ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
NPRR-574 Raiden Commodities LP Patrick de Man WMS 11/13/2013.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
CMWG Update to WMS Report of CMWG Meetings of &
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Multi-Interval Real-Time Market (MIRTM) Update to SAWG – WebEx ERCOT Staff Market Design & Analysis September 21, 2016.
Wind Management at MISO
RTDF Overview of Data Analysis & Status of “Consesus Items”
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Paul Wattles, Sai Moorty ERCOT Market Design & Development
2018 VELCO IRP Forecast Preliminary results
30 Minute Reserves EPFSTF January 4,
Rebalancing – What works in Volatile Markets
Presentation transcript:

ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson

2 Analysis Overview Objective is to look at potential impacts for ORDC Phase 2 using historic data Analysis was done to look at what additional capacity would be made available in Phase 2, or capacity that is upgraded from 30 minute payment to online payment and the effect it would have had on ORDC from June 1, 2014 –Combined Cycle configuration change –Combined Cycle head room containing Non- Frequency Responsive Capacity (NFRC) –Cold Start Time Peakers <30 min that are currently not available to SCED

3 Phase 2 ORDC Analysis CC Analysis Assumptions –Analysis looks at dates from 6/1/2014 to 12/31/2014 –Analysis looks at intervals when the Price Adder >= $1 –MW available for OFF10 or OFF30 would be on configuration change or on headroom not in HSL –Evaluated intervals where Resource was in an online, ON or ONREG, status and not in outage that restricts unit from max configuration Results Summary –< 1% of CC capacity are not in their respective max configuration Observation –CCs are in max configuration when not in an outage and the economics are favorable

4 Phase 2 ORDC Analysis Peaker Analysis Assumptions –Analysis looks at dates from 6/1/2014 to 12/31/2014 –Analysis looks at all intervals –MW available for OFF10 are qualified QSGRs and Resources with a start time <=10 minutes in the RARF –Evaluated intervals where Resources were in an offline status and not in outage Observation –Total capacity available In <= 10 minutes is about 2800 MW –NPRR 272 allows this capacity to submit offers to SCED 1050 already in SCED 1750 not currently in SCED –Phase 2 could potentially move approximately maximum of 1750 MWs of existing MWs from RTOFFCAP to RTOLCAP Average is ~ 1,000 MW

5 Phase 1 vs Phase 2 ORDC Current metrics on Phase 1 ORDC vs. Phase 2 Analysis (By SCED interval) Phase 2 Phase 1 Peaker Net Margin reduced by ~ 3.25%

6 Phase 2 ORDC Summary Overall Observations –Phase 2 ORDC CC capacity is already in the ORDC payment because it is online when ORDC curve is in the range for payment –Any MWs that can move from offline payments to online payments (i.e. QSGRs) already have an online mechanism through SCED –Estimated Project cost savings of 65k and annual O&M savings of 1.1 FTE