Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005.

Slides:



Advertisements
Similar presentations
Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
Advertisements

I NDIANA S A GING AND P OTENTIALLY H AZARDOUS P IPELINE S AFETY I NFRASTRUCTURE M EDIA C ONFERENCE C ALL P RESENTED B Y : T HE H OOSIER E NVIRONMENTAL.
EVALUATING EXPLOSIVE AND FLAMMABLE HAZARDS OHIO COMMUNITY DEVELOPMENT CONFERENCE JENNIFER MILLERNOVEMBER 7, 2012.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
© 2008 ICF International. All rights reserved. NYSERDA No Indian Point Case Results June 26, 2009 Contacts: Kevin R. Petak ( ) Vice President,
By Yasra Adowar Petroleum industry Regulatory Team.
RMC Pacific Materials Purchased The Terminal From Ideal Cement
SEARUC 2003 Annual Meeting Pinehurst, North Carolina June 9, 2003 Pat Wood, III Federal Energy Regulatory Commission.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
Floridian Natural Gas Storage Company Martin County, Florida
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
1 Celtic-Plus Proposers Day 29 June 2015, Issy les Molineaux 7-minute Pitch of the Project Proposal.
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Federal Energy Regulatory Commission Item No. C- 7 Weaver’s Cove Energy & Mill River Pipeline June 15, 2005.
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Decision making tool Required by law  The Canadian Environmental Assessment Act, 2012  BC Environmental Assessment Act Aims to identify & evaluate the.
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
LNG Hazards.
LNG Liquefaction, Storage & Delivery Prefabricated & Manufactured M&R Facilities & Lateral Interconnects Complete Solutions for Natural Gas, LNG,Gas Storage,
© Copyright SafetyInstruction.com 2006 FIRE - SLIDE 1 OF 59 WELCOME OSHA 29 CFR INDUSTRIAL FIRE SAFETY CORPORATE SAFETY TRAINING.
Keeyask Generation Project Environmental Assessment Process Tracey Braun, M. Sc. Director, Environmental Approvals Branch Conservation and Water Stewardship.
Cooperative Regulation for Customers in the New Economy Pat Wood III, Chairman FEDERAL ENERGY REGULATORY COMMISSION NARUC Annual Meeting Nashville, Tennessee.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Lower Valley Energy Natural Gas Pipeline Update Hoback Canyon Pipeline Wyoming Oil and Gas Commission October 25, 2005.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Infrastructure Research Snapshot of the Nation, Focus on the West Presented by Norma McOmber October 24, 2001 Federal Energy Regulatory Commission.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Emissivity and other infrared-optical properties (WP6)
Module 3: Planning and Response. 2 Objective Upon the successful completion of this module, participants will be able to develop strategies for preplanning.
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California English Language Development Test Lily Roberts,
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption Jeff Bowman, TEEX.
Philadelphia’s LNG Controversy Samantha Linton ES 333 December 6, 2005.
Continuing Progress of LNG Terminals in the Gulf Coast Region
Raya for Information Technology. About US  Raya IT, established in 1998, operates in the field of systems integration and IT business solutions.  A.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Need Information or Assistance? Where to go, what’s available and what’s not.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Item W12a – 12-AFC-03 – Energy Commission Review of Redondo Beach Energy Facility July 8, 2015 Energy & Ocean Resources Division.
NASAA Fall Conference 2012 Joint Web CRD/IARD Forum Overview: Revisions to Form ADV Part 1B* *These slides provide an overview to some of the revisions.
© UH Institute for Energy, Law & Enterprise 1 Energy, Inc. Natural Gas/Electric Power Overview U.S./Canada Case.
© National Fire Protection Association. All rights reserved. NFPA Consensus Standards at Work What is NFPA 59A and how does it apply April 12, 2016 Guy.
Romanian Natural Gas Regulatory Authority (ANRGN) Dan Pantilie President ANRGN Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Refer to slide robustdetails robustdetails.
LNG Transportation and Storage
Regulatory Commission
Task Group API 19SS Sand Screens
BHP 2016 Formula Rate True-Up Meeting
VeteranWINS ℠ Grant Impact Report Guide
Presented to the Project Certification Committee on November 16, 2011.
BHP 2015 Formula Rate True-Up Meeting
BHP 2017 Formula Rate True-Up Meeting
Periodic Review Reports for 15A NCAC 02N, 02O, and 02P
Oil Field Contractor Fatality Case Study
Ontario’s New System to Price Industrial Pollution Emissions Performances Standards (EPS) March 15, 2019.
Working Party on General Safety Provisions (GRSG) General information
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop on Regulatory Enforcement and Inspection Vilnius, Lithuania 11 September.
Presentation transcript:

Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG & Algonquin Gas Transmission Pipeline June 30, 2005

Material on this page is consider Non-Internet Public (NIP) You would like a copy of this slide, please contact: Public Reference Room Telephone: Toll-free

Item No. C- 3 List of Public Meetings. June 3, 2004: Scoping Meeting (Providence) June 3, 2004: Scoping Meeting (Providence) June 4, 2004: Publically-attended Site Inspection (KeySpan Facility) June 4, 2004: Publically-attended Site Inspection (KeySpan Facility) July 7, 2004: Scoping Meeting (Providence; Fields Point Area) July 7, 2004: Scoping Meeting (Providence; Fields Point Area) July 8, 2004: Scoping Meeting (Middletown) July 8, 2004: Scoping Meeting (Middletown) January 11, 2005: DEIS Comment Meeting (Providence; Fields Point Area) January 11, 2005: DEIS Comment Meeting (Providence; Fields Point Area) January 12, 2005: DEIS Comment Meeting (Middletown) January 12, 2005: DEIS Comment Meeting (Middletown)

Federal Energy Regulatory Commission Item No. C- 3 KeySpan LNG, L.P. 50 LNG tankers per year 375,000 Mcf per day into Algonquin’s proposed facilities up to 150,000 Mcf per day of vaporized LNG to New England Gas 20,000 Mcf per day from its truck loading

Item No. C- 3 KeySpan LNG, L.P. Current Federal Safety Standards Not Met LNG storage tank impoundment designed to 100 percent of the tank contents rather than 110 percent; thermal radiation & flammable vapor exclusion zones extend offsite onto adjacent properties; evaluation by a seismic consultant required to determine existing tank compliance with the 2001 edition of the NFPA, which increased the stringency and complexity of the seismic requirements.