802.20 EC Closing Slides and Motions November 2009 Atlanta, GA.

Slides:



Advertisements
Similar presentations
IEEE f Active RFID System Sponsor Ballot Ballot Resolution Committee Teleconference Meeting Minutes October 25, 2011 Mike McInnis Chair IEEE f.
Advertisements

P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE Submission March 2015 Motions and Supporting Material for EC Meeting Agenda Items Friday, March 13, