbot Kinney Blvd. and Main St.; then return to Barnard Way or Navy St.  Approximately 4.3 Miles  Trip Time: 15 minutes off peak

VB Shuttle Resource Requirements  Operating Needs: - A Shuttle Bus that is user-friendly, much like the Trolley Car Buses used in downtown LA. - Bus Drivers provided by DOT - Signage in and near bus stops - On-going promotion  Financial Requirements –Funding from outside sources, commercial sponsors, advertisers and more.

Shuttle Financial Plan Cost Estimates:  Perfect-World-Scenario: Using one shuttle:  Fridays: 12n to 10pm, Saturdays: 12n to 10pm and Sundays:12n to 7pm.  Total: 27 hours at $55. per hour = $1485. per weekend per shuttle bus.  Beginning on Memorial Day Weekend running 14 consecutive weekends thru Labor Day in September = $20,790., summer,  Pilot Program, Cost Saving Scenario: Using one shuttle:  Saturdays: 12n to 8pm and Sundays: 12n to 7pm (accounting for longer day- light hours during the summer.)  Total: 15 hours at $55. per hour operating cost = $825. per weekend per shuttle bus.  Beginning on Memorial Day Weekend running 14 consecutive weekends thru Labor Day in September = $11,055., summer, 2004.

Funding Sources aka “YOUR NAME HERE!”  What Company Wouldn’t Want Their Name to Be Displayed All Over the Most Popular Tourist Destination in California?  Main Funding from Key Advertisers and Sponsorships  Abbot Kinney Businesses and Restaurants  Washington Blvd. Businesses and Restaurants  Ocean Front Walk (Boardwalk) Businesses and Restaurants  Corporate Sponsors such as Nike, Addidas, Gatorade, Coppertone, Hotels; Restaurants; Athletic Organizations, Gyms, Watersport Companies, Bathing Suit and Sports Clothes Manufacturers; Magazines; Movie and Event Companies.

Where Are We At Now? Key Issues:  Now –DOT will supply the bus and driver at the cost of $55. per hour –Increased Public Awareness –We Need Funding –We are currently soliciting funding sources  Long term –Ridership! –On-going Corporate Sponsorship. –Partnering Sponsorship with DOT.

Risks? Possibly. But, Oh, The Rewards Are Sweet!  Risks –Possible lack of ridership due to poorly outlined routes; inflexibility of program; infrequent schedule; poor signage; lack of publicity; lack of adequate funding  Addressing risks –Several programs need to be addressed simultaneously: Publicity and Promotion; Signage and Funding –Route success needs to be reviewed bi-weekly and by rider survey –Funding needs to be in place before the second season  Rewards –When the Shuttle is successful, it will be a win-win situation for all; decreased traffic congestion; increased tourist and resident mobility; increased benefit to commerce; less pollution; and parking mitigation to appease Coastal Commission requirements.