Government of the Republic of Serbia

Slides:



Advertisements
Similar presentations
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Advertisements

Planning and Timely Implementation of Structural Funds Interventions Katarína Mathernová Director, DG Regional Policy European Commission 24 November 2005.
The Cohesion Fund: Programming and link to the Structural Funds Annual Meeting of ISPA Partners 2003: From ISPA to Cohesion Fund and Structural Funds Angela.
Implementation of waste management plans in Serbia 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
Project funded by The European Union Government of the Republic of Serbia European Integration Office WRAP UP SESSION Have we learned something?
Project funded by The European Union Government of the Republic of Serbia European Integration Office INDUCTION TRAINING SEIO GENERAL FRAMEWORK CREATED.
The Stabilisation and Association Agreement between Montenegro and the EU signed in October 2007, entered into force in May Montenegro has been.
Progress on developing, preparing and financing environmental investment projects REPUBLIC OF MACEDONIA.
Progress in PRS Implementation: The Republic of Serbia Presented by Ivana Aleksić, Team Manager Poverty Reduction Strategy Implementation Focal Point Deputy.
National Disaster Risk Management Program NDRMP Belgrade, March
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
Financing Urban Public Infrastructure
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
EU cooperation with the Eastern Neighbourhood Anita Ryczan
Tisa Catchment Area Development TICAD KEY ROLE OF SPATIAL PLANNING IN THE DECISION MAKING PROCESSES - REGIONAL SPATIAL PLAN OF AP OF VOJVODINA - Msc Arch.
Ministarstvo finansija Vlada Republike Srbije Instrument za pretpristupnu pomoć Instrument for Pre-Accession Assistance – IPA
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
PUBLIC PRIVATE PARTNERSHIP – CROATIAN EXPERIENCE Kamilo Vrana, B.Sc.E.E. Managing Director Beograd, November 18, 2010.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
EU perspectives and current standing of the countries in the region in the Stabilization and Association Process - THE CASE OF REPUBLIC OF SERBIA - REPUBLIC.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Infrastructure Projects Facility Regional meeting for Senior Officials from SEE and Donor’s Community Brussels 28 November 2008 Rachele Gianfranchi.
Belgrade, Donor Coordination Meeting Belgrade, 30 th of November 2011.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
MOBILISATION OF RESOURCES TO IMPLEMENT THE DANUBE STRATEGY Ruse/Giurgiu, May 2010 T. Sobieski European Commission-Head of Unit C2, DG ELARG.
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
1 ECS – European Commission support for the Energy CommunityIstanbul, March 2011 EUROPEAN COMMISSION SUPPORT FOR THE ENERGY COMMUNITY Simon Uzunov.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Priority Environmental Investment Programme (PEIP) – CARDS Regional Regional Meeting for Senior Officials from SEE and Donors’ Community 19-20th June Budva,
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
SEA in the Czech Republic Prague, 24 September 2008.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
National Information Communication Technologies Strategy Vasif Khalafov “National strategy” working group - Web -
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR MOLDOVA Main achievement – signing and ratification of the EU-Moldova Association agreement Development.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
BOSNIA AND HERZEGOVINA MINISTRY OF FINANCE AND TREASURY Aid Coordination and Effectiveness activities in DCF Meeting Sarajevo, 24 February 2009.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
ENPI – The example of Ukraine DG RELEX UNIT E-2 Ukraine, Moldova and Belarus.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
“RIA in EU Harmonization” 4 June 2009 EuropeAid/125317/D/SER/TR Session 4 RIA in accession negotiatons.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 5 – Public Procurement Bilateral screening:
Govrnment of Serbia Ministry of International Economic Relations Development and Aid Coordination Unit - DACU Planning and Programming CARDS Fund - Lessons.
BUDAPEST DANUBE CONTACT POINT: an innovative tool to support the implementation of the Danube Strategy David Pelech Budapest Danube Contact Point 6 th.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy Bilateral screening: Chapter.
PRESENTATION OF MONTENEGRO
SEETO Investment Report 2016
Framework for accession countries to comply with EU climate agenda
PRESENTATION OF MONTENEGRO
Presentation by: Marios Miltiadou Greek Ministry of Transport
The role of the Passport Indicators in Monitoring PFM Strategy
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Supporting Cities and Regions through Projects and Programmes
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
CAP decision making process
Instrument za pretpristupnu pomoć
Ex ante conditionalities in cohesion policy:
Brief overview of the environment sector in Serbia
Presentation transcript:

