Mahmut Erkut Cebeci 27.03.2012, Amman Integrating Intermittent Renewable Energy Resources.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

Wind Turbine Session 4.
Edge Debate, April 2005 Joe Short
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Experience you can trust. 1 Solutions for large-scale wind power integration in the European system EWEC2009 Energy and power management Frits VerheijMarch.
System Strength Discussion
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Cihangir Gençoğlu , Joint Transmission System Operator – Utility Regulator Renewable Energy Workshop, Istanbul Integrating Intermittent Renewable.
Dr. Yüksel MALKOÇ TWEA Vice President. Turkey’s current financial outlook, Demand growth and supply development, Wind potential and capacity development,
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Analysis of wind energy with pumped storage systems in autonomous islands George Caralis Mechanical Engineer NTUA National Technical University of Athens.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Engineering Technology Division
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
21 st May 2015 SMARTGREENS 2015 Lisbon, Portugal Lane Department of Computer Science and Electrical Engineering West Virginia University Analyzing Multi-Microgrid.
Energy and Low Carbon Society Policy in Taiwan Chen Li-chun Faculty of Economics Yamaguchi University Tel/Fax:
Demand Response – A New Option for Wind Integration ?
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Dr. Osman Bülent TÖR Power System Planning and Analyse Group Jordan, 2012 Responses of IPPs against Incentive Mechanisms for Renewable Generation in Turkey.
Turkish Power System Overview March 2012
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
1 The Tres Amigas SuperStation VLPGO November 2011.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Prospects of Wind and Pumped Storage systems’ integration in Greek islands George Caralis Mechanical Engineer NTUA Wind Energy Laboratory.
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Voltage grid support of DFIG wind turbines during grid faults
Sanjay Garg General Manager PGCIL/ Ministry of Power
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation UN Climate Change Conference June 2011 Bonn, Germany, 7.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Renewables and System Services Ann Scully.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
Agenda TSOG 8th November
Power Electronics and Control in Wind Energy Conversion Systems
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
IG BASED WINDFARMS USING STATCOM
Sustainable Energy Planning for Autonomous Power System of Crete
Economic Operation of Power Systems
STATE ENERGY AND WATER REGULATORY COMMISSION
Overview on Renewable energy in Bulgaria
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
EU-IPA12/CS02 Development of the Renewable Energy Sector
NS4960 Spring Term, 2018 China: Expanded Renewables
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
RE Grid Integration Study with India
Ilkka Jokinen Taavi Heikkinen
July update JANUARY 2019.
Presentation transcript:

Mahmut Erkut Cebeci , Amman Integrating Intermittent Renewable Energy Resources

Outline Part 1 – Quality Introduction : Background Effects of Wind Turbines on Power Quality International Standards and Local Directives in Turkey Technical Details Parameters Effecting Wind Power and State of the Art Wind Power Technology Parameters Characterising the Power Quality of Wind Turbines Case Study Part 2 – Integration and Operational Challanges ENTSO-E CESA interconnection studies ENTSO-E CESA trial parallel operation and frequency control performance indices The possible effects of rapid growing intermittent generation on Turkish Electricity Transmission System a) The current situation b) Geographical distribution of renewable generation c) The expected challenges Conclusions Part 3 – Grid Code Improvements 2

Outline Continued Part 3 – Grid Code Improvements 3

Part 1 Power Quality Concerns 4

Part 1 Section – 1 BackGround

Some Facts about Turkish Grid >52 GW installed capacity More than 36 GW of peak demand (occured in summer, last year’s peak demand was >32 GW in summer) Annual increase in demand and consumption is 7–8 % Hydro, coal and combined cycle power plants Increasing interest in renewables Deregulated generation sector Privatized(ing) distribution sector TEIAS is natural monopoly in transmission business (regulated by EMRA) Interconnected operation with ENTSO-E CESA system 6

Background  A wind turbine is a prime mover that converts the kinetic energy of wind to electrical energy via a generator.  Not an energy capacity but an energy source. Output power is very dependent on enviromental conditions.  Exponential growth in interest in wind power brings exponential penetration level to grid.

