Global Design Effort - CFS 07-07-11 Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Damping Rings Discussion Session: Implications and Impact of the Central Injector Configuration and Other Layout Issues ILCDR07 Workshop.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
Yamamoto WG3: ML-SCRF Parallel Session,
ILC CFS AD&I Daresbury Lab Summary
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING GROUP CFS Damping Ring Mechanical and Electrical Tunnel Specifications V. Kuchler

Global Design Effort - CFS Damping Ring Baseline Technical Review 2 Preparation for the DR BTR Several Aspects of the Damping Ring Design Were DiscussedSeveral Aspects of the Damping Ring Design Were Discussed  Personnel will not Occupy the RF Cavern During Beam On Conditions  Final Configuration of the RF Cavities, Klystrons and Related Equipment  A Thermal/Radiation Barrier will be Required Between the RF Equipment Cavern and the Damping Ring Tunnel  Beamline Spacing was Established  Tunnel Temperature Requirements were Established Including the Need for Temperature Isolation of Wiggler Areas  Magnet Power Supply Spacing and Configuration  Requirements for Equipment Alcoves for Injection/Extraction Straight Section

Global Design Effort - CFS Damping Ring Baseline Technical Review 3

Global Design Effort - CFS Damping Ring Baseline Technical Review 4 Courtesy Benno List

Global Design Effort - CFS Damping Ring Baseline Technical Review 5

Global Design Effort - CFS Damping Ring Baseline Technical Review 6 Plan at Damping Ring RF Straight Section Wiggler Enclosures Thermal/Radiation Shielding Wall Continuous Aisle to Shaft

Global Design Effort - CFS Damping Ring Baseline Technical Review 7 Plan at Damping Ring Injection/Extraction Straight Section Power Supply Alcove Injection and ExtractionCaverns Floor Transition

Global Design Effort - CFS Damping Ring Baseline Technical Review 8 Infrequent Personnel Access and Passive Equipment Major Personnel Access And Egress and Equipment Transport Center of DR

Global Design Effort - CFS Damping Ring Baseline Technical Review 9 Main Linac Damping Ring ML RTML Ht is 2748 mm DR e- Ht is 2200 mm

Global Design Effort - CFS Damping Ring Baseline Technical Review 10

Global Design Effort - CFS Damping Ring Baseline Technical Review Summary Some Refinement of the Civil Drawings is Still Required to Support the New Cost EstimateSome Refinement of the Civil Drawings is Still Required to Support the New Cost Estimate Mechanical and Electrical Drawings are Being Produced by the Americas Region ConsultantMechanical and Electrical Drawings are Being Produced by the Americas Region Consultant Civil Cost Numbers Should be Available in 3-4 weeksCivil Cost Numbers Should be Available in 3-4 weeks Mechanical and Electrical Costs will not be Available Until SeptemberMechanical and Electrical Costs will not be Available Until September The CFS Damping Ring Criteria Format will Be Used for the Remaining Area SystemsThe CFS Damping Ring Criteria Format will Be Used for the Remaining Area Systems We Hope the Level of Detail Provided will Remain ConsistentWe Hope the Level of Detail Provided will Remain Consistent 11