Government of the Republic of Serbia Ministry of Construction, Transport and Infrastructure Single project pipeline - tool for concentrated economic development - Pristina 25/03/2015

Why Single Project Pipeline To avoid ad hoc approach to planning preparation and implementation of infrastructure projects To meet the necessity for strong project prioritization (developed set of criteria reflecting EU and national strategy and policy goals focusing on economic development) To enable systematic and timely planning of resources To provide reliable basis for defining proper sequencing of the actions To help linking investments planning and program budgeting

Methodology for selection and prioritisation of infrastructure projects Adopted by the Government (as an annex to the document National Priorities for international assistance to the Republic of Serbia for the period 2014 to 2017 with the projections up to 2020) Basis for the Single Project Pipeline. Covers energy, transport, environment and business related infrastructure. Based on two basic pillars: Strategic relevance of the project Project readiness/maturity for implementation

Methodology development process Comprehensive consultative process involving all relevant stakeholders (line ministries, public utility companies and public and civil society organizations etc.) Supportive approach by and active participation of the Delegation of the European union in Serbia and the European Commission (DG NEAR) Consultations with the International Financial Institutions and bilateral donors Sector Working Groups (SWGs) coordinated by Serbian European Integration Office (SEIO) as a main mechanism for consultations

Methodology flow chart 1. Collect existing infrastructure project ideas/proposals Project identification form (PIF) 2. Identify broad list of projects by completion of Project Identification Forms Strategic Relevance Assessment criteria (based on PIF) 3. Strategic Relevance Assessment (filtering step) 4. Short list of strategically relevant projects Gap Assessment Questionnaire /Gap Assessment Report 5. Gap Assessment Analysis of strategically relevant projects 6. Final list of prioritized projects (to be included in ISDACON)

Scoring of transport sector projects Two phases: Scoring (which is not final) based on Strategic relevance criteria: Consistency with EU, national, transport policies/strategies Demand/supply and origin/destination factors Relation with other transport corridor/routes Traffic safety and security of transport Economy systems and sectors affected by the project

Scoring of transport sector projects Final scoring based on GAP report; projects divided into 4 groups according to their degree of maturity: Group 1 – Ready for tendering and investment realization: Group 1a – projects with technical documentation prepared, ready for tender preparation or tendering Group 1b – projects with preparation of technical documentation ongoing, and ready for tendering when it is finished Group 2 - Ready for preparation of technical documentation: Group 2a – projects with spatial planning documentation completed with preconditions for land acquisition in place Group 2b – projects with gaps in spatial planning documentation with preconditions for land acquisition still pending

Single Project Pipelines of sectors Transport Sector Projects (26 projects) € 5,512.50m Waste Water Subsector Projects (17 projects) € 438.45m Energy Sector Projects ( 39 projects) € 4,487.70m Solid Waste Projects (15 projects) € 399.90m Business related infrastructure projects (12 projects) € 57.95m TOTAL € 10,896.50m

Project Passport Project Passports are prepared for all the projects from the single project pipelines on the basis of the inputs from the Gap Assessment Reports. Project Passport is an overview of all the steps which should be done in the course of project preparation and implementation, projects’ tentative costs and the responsible institution. Project passport ensures that all the steps are considered in a realistic time perspective.