Not considered in traditional power system approach. A wind turbine may operate synchronised to the grid or independently. (Island Mode) May have adverse effects on the grid. Background

Wind Power Interest in Turkey Before November the 1st, TEİAŞ has stated 4916MW of available wind penetration, 3274MW of which is licenced. After November the 1st, TEİAŞ has stated 7453MW of extra available wind penetration to EPDK. Total available capacity is increased to 12369MW. Close to 13000MW licence applications to EPDK upon this event. TEİAŞ has prepared a competition directive.

Turkish Wind Speed Map (REPA-50m)

Turkish Wind Power Intensity Map

Effects of Increasing Wind Power Penetration Level to Power Quality  Problems: - Voltage Sags - Flicker Emission - Harmonics Injection  Solutions - Developing Wind Power Technology and Power Electronics Technology - Enhanced Grid Codes

International Standards and Local Directives IEC IEEE 1547 (Draft) Turkish Grid Code – Appendix 18

Part 1 Section – 2 TECHNICAL DETAILS

Parameters Effecting Wind Power

Constant Speed vs. Variable Speed

Power Control Concepts Stall Control: The design of rotor aerodynamics causes the rotor to stall (lose power) when the wind speed exceeds a certain level Pitch Control: the blades can be turned out or into the wind as the power output becomes too high or too low Active Stall Control: At low wind speeds the blades are pitched similar to a pitch-controlled wind turbine, in order to achieve maximum efficiency. At high wind speeds the blades go into stall by being pitched slightly into the direction opposite to that of a pitch-controlled turbine

State of The Art Technology

State of the Art Technology

Terminology

Power Quality Characteristics of Wind Turbines IEC is the de-facto standard for wind power technology IEC is about the power quality characteristics of wind turbines

Power Quality Parameters Rated Data (Pn, Qn, Sn, Un, In) Max Permitted Power (10 Min Avg.) Max Measured Power (60 sec & 0.2 sec Avg.) Q as a function of P (As 10 min Avg. Values) Flicker Coefficient c(Network Impedance Phase Angle, Annual Average Wind Speed) Max # of specified switching operations of the wind turbine for 10 minutes and 120 minutes Flicker Step Factor k f (Network Impedance Phase Angle) Voltage Change Factor k u (Network Impedance Phase Angle) Max harmonic currents I h, during continuous operation as 10 minute period averages up to 50th

Case Study

Case Study Procedure Slow Voltage Variations – Load Flow Study for minimum and maximum loading conditions of both the wind turbines and the grid to check whether the voltages remain within the limits and no overloading in any of the instruments. Flicker Calculations for Long Term and Short Term (Rapid Changes)

Case Study Procedure Switching Operations (Flicker Emission due to Switching) Continuous Operation (Flicker Emission due to Continuous Operation)

Case Study Procedure Voltage Dips Harmonic Currents The results obtained with respect to mentioned detailed procedure should be investigated with respect to the grid codes and other related regulations of the specific country or site.

Case Study Conclusion The simplified rules (such as 5% rule in Turkey) would conclude that the grid had to be reinforced or the wind farm had to be limited with a less capacity. According to the results obtained with respect to the previous procedure, it is concluded that the wind farm can be connected to the existing grid without any reinforcements to the grid (except for the MV transformers and related cabling etc. to connect the wind farm to the grid)

Part 2 Security Concerns 29

Outline Part 1 – Quality Introduction: Background Effects of Wind Turbines on Power Quality International Standards and Local Directives in Turkey Technical Details Parameters Effecting Wind Power and State of the Art Wind Power Technology Parameters Characterising the Power Quality of Wind Turbines Case Study Part 2 – Integration and Operational Challanges ENTSO-E CESA interconnection studies ENTSO-E CESA trial parallel operation and frequency control performance indices The possible effects of rapid growing intermittent generation on Turkish Electricity Transmission System a) The current situation b) Geographical distribution of renewable generation c) The expected challenges Conclusions 30

