Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.

Slides:



Advertisements
Similar presentations
Constraint Management
Advertisements

Throughput Profit Multiplier Based on the books: Building Lean Supply Chains with the Theory of Constraints Managing Business Process Flow.
1Introduction to Linear ProgrammingLesson 2 Introduction to Linear Programming.
OPSM 301 Operations Management
© 2007 Pearson Education Constraint Management Chapter 7.
SENSITIVITY ANALYSIS.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
LP EXAMPLES.
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
Throughput World These sides and note were prepared using 1. The book Streamlined: 14 Principles for Building and Managing the Lean Supply Chain
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Integer Programming.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Practice; Follow the 5 Steps Process Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.
1 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per unit RM3 $25 per unit $90 / unit 110.
Linear-Programming Applications
THEORY OF CONSTRAINTS ACCT 7320 October 8, 2014.
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Network Flows Based on the book: Introduction to Management Science. Hillier & Hillier. McGraw-Hill.
Introduction to Mathematical Programming OR/MA 504 Chapter 5 Integer Linear Programming.
Introduction to Theory of Constraints Competitive Manufacturing Management.
Operations and Production Management
Introduction to Theory of Constraints
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Linear Programming Topics General optimization model LP model and assumptions Manufacturing example Characteristics of solutions Sensitivity analysis Excel.
Why Models? State of world: Data (not information!) overload Reliance on computers Allocation of responsibility (must justify decisions) Decisions and.
Spreadsheet Modeling & Decision Analysis:
Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning. 6-1 Integer Linear Programming Chapter 6.
L EAN F LIGHT I NITIATIVE C ONFERENCE ©2012 M. Srinivasan 1 Focusing on Throughput Systems Thinking and the Theory of Constraints Mandyam (“Srini”) Srinivasan.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.
Lean Accounting & Theory of Constraints Two related concepts ACCT7320, 2/3/09 1.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
LINEAR PROGRAMMING APPLICATIONS IN MARKETING, FINANCE, AND OPERATIONS MANAGEMENT (2/3) Chapter 4 MANGT 521 (B): Quantitative Management.
1 The Dual in Linear Programming In LP the solution for the profit- maximizing combination of outputs automatically determines the input amounts that must.
Vilnius College of Design Student Group Grant Agreement Reference Number: LLP-ERA-IP-2011-LT-0580.
The Theory of Constraints
20-1 Inventory Management: Economic Order Quantity, JIT, and the Theory of Constraints 20.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
Theory of Constraints Part I: Introduction. Theory of Constraints (or TOC) Relatively recent development Looks at the practical aspect of making organizational.
LINEAR PROGRAMMING.
DP Johnson, 2005 Dealing with Production Bottlenecks Mini-case Be Sure To Review Notes Area And Related Word Document Forward to Instructors.
OPSM 301 Operations Management Class 11: Linear Programming using Excel Koç University Zeynep Aksin
Lu Shan Hu Jian Shang Chen
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Linear Programming Topics General optimization model
Synchronous Manufacturing and Theory of Constraints
Introduction to Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
The Theory of Constraints
Cost Concepts for Decision Making
Synchronous Manufacturing
Constraint Management
Linear Programming Topics General optimization model
Linear Programming Topics General optimization model
The Goal.
SE503 Advanced Project Management
Goldratt's Theory of Constraints (TOC)
Linear Programming.
Theory of Constraints An Introduction
Theory of Constraints An Introduction
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius -- and a lot of courage -- to move in the opposite direction. Albert Einstein These sides and note were prepared using 1. The book Streamlined: 14 Principles for Building and Managing the Lean Supply Chain Srinivasan. TOMPSON ISBN: The slides originally prepared by Professor M. M. Srinivasan.

2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Practice; Follow the 5 Steps Process Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per unit RM3 $20 per unit $90 / unit 120 units / week $135 / unit 50 units / week P: Q: D 20 min. D 5 min. C 10 min. C 5 min. B 20 min. A 15 min. B 10 min. A

3 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics What Product to Produce? Sales View: Suppose you are the sales manager and you will be paid a 10% commission on the sales Price. What product do you recommend to produce? P: Sales Price = $90  commission /unit = $9 Q: Sales Price = $100  commission /unit = $10 Finance View: Suppose you are the financial manager and are in favor of the product with more profit per unit. P: Profit Margin = $  Profit Margin= $45 Q: Profit Margin = $  Profit Margin= $60 Production View: Profit per minute of production time P P P

4 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics What Product to Produce? Sales View: Suppose you are the sales manager and you will be paid a 10% commission on the sales Price. What product do you recommend to produce? P: Sales Price = $90  commission /unit = $9 Q: Sales Price = $100  commission /unit = $10 Finance View: Suppose you are the financial manager and are in favor of the product with more profit per unit. P: Profit Margin = $  Profit Margin= $45 Q: Profit Margin = $  Profit Margin= $60 Production View: Profit per minute of production time P P P

5 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Cost World Solution For 50 units of Q, need 50 ( ) = min. on B, leaving min. on B, for product P. Each unit of P requires minutes on B. So, we can produce units of P. If we sell units of Q and units of P, we get 50($60) +60($45) = per week. After factoring in operating expense ($6,000), we /15 = $5700 LOSE $300! 50 Go and Exploit the Constraint– Find the best way to use the constraint

