MB-IOT test bench at CERN

Slides:



Advertisements
Similar presentations
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Advertisements

09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
THALES ELECTRON DEVICES
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
B. Todd et al. 25 th August 2009 Observations Since v1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
I. Syratchev, April 2015, EuCARD2, Barcelona. Review of Efficient RF Sources I. Syratchev, CERN.
Almost 40 years of operation with tetrodes in the CERN-SPS CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of RF-SPS team CWRF workshop,
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
Fermi Science Support Center September 26, 2008 FUG Face-to-Face Meeting Fermi GI Program Update David Band, FSSC CRESST/GSFC/UMBC.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
LIU-SPS RF Power upgrade | 09 December 2015.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
CONS and HL-LHC day Analysis of needs from TE-EPC
High Energy Proton Synchrotrons
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Construction and Commissioning of Electronic Test Benches
Second SPL Collaboration Meeting, Vancouver May 2009
SPL Collaboration Meeting PAC2009
WP4 RF equipment volume needs
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Saclay Test Facilities
ESS Bilbao RF Systems Overview Pedro J. González
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
IOT operation in the SPS Long term experience TWC 800 MHz
Panel Discussion: Future of Vacuum Tubes
Presentation transcript:

MB-IOT test bench at CERN 13.01.15 Eric Montesinos

K1577/AB Addendum 19 CERN & ESS will jointly study and agree a test programme CERN will source, prepare and make available test stands and equipment to enable test of relevant parameters and requirements The IOT will be tested for ESS and CERN SPL operational parameters CERN will allocate test time, resources and utilities for an extended test of the IOT > months ESS and CERN shall jointly prepare a report no later than October 2016 provided that IOT are delivered on time to permit the testing programme to be started no later than 01 October 2015 The test stand shall remain property of CERN The IOT shall remain property of ESS

First draft test stand proposal Drivers IOT HVPS Capacitor bank Crowbar RF load LVPS Already available at CERN To be bought by CERN

First draft test stand proposal SPS 800 MHz spare TX (to be validated at 704 MHz) David did a more detailed study: LHC2 is almost the only acceptable place SR2 ? Drivers IOT HVPS Capacitor bank Crowbar RF load Two SPS 800 MHz spare loads (to be validated at 704 MHz, simulations ok) + Splitter to be designed and to be built LVPS Olivier agreed to lend one ‘LHC spare’

Second draft test stand proposal Drivers IOT HVPS Capacitor bank Crowbar RF load LVPS Thales/CPI requested 10 individual units Cost not included in the initial estimates Thales will provide it and it will remain CERN property Thales will make FAT at CERN’s test stand

Second draft test stand proposal Drivers IOT HVPS Capacitor bank Crowbar RF load LVPS David is taking care of it LEP HVPS converted from CW to pulsed operation Olivier proposed help of Gianfranco as well, I will use it for sure

K1577/AB Addendum 19 With Morten we now have regular follow-up meetings jointly study and prepare an agreement of a test programme Prepare agreement on equipment to enable test of relevant parameters and requirements I insist to keep ESS and CERN SPL operational parameters Just started, as right now IOT contract was confidential

Already available at CERN Two IOT Main goal: Double the tests capability & to have the same test facility for both tubes, in order to better compare results Drivers LVPS IOT HVPS Capacitor bank Crowbar RF load Capacitor bank IOT RF load To be bought by CERN Already available at CERN Drivers LVPS

Two IOT Drivers LVPS Schedule Cost IOT HVPS Capacitor bank Crowbar RF load Capacitor bank IOT RF load More or less the same difficulty as the first one Higher safety issues ? Drivers LVPS

Two IOT Drivers LVPS Schedule Cost IOT HVPS Capacitor bank Crowbar RF load Capacitor bank IOT RF load Our TX is probably capable to drive two IOT Still to be defined Two circulators to insulate IOT inputs ? Splitter with L3 configuration ? SSPA ? Drivers LVPS

Two IOT Drivers LVPS Schedule Cost IOT HVPS Capacitor bank Crowbar RF load Capacitor bank IOT RF load L3 does not want Thales/CPI to know about it (even NOT cern !) Thales already gave me a detailed sketch Drivers LVPS

Two IOT Drivers LVPS Schedule Cost IOT HVPS Capacitor bank Crowbar RF load Capacitor bank IOT RF load Second splitter should be ok Second set of loads has to be designed, tested and built (old supplier does not exist anymore), or to be bought Drivers LVPS

Summary 1 IOT 2 IOT HVPS Schedule Cost Schedule Cost Capacitor Crowbar Schedule Cost Schedule Cost Drivers Schedule Cost Schedule Cost LVPS Schedule Cost Schedule Cost Load Schedule Cost Schedule Cost Test area Schedule Cost Schedule Cost Schedule Cost Schedule Cost Need a bit more time to tell you how many delay and how much money