Initial Seismic Study Albany USD Schools and Facilities March 20, 2012 R. P. Gallagher Associates, Inc. Structural Engineers, Oakland.

Slides:



Advertisements
Similar presentations
- 0 - Life Academy Seismic Evaluation and Relocation Timeline Analysis Division of Facilities Planning and Management.
Advertisements

The Field Act: Protecting California’s Schools from Seismic Hazards Timothy Dawson Engineering Geologist California Geological Survey, Menlo Park.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
West Contra Costa Unified School District Facilities Subcommittee Meeting March 11, 2014 State School Facility Program Seismic Funding Update.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
Environmental Assessment Survey of School Building.
Toronto District School Board Facilities Services Department North Toronto Collegiate Institute Status Quo.
ES MS HS Science Foundations Technology and Math Global Engineering Math Science Academies College Career Research Transitions STEM Fieldtrips Research.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Charleston County Schools District 10-West Ashley Mr. Earl Choice, Interim Associate Superintendent Dr. Maria Goodloe-Johnson Superintendent CCSD Mayor.
UTAH COUNTY ELEMENTARY SCHOOLS SEISMIC HAZARDS SURVEY AZIMUTH ENGINEERING AMY FREDRICKSON CODY HATCH ASHLEY BLOOD.
Louisiana Safe Routes to School Program Department of Transportation and Development Louisiana Safe Routes to School Program The Application.
Camp Pendleton Chamber of Commerce Day Kim Bourgeois June 2, 2011.
1 Implementation of an EHS Review/Approval Procedure for New Equipment and Processes David E. Downs, CIH, CSP President EHS Management Partners, Inc.
Program Needs North Thurston H.S. Nov. 3  Review Prior MeetingDick Withycombe5 min.  Middle School ReconfigurationTroy Oliver20 min.  Early Childhood.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
March 11, 2011 Nancy Ennis, Technology Resource Teacher OIT Elizabeth Htwar, Technology Teacher Waverly/Manor Woods.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Presentation to Oakland Unified School District Planning for the Future Architecture for Education Facilities Master Plan Long Range I.
Title IA Coordinator Tutorial Preschool Transition
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Specification & Quantities Estimating
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
West Contra Costa USD Facilities Sub Committee June 12, 2012 Peres Elementary School School Facility Program Funding Update.
FORT CALHOUN HIGH SCHOOL ADDITION/RENOVATION PROJECT PICTURES ALONG WITH DESCRIPTIONS.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Fremont Unified School District Board Report March 28, 2012 B&F 7 1.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*
PHS - MAINTENANCE BUILDING SEISMIC STRENGTHENING PROGRAM/ MEASURE E BOND PROGRAM INVESTIGATION, ANALYSIS, AND PRELIMINARY CONCEPT October 24, 2007 R. P.
ORANGE COUNTY/ ORLANDO MAGIC RECREATION CENTERS FUNDING, DESIGN AND DEVELOPMENT AGREEMENT November 27, 2007.
Design Web Update Learning Services. © 2001 Synopsys, Inc. (2) CONFIDENTIAL Action Items for client Engagement & Development to be removed/retained Top.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – March 2007 Construction Workshop 27 March 2007.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
S T A T E O F C A L I F O R N I A. Expediting the Application Review Process Building Schools — Putting Californians to Work.
RESEARCH PROGRAMS GETTING OFF ON THE RIGHT FOOT AND STAYING THERE Sue Sillick Montana Department of Transportation July 28, 2010 Methods to Ensure the.
Pre-State Allocation Board Meeting October 26, 2011 Presented By California Department of Education.
Item W12a – 12-AFC-03 – Energy Commission Review of Redondo Beach Energy Facility July 8, 2015 Energy & Ocean Resources Division.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
West Contra Costa Unified School District Long-Range Facilities Master Plan WCCUSD.net/FMP Facilities Subcommittee Option Recommendation April 19, 2016.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
South Greenville Recreation Center and Park Master Plan.
Atkinson, Andelson, Loya, Ruud & Romo A Professional Law Corporation CERRITOS ● FRESNO ● PLEASANTON ● RIVERSIDE ● SACRAMENTO ● SAN DIEGO Board Member Liability.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Division of Engineering Geotechnical & Engineering Services Branch Project Geology Section in West Sacramento Rob Barry Supervising Engineering Geologist.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
High School Presentation to LAUSD's Career Technology Education Advisory Council.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Data Center Stabilization
2015 School Bond Construction Program
Utah County Elementary Schools Seismic Hazards Survey Azimuth Engineering Ashley Blood, Cody Hatch, Amy Fredrickson Problem Statement: Many geologists.
Measure N Modernization
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Service reference ABU DHABI, United arab emirates IND 36 months
EVALUATION DISTRICT LEVEL STATE LEVEL NATIONAL LEVEL BEST TWO PROJECTS ARE RECOMMENDED FOR PARTICIPATION IN INDIAN SCIENCE CONGRESS.
Modeling Introduction to Engineering Design
Structural Drawing Chapter 19.
March 2018 Facility Planners Meeting
4th Annual Construction Law Summit
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Chino Valley Unified School District
Modeling Introduction to Engineering Design
Measure – V Facilities Update April 8th, 2019
Kamran Marashi, P.E., S.E. Jim Schettler, P.E., S.E.
Presentation transcript:

Initial Seismic Study Albany USD Schools and Facilities March 20, 2012 R. P. Gallagher Associates, Inc. Structural Engineers, Oakland

Schools and Facilities Reviewed (1)Ocean View ES (2)Marin ES (3)Cornell ES (4)Albany MS (5)Albany HS (6)Albany Children’s Center (7)MacGregor HS (8)District Office (9)Maintenance Facility

Scope of Study (1)Buildings (2) Site Hazards

AB 300 Survey Performed by DSA staff Buildings built Excluded wood frame structures, portables and modular buildings Review of drawings

AB 300 Categories Category 1 2 Description Expected to perform well Require further evaluation

Albany Category 2 Buildings All have Type RM1 construction Ocean View3 Marin7 10

Reinforced masonry

Wall-roof separation

Wall-roof connections

Albany Site Hazards Hazard_____ Finding_____ LiquefactionUnlikely Surface faultingNone Slope FailurePossible (?) at Children’s Center

Recommended Next Steps 1.Evaluate Category 2 buildings 2.Investigate slope at Children’s Center 3.Seek documentation for Little Theater and portables/modular buildings