SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Capital developments at SFX
Presentation Hampton Wick Infants School Parent & Community Evening Chris Saville, John Chapple & Pete Russell Tuesday 5 th February 2013.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Education Campus What a Difference a Year Makes! Takoma.
2 The Framework Constructor Partners Supply Chain Opportunities Barry O’Hagan.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Building Drawings and Symbols
Civil Engineering & Architecture 2.3 Residential Design.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 26th May 2011 Tonbridge Station Julie Houghton.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
J C Charyk Hanna School: Modernization. Timelines To Project Completion The timelines shared are proposed to date and may change slightly as the project.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
News Campus Wick Community Campus Newsletter Issue 4March/ April 2015 Meet the Team Alan Shearer: Gateman. Alan joined Morrison construction in March,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
TECHNOLGICAL DESIGN Architectura l Design Process.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Building Plans.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Richard Cairns, Executive Director of Infrastructure and Regeneration Community Alliance 5 August 2015.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Orthographic Drawings
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Pecha Kucha Group 1. Design Concept Features? Features?External Cycle store to the right of the face of the buildings. Encased in timber cladding as will.
White Pigeon Community Schools
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Upon completion of this module, you will be able to:
1, sq m (20,067 sq ft) Property Highlights
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Construction Documents
RIBA Plan of Work 2013.
Multistory Office Building
21st Century School Buildings Plan
Council Rock High School South
Competency: Draw exterior elevations
Minuteman Vocational Technical Regional High School Progress
20 Chestnut Drive, Mansfield
Progress Report 11/10/11.
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
KOMPLEX Investors Report – Q
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Eaton MEDC, Sutton-In-Ashfield
P4 North Ring Business Park,
RIBA Plan of Work 2013.
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER

ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING SECTION 1 2.0Project Overview & Images 3.0BLL Project Team & Logistics 4.0Current Progress & Phase 2 / 3 Transition 5.0Q & A Close 1.0Introduction and Agenda 2

ST KENNETHS PRIMARY SCHOOL SECTION 2 2.0The Project 2.1Project Overview 2.2Images 3

ST KENNETHS PRIMARY SCHOOL 2.1 Project Overview Building:GIFA ST KENNETHS PRIMARY SCHOOL 3569 m² The project: This project is our fourth new-build primary school building to be constructed within Phase 2 Tranche 1 of the South Lanarkshire Primary Schools Modernisation Programme. The Client: South Lanarkshire Council The Contract: PPC 2000 (Partnering framework contract agreement) Overview: The project comprises the tandem build construction of a new two-storey 16 classroom primary school. In addition to the classrooms, the building comprises private and main stream nurseries, a double gym hall, general purpose room, library and IT Suite. The new building is located within the existing school campus, formerly the location of the existing sport pitch and car park. The works are being carried out in two phases to allow the existing school to operate whilst the new building is under construction. On completion of the new school building the users will decant from existing to new allowing progression into phase 2 where the scope is to remove asbestos from the existing school, demolish the building, complete the sports pitch and finish the hard and soft landscaping. Construction: The construction of the primary school is a steel frame structure with holorib decking topped with a concrete floor slab on pads/strip foundations. The building will have predominantly a facing brick outer leaf with areas of metal cladding and curtain walling on the elevations. The roof will be an aluminium standing seam roof throughout. Internally, underfloor heating has been incorporated throughout the building with fit out specification aligning with other projects in the programme. Externally, the scheme includes external hard and soft landscaping and lighting design scheme complete with a standard 60 x 40 metre sports pitch, car parking / pupil drop off with playground & soft play areas around the school/nursery. 4

ST KENNETHS PRIMARY SCHOOL 2.2 Images 5

ST KENNETHS PRIMARY SCHOOL 3.0 PROJECT TEAM / SITE LOGISTICS SECTION 3 3.0Project Team & Site Logistics 3.1BLL Design Team 3.2BLL Construction Team 3.3Site Logistics 6

ST KENNETHS PRIMARY SCHOOL 3.1 BLL Design Team Structural Engineer Cost Consultant Services Engineer Architect This is the design team engaged upon the St Kenneth’s Primary School Project 7

ST KENNETHS PRIMARY SCHOOL 3.2 BLL Construction Team TRACEY-LEIGH FINDLAY Framework Commercial Manager ANDY STRONACH Framework Manager TOM CAIRNEY Framework Safety Manager BARRY O’HAGAN Framework Delivery Manager OMAR AHMED WAZIR Planning Manager Alisdair Elliot Construction Site Manager CORE TEAM DELIVERY TEAM GORDON ANDERSON Regional Director DESIGN TEAM ED PARRY Commercial Director EMMA ROBB Commercial Manager Michael McMullan Construction Manager (Part) TBC Finishes Construction Manager (Part) 8

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Overall Phasing Diagram 9

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 1 Logistics 10

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 2 Logistics 11

ST KENNETHS PRIMARY SCHOOL 3.3 Site Logistics – Phase 3 Logistics 12

ST KENNETHS PRIMARY SCHOOL 3.0 PROJECT TEAM / SITE LOGISTICS SECTION 4 4.0Programme 4.1Current Progress 4.2Phase 2 / 3 Transition 13

ST KENNETHS PRIMARY SCHOOL 4.1 Current Progress Works on site at present comprise the following: External Works External Brickwork Curtain Walling Windows and Doors External Cladding 14 PROGRESS Bovis Lend Lease are currently reporting works on programme with all works due for completion 23/07/10

ST KENNETHS PRIMARY SCHOOL 4.1 Current Progress Internal Works Interior Fit Out (Joinerwork, floor finishes, suspended ceilings) Mechanical & Electrical Installation Architectural Metalwork Decoration Gym Fit Out 15

ST KENNETHS PRIMARY SCHOOL 4.2 Phase 2 / 3 Transition Demolition of the existing school is scheduled to be completed during November Following which BLL will install synthetic sports pitch and carry out further hard and soft landscaping works BLL are scheduled to complete all Phase 3 works during January 2011 BLL are intending to use the existing delivery entrance of East Mains Road to service the Phase 3 works 16 Bovis Lend Lease are scheduled to take possession of the Phase 3 site on the 30 July 2010 and commence preparation works for demolition of the existing school.

ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING SECTION 5 5.0Q & A Close 17