1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Module N° 7 – SSP training programme
A Joint Code of Practice Objectives and Summary Presentation
Operation & Maintenance Engineering Detailed activity description
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Risk Management Introduction Risk Management Fundamentals
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Mr. R. R. Diwanji Techniques for Safety Improvements.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Review of Introduction to Auditing
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
Operational Risk Management
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Risk-Based Inspection Program Best Practice – Executive Summary
DELIVERING SAFE & RELIABLE OPERATION
Protection Against Occupational Exposure
Codex Guidelines for the Application of HACCP
Presented to: [Date] By (Insert Name) Failure Mode and Effect Analysis (FMEA)
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
1 Valero Benicia’s Mechanical Integrity Program Karen Muehlbauer Mechanical Reliability Manager Thursday, March 27, 2014.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Health and Safety Dynamic Risk Assessment Aim To inform the students of the need for and the importance of a risk assessment.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
S7: Audit Planning. Session Objectives To explain the need for planning To explain the need for planning To outline the essential elements of planning.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Audit Planning. Session Objectives To explain the need for planning To outline the essential elements of planning process To finalise the audit approach.
Important informations
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
University of Sunderland CIFM02 Unit 5 COMM02 Project Hazard Management and Contingency Planning Unit 5.
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Information Security Governance and Risk Chapter 2 Part 2 Pages 69 to 100.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Failure Modes and Effects Analysis (FMEA)
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Failure Modes, Effects and Criticality Analysis
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Computer Security: Principles and Practice First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Chapter 17 – IT Security.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
People and Culture Office Safety, Health and Wellbeing
Ranjan kumar Assistant Manager CCL,Ranchi
FMEA.
Air Carrier Continuing Analysis and Surveillance System (CASS)
Quantitative Risk Assessment
The Hazard Analysis Critical Control Point
The Hazard Analysis Critical Control Point
People and Culture Office Safety, Health and Wellbeing
Failure Mode and Effect Analysis
Oldham Council Safety Inspections
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Donegani Anticorrosione S.r.l RBI Methodology Risk Based Inspection API 580 – 581 Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Introduction Although the term ‘RBI’ has been adopted relatively recently, the practice of planning plant inspection based on the risk of failure is not new. Most operators base the scope and depth of their inspection plans on the rate of in-service damage and the consequence of failure, within a traditional time-based inspection programme. (Same operators can rightly claim that their plant inspections have always been risk-based). The term ‘RBI’ refers to a structured, team-based assessment process with the aim of targeting inspection by considering the Risk of Failure (RoF), which is a combination of the Likelihood of Failure (LoF) and Consequence of Failure (CoF). Donegani Anticorrosione S.r.l

RBI – Risk Based Inspection Is based on the norms API 581 & RP 580 Developed by API (American Petroleum Institute) in collaboration with: - DOW - SHELL - FINA - TEXACO - EXXON - …………. Donegani Anticorrosione S.r.l

Objective of RBI Methodology Increase safety Increase the productivity of inspection Decrease the losses of production Reduce the direct costs of inspection Change the frequencies of inspections in base to the risk Prevent catastrophic damages Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l RISK Definition of the Risk: Risk (RoF) = Likelihood of Failure (LoF) x Consequence of Failure (CoF) Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Risk Based Inspection Consent of: Define the critical state for every single ITEM Create a priority for the Inspections basing on the critical state Focus the attention on the expected damages Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l RBI Methodology RBI Methodology developed by different companies, varied in the details, but it is founded however on fundamental step: Background to RBI Assessment Personnel Damage Mechanism Assessment Risk Assessment Inspection Planning and Risk Mitigation Updating RBI Assessment Donegani Anticorrosione S.r.l

RBI Methodology Donegani Anticorrosione S.r.l Step 1. Background to RBI Step 2. Assessment Personnel Step 3. Damage Mechanism Assessment Step 4.1. Likelihood of failure-LoF Step 4.2. Consequence of failure-CoF Step 5. Inspection Planning Step 6. Updating RBI Assessment Step 4.3 Risk Assessment Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Background to RBI RBI study is designed around the systematic, inductive assessment process of identifying historical, active or potential damage mechanism in each equipment. The process is a ‘bottom up’ procedure where one damage mechanism id considered at a time. Once the feasible damage mechanisms have been identified, their probabilities (likelihood) of leading to component failure are determined and their effects on the components are recorder and analysed to yield a calculated failure consequence. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Assessment Personnel All RBI systems have the following common elements: Assessment preparation Information Gathering Damage Mechanism Review Risk Assessment Inspection Plans Inspection Review. Donegani Anticorrosione S.r.l

Assessment preparation Since RBI is a team-based approach, the first step in the introduction of an RBI programme is to identify and assemble a competent Study Team. The RBI team should include staff with knowledge of plant operation, process hazards, risk assessment and inspection techniques. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Typical RBI team Inspection engineer(s); Material and corrosion engineer(s); Maintenance engineer(s); Process engineer(s); Operations engineer(s); Safety engineer(s); Team leader, typically a RBI specialist(s). Donegani Anticorrosione S.r.l