6 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics  Think Globally not Locally. Link Performance of each subsystem (Marketing, Finance, Operations, etc) to the performance of the total system (the Business Enterprise)  The Goal of a Business Enterprise is to make more money, … in the present and in the future  Max NPV.  There is one or at most few constraint(s) determine its output.  Just like the links of a chain, the processes within the enterprise work together to generate profit for the stakeholders. The chain is only as strong as its weakest link.  Time lost at a bottleneck resource results in a loss of throughput for the whole enterprise. Time saved a non- bottleneck resources is a mirage.  Human Resources and Capital Resources are not variable cost. Theory of Constraints (TOC)

7 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics 1. Identify The Constraint(s. Can We Meet the Demand of 100 Ps and 50Qs? Can we satisfy the demand? Resource requirements for 100 P’s and 50 Q’s:  Resource A: 100 × + 50 × = minutes  Resource B: 100 × + 50 × = minutes  Resource C: 100 × + 50 × = minutes  Resource D: 100 × + 50 × = minutes

8 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Resource B is Constraint - Bottleneck Product P Q Profit $ Resource B needed (Min) Profit per min of Bottleneck 45/15 =3 60/30 =2 Per unit of bottleneck Product P creates more profit than Product Q Produce as much as P, then Q 2. Exploit the Constraint : Find the Throughput World Best Solution

9 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics For 100 units of P, need 100 ( ) = min. on B, leaving min. on B, for product Q. Each unit of Q requires minutes on B. So, we can produce units of Q. If we sell units of P and units of Q, we get 100( ) +30( ) = per week. After factoring in operating expense ($6,000), /30 = $60 $6300 Profit $300! 100 $45 2. Exploit the Constraint : Find the Throughput World Best Solution

10 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics  How much additional profit can we make if market for P increases from 100 to 102; by 2 units.  We need 2(15) = 30 more minutes of resource B.  Therefore we need to reduce 30 minutes of the time allocated to Q and allocate it to P.  For each unit of Q we need 30 minutes of resource B.  Therefore we produce one unit less Q  For each additional P we make $45, but $60 is lost for each unit less of Q. Therefore if market for P is 102 our profit will increase by 45(2)-60 = Exploit the Constraint : Find the Throughput World Best Solution

11 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics 2. Exploit the Constraint : LP Formulation Decision Variables x 1 : Volume of Product P x 2 : Volume of Product Q Resource A 15 x x 2  2400 Resource B 15 x x 2  2400 Resource C 15 x x 2  2400 Resource D 15 x x 2  2400 Market for P x 1  100 Market for Q x 2  50 Objective Function Maximize Z = 45 x x Nonnegativity x 1  0, x 2  0

12 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics 2. Exploit the Constraint : LP Formulation and Solution

13 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics  Keep Resource B running at all times.  Resource B can first work on RM2 for products P and Q, during which Resource A would be processing RM3 to feed Resource B to process RM3 for Q. Step 3: Subordinate Everything Else to This Decision  Never allow starvation of B by purchasing RM2 or by output of Process A. Never allow blockage of B by Process D- Assembly.  Minimize the number of switches (Setups) of Process B from RM2 to RM3-Through-A and vice versa.  Minimize variability at Process A.  Minimize variability in arrival of RM2  Do not miss even a single order of Product P

14 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics A Practice on Sensitivity Analysis What is the value of the objective function? Z= 45(100) + 60(?)-6000! Shadow prices? 2400(Shadow Price A)+ 2400(Shadow Price C)+2400(Shadow Price C) (Shadow Price D)+100(Shadow Price P) + 50(Shadow Price Q). 2400(0)+ 2400(2)+2400(0) +2400(0)+100(15)+ 50(0) = 6300 Is the objective function Z = 6300? = 300

15 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics A Practice on Sensitivity Analysis How many units of product Q? What is the value of the objective function? Z= 45(100) + 60(?)-6000 = X2-6000=300 60X2 = 1800 X2 = 30

16 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Step 4 : Elevate the Constraint(s)  The bottleneck has now been exploited  Besides Resource B, we have found a market bottleneck. Generate more demand for Product P Buy another Resource B  The Marketing Director: A Great Market in Japan ! Have to discount prices by 20%.

17 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Step 4 : Elevate the Constraint(s). Do We Try To Sell In Japan? $/Constraint Minute

18 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics  Right now, we can get at least $ per constraint minute in the domestic market.  So, should we go to Japan at all?  Okay, suppose we do not go to Japan. Is there something else we can do?  Let’s buy another machine! Which one?  Cost of the machine = $100,000.  Cost of operator: $400 per week.  What is weekly operating expense now?  How soon do we recover investment? Perhaps not. 2 B $6,400 Step 4 : Elevate the Constraint(s). Do We Try To Sell In Japan?

19 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Step 5: If a Constraint Was Broken in previous Steps, Go to Step 1

20 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Step 5:If a Constraint Was Broken in previous Steps, Go to Step 1 80P, 50Q,0PJ, 70QJ Total Profit = 3000 What is the payback period? /3000 = weeks What is the payback period? /( ) = weeks The domestic P had the max profit per minute on B. Why we have not satisfied all the domestic demand.

21 Ardavan Asef-Vaziri Nov-2010Theory of Constraints 1- Basics Purchased Part $5 / unit RM1 $20 per unit RM2 $20 per unit RM3 $25 per unit $90 / unit 110 units / week $100 / unit 60 units / week P: Q: D 10 min. D 5 min. C 10 min. C 5 min. B 25 min. A 15 min. B 10 min. A Practice: A Production System Manufacturing Two Products, P and Q Time available at each work center: 2,400 minutes per week. Operating expenses per week: $6,000. All the resources cost the same.