Part 2 Section - 1 ENTSO-E CESA Interconnection Studies 31

Organization Chart of the Project Rehabilitation of the Frequency Control Performance of TPS for Synchronous Operation with UCTE Survey of Power Plants Site Tests & Studies Design of Governor Control and Parameter Optimization Secondary Control Design and Optimization of AVR/PSS Special Protection Scheme Restoration Plan Training 32

Preliminary Studies Site Survey –Power Plant Dynamical Data Generator Parameters AVR, PSS, Speed Governor Models and Parameters Reliability of the data is very important!!! Identification of the Problems –Very Low Frequency Periodical Frequency Oscillations (b/w sec, depending on the state of the system) Governor Rehabilitation and Retuning Studies (mostly concentrated on HPPs) –Poor Quality of Frequency Control Coordination with PPs, Balancing & Settlement Market –Expected Low Frequency Inter Area Oscillations (caused by static excitation systems and longitidunal structure of the system) PSS Rehabilitation and Retuning Studies Innovative Measures 33

Periodical Frequency Oscillations Major HPPs in service, before synchronization After synchronization 34

Basic Problem (Challenging !!!) Periodical frequency oscillations have been resolved by rehabilitation & governor retuning of Ataturk & Karakaya HPPs. According to the simulation studies, the expected inter area mode after interconnection of Turkey is ~0.15Hz. ~0.15Hz oscillations are inside the control bandwidth of: –PSSs –Governors Conclusion: The speed governing structures of power plants (Governors and Turbines) should not contribute to inter area power swings of ~0.15Hz. 35

Part 2 Section - 2 ENTSO-E CESA Trial Parallel Operation and Frequency Control Performance Indices 36

ENTSO-E CESA Interconnection Trial parallel operation started Non-commercial energy exchanges Commercial energy exchanges ( Expected date of the end of trial parallel operation

Inter Area Oscillations – After Interconnection Mode shape after the interconnection of Turkish Power System to ENTSO-E CESA system. 38

Simulation Studies - Time Domain Analysis 39

Steady State Stability of the Interconnected System Low frequency modes (~0.15 Hz) are present in the system!!! 40

Steady State Stability - Solution Methodology Road map for enhancing the steady state stability of the interconnected system 41

Interconnected System Frequency δf ~ 25 mHz f average ~ Hz Total 30 sec reserve (i.e., primary reserve) of the CESA system including Turkey is ~3000 MW Turkey as a control area provides ~300 MW of this reserve 42

Performance Indices 1)The hourly integral of ACE should not exceed ±60 MWhrs (the target value is ±20 MWhrs) –To limit unintended energy exchanges 2)Number of cases with ACE > ±175 MW (measured per 2 seconds, evaluated per 4 seconds) over an hour should not exceed 10% of the cases in normal operation –To prevent overloads in the electricity transmission systems of the neighboring Balkan countries 3)The amount of sum of tie line flows due to inter area oscillations should not exceed 30 MWs in normal operation –To prevent overloads due to inter area power oscillations in the CESA countries 43

Frequency Control Problems The basic challenge is related to the quality of secondary frequency control, due to the transition between secondary reserve/tertiary reserve, as a result of: –Intermittent loads (arc furnaces, etc.) –Hourly load variations up to 2500 MW/hr (annual average peak demand is ~30000 MW) –Balancing and settlement market problems (mostly related to market conditions) –IT infrastructure of TEIAS –Intermitttent and/or uncontrolled generation  Mostly due to small (<50 MW) renewable power plants, a potentially serious problem) –Day ahead balancing – Day ahead market transition –Physical unavailability of qualified secondary reserve  Large hydros are the main providers of secondary reserve – Peakers, availability of water, etc.!!  Efficiency constraints of NGCCPPs  Slow nature of TPPs (boiler dynamics) 44