Information Gathering Are necessary the following information: Operational manual P&ID Sketches of project of the equipment Pipe class Property of the fluids Design and operating conditions Special instructions and History inspection …………… Donegani Anticorrosione S.r.l

Damage Mechanism Assessment The Study Team will need to review the historical and generic date relevant to each item of equipment. This will include consideration of previous inspection reports (if available) to determine the known or expected damage mechanisms. The review should consider damage mechanisms which may lead to failure, their expected rates of deterioration and the general location where damage may arise. Wherever quantitative rates of damage are not available, an element of expert judgement will need to be exercised by the Study Team. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Risk Assessment The failure likelihood and the failure consequence are calculated on the basis of quantitative Likelihood Factors (LF) and Consequence Factors (CF). Donegani Anticorrosione S.r.l

Likelihood of Failure (LoF) The answers to the LF questions are assigned a series of values and associated weighting and the combination of all these determines the Likelihood of Failure (LoF), derived for each equipment in turn. The LoF formula is specifically of the following form: LoF = LF2 Σ (LFi) LF2 = Failure likelihood (within a given period of time) LFi = represents several factors that are considered to contribute to the overall Likelihood of Failure. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l LFi Factors LF1: Current condition LF2: Failure likelihood LF3: Inspection Effectiveness LF4: Shutdown Frequency LF5: Operational Stability LF6: Operation in Relation to Design LF7: Recurring Repairs Donegani Anticorrosione S.r.l

Consequence of Failure (CoF) The answers to the Consequence Factors (CF) questions are assigned a series of values and associated weightings and the combination of these results is the Consequence of Failure (CoF), derived for each item in turn. The CoF formula is specifically of the following form: CoF = (FM x CF1 x CF2) + (CF3 x CF6) + CF4 + (CF5 x CF7) + CF8 + CF9 Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l FM Factor In addition to other consequence factors the consequence calculation also consider the failure mode of an assigned damage mechanism. Each damage mechanism knowledge base is assigned one of three failure modes, i.e. ‘Leakage’, ‘Leakage or Rupture’, ‘Rupture’. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l CFi Factors CF1: Product Loss CF2: Pressure Factor CF3: Explosion/Fire Damage Potential CF4: Toxicity CF5: Effect of Failure on Production CF6: Location of Component CF7: Time Taken to Rectify Failure CF8: Threat Personnel/Environment CF9: Engineered Safety Systems Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Weight of Factors Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Risk Matrix The resultant Likelihood of Failure (LoF) is plotted on the vertical axis, and the Consequence of Failure (CoF) is plotted on the horizontal axis, as an assessment point on a dimensionless five-by-five Risk Plot. The Lof axis is grouped into five relative Likelihood Categories, ranging from 1 to 5 (approximately 10-2/yr to 10-7/yr), and the CoF axis is grouped into five relative Consequence Categories, ranging from A to E. In this way, the Risk of Failure (RoF) is considered to increase with increasing LoF and CoF. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Risk Matrix 5 4 Risk Likelihood 3 2 1 A B C D E Consequence Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Inspection Planning After the risk assessment, the Study Team develops action plan based on all of expected damage mechanisms. The inspection plane consider the inspection interval and the scope of inspection. The proposed inspection plane are designed to provide an assurance that the ‘residual risk’ of the equipment is in accordance with the ‘ALARP’ principle, i.e. the aim of assessing and managing equipment is to reduce the RoF to As Low As is Reasonably Practicable (‘ALARP’). Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l Risk Mitigation The RBI methodology systematically leads the Study Team through the process of risk mitigation, by considering several mitigation action. The impact of each mitigation action can be evaluated, for subsequent collective appraisal of the benefits of the proposed action, using the ALARP principle. An appropriate strategy to manage the integrity of each equipment is therefore developed. Donegani Anticorrosione S.r.l

Updating RBI Assessment RBI Study can be used to justify extending the periods between inspections. The RBI process relies on a feedback loop to update the inspection plan, such that it is relevant to the actual condition of the plan. The feedback stage provides continuing confidence that damage dose not exceed expectations and ensures that plan inspections take account of operational experience. Once an inspection plan has been developed during a session, future inspection of the equipment should be carried out to confirm that damage rates are within expectations and to identify any unexpected damage. The inspection should be carried out by competent staff and the results recorded and re-evaluated. Donegani Anticorrosione S.r.l

Donegani Anticorrosione S.r.l FeedBack of the Study Plant Operation Plant Operation Shutdown/ Inspection Start RBI Inspection Plan Rev.0 Inspection Reporting Inspection Plan Rev.1 Maintenance Shutdown Base RBI Assessments Review RBI Assessments Maintenance Shutdown Donegani Anticorrosione S.r.l

Risk vs Time No Inspection Plan 180 months 120 months 60 months Donegani Anticorrosione S.r.l

Risk vs Time With Inspection Plan 180 months 120 months 60 months Donegani Anticorrosione S.r.l