Project Passport example Highway Belgrade – South Adriatic (E-763) Beograd-Boljare-Podgorica-Bar Comments Institution responsible Year 1 Year 2 Year 3 Year 4 Year 5 Indicative cost estimation (EUR) Indicative source of financing Q1 Q2 Q3 Q4 Beograd - Obrenovac Length of the route 17.6 km. Under negotiation with concessionaire Ministry of Transport, Roads of Serbia   170.000.000 Concession Obrenovac - Preljina Length of the route 103.07 km. Under construction Koridori of Serbia 700.000.000 Republic of Serbia, Republic of China, Republic of Azerbaijan Preljina - Pozega Length of the route 30.96 km 286.000.000 Pozega - Boljare Length of the route 107 km 1.830.857.578 Preparation of Spatial Planning documentation Infrastructure Corridor Special-Purpose Spatial Plan Infrastructure Corridor Special-Purpose Spatial Plan Pozega-Boljare. Decision for provision approved (Official Gazette of RS, No. 3/11). Under preparation Government of Serbia 9.150.000 Municipal spatial plan As the Infrastructure Corridor Special-Purpose Spatial Plan will be used for issuance of Location requirements it is not conditional to update Municipal Spatial Plans, General Urban Plans and General Regulation Plans for implementation of this project, although these plans has to be justified with higher level spatial plans. General urban plan General regulation plan B Not necessary Urban design Not required Elaborate on Expropriation for locations needed Elaborate should be prepeared PE Roads of Serbia Decision on Public Interest Request for Public interest declaration to be submitted Land acquisition Not started TOTAL Preparation of technical documentation Preparation of pre-feasibility study Pre-feasibility Study for highway E-763 Belgrade-South Adriatic Area, Section III Pozega-Montenegrin border General design General Design for highway E-763 Belgrade-South Adriatic Area, Section III Pozega-Montenegrin border Review of the General Design & Prefeasibility study State Revision Committee Site investigation Feasibility study (with CBA according to the EU requirements) 10.000.000 IPA Preliminary design 45.000.000 Review of the preliminary Design & Feasibility study Desin for Construction permit and technical control Technical control has to be independent 30.000.000 Environmental and Social Impact Assessment study Full EIA is compulsory per EIA legislation Scope and content application to be sent to the Ministry Ministry for Energy, development and environemntal protection Preparation 5.000.000 Approval approval issued by the Ministry Ministry for Energy, development and environmental protection Permits Location requirements Ministry of Construction, Transport and Infrastructure Construction permit Preparation of tender documentation and tendering procedure This is the case if the contract is "design and build" 200.000 90.200.000 Institutional Establishment of PIU MoT, PE Roads of Serbia TOTAL PROJECT PREPARATION TOTAL INVESTMENT REALISATION* SUPERVISION Supervision will lastduring project implementation/construction 82.300.000 O & M COSTS/year This is estimated cost per year 2.142.000 Boljare - Podgorica - Bar Length of the route 183 / 167 km. Republic of Montenegro Government of Montenegro 1.950.000.000 Podgorica - Granica sa Albanijom Length of the route 000 km.

National Investment Committee Provides political support to operationalisation of the single project pipeline Its recommendations and actions are based on the Single Project Pipeline. Represents key platform for the discussion on critical issues and steps related to the specific projects from the single project pipeline. Enables synergy between various sources of financing (budget, loans, and grant funds) with the aim to achieve substantial leverage effect.

National Investment Committee (NIC) Minister of Finance and NIPAC Ministry of Construction, Transport and Infrastructure Ministry of Economy Ministry of Public Administration and Local Self Government Ministry of Agriculture and Environment Ministry of Mining and Energy EC , IFIs, bilateral partners SEIO is a technical secretariat of NIC Sector Working Groups

Key considerations ahead: Single project pipelines are updated annually Joint Assistance to Member States and Candidate countries provided by European Commission/EIB/EBRD (JASPERS) and Project preparation facility (PPF) assistance is essential for quality project preparation and mirroring/practicing EU-ESI funds principles Synergy between EU funds (IPA national, IPA regional-Western Balkans Investment Framework), International Financial Institutions and budget resources coordinated by NIPAC Promotion of PPP as a modality of financing of infrastructure projects Proper reflection of the Single project pipeline methodology in the Budget System Law

Thank you!