Frequency Control Problems - Consequences High standard deviation of ACE (causing overload in the weak Balkan electricity transmission systems) due to: –Intermittent loads & uncontrolled generation –Hourly load variations up to 2500 MW/hr (annual peak load is ~32000 MW) –Balancing and settlement market problems (mostly related to market conditions) –IT infrastructure of TEIAS Solution –Effective management of tertiary reserve (long term, not possible with the current market regulations) –Increased amount of secondary reserve under the influence of the AGC system (short term) for certain periods of the day. 45

46 Small Signal Stability - Consequences Highest East-West mode observed on 23rd April 2011 (Minimum load conditions due to Easter and Turkish National Holiday) The system is unstable in the steady state (i.e., the equilibrium point) By operation of the innovative measures (FACTS devices), the repeating undamped oscillations are damped after a threshold

Present State Frequency Stability (1&2) Rotor Angle Stability (3) Operational Issues –On progress 47

Part 2 Section - 3 The Possible Effects of Rapid Growing Intermittent Generation on Turkish Electricity Transmission System 48

Current Situation in Turkey Percentage of renewables in total installed power is almost 10%. 49

Current Situation in Turkey As of March 2011, according to TEIAS statistics: Small Hydro ~3400 MW in operation >4500 MW is licenced and/or under construction Some projects are uncertain Renewable Power Plants (except small hydro) ~1700 MW in operation >770 MW is licenced and/or in construction Dominated by wind projects, increasing interest to solar projects Renewables are not only used for electricity generation!!! 50

Current Situation in Turkey Incentive mechanism for renewable generation TechnologyFirst 10 years of operation($cent/kWh) Hydro 7.3 Wind 7.3 Geothermal 10.5 Solar 13.3 Biomass (incl. LFG) 13.3 –90 % discount in system usage tariff & 99% discount in license fees –Extra incentives in the case of usage of domestic equipment –Technical previleges (ancillary services & market regulations) –Priority in system interconnection –Land usage incentives –For further details see Turkish Law #

Geographical Distribution of Renewable Generation Geographical distribution of wind potential 52

Geographical Distribution of Renewable Generation Geographical distribution of solar potential 53

The Expected Challenges – Short Term Increased standard deviation of ACE due to –Intermittent generation in short term (turbulent peaks/dips) –Balancing and settlement market problems due to bad prediction of renewable generation capacity for the next day IT infrastructure of TEIAS –Special monitoring/prediction/control system requirement especially for renewables –Expansion of the existing system 54

The Recent Developments RITM Project ( -EIE, TUBITAK UZAY, DMI -Wind Electricity Generation Forecast -Currently applied to 480 MW of 1500 MW installed capacity 55

The Expected Challenges – Long Term Ancillary Services Provision Demand Coverage Generation – Demand balance in off-peak hours, downward reserve management is an issue Wind generation curtailment seems to be the only solution in some cases Market conditions (purchase guarantee, etc.) Solution –Effective management of tertiary reserve (current market conditions do not encourage generation curtailment) –Optimal amount of secondary reserve under the influence of the AGC system (both upward and downward directions) for the entire day. –Capacity reserve agreements!!! 56

The Expected Challenges – Very Long Term Two scenarios are possible: 1)Intermediate term pain for long term gain (long term electricity price stability) Balanced distribution of electrical energy generation sources 2)Unexpectedly low energy prices may end up with generation investment unstability (boom boost, long term electricity price unstability) causing either Surplus of generation Lack of generation (an example of such phenomenon was experienced in 2011 spring) Not technical but economical issues 57

Conclusions The frequency stability of TETS has been drastically enhanced with the ENTSO-E CESA Interconnection Intermittent generation characteristics due to the stochastic nature of renewable resources in short term, together with balancing and settlement market conditions will definitely have adverse effects on this issue. Possible solution: –Effective management of tertiary reserve (current market conditions do not encourage generation curtailment) –Optimal amount of secondary reserve under the influence of the AGC system (short term) for the entire day. –Monitoring and control infrastructure investments (both hardware and software) 58

Part 3 Section - 1 Grid Code Improvements 59

60 Voltage Ride-Through Capability

61 Voltage Ride-Through Capability

62 Active Power Control

63 Reactive Power Support

64 Reactive Power Support

65 Reactive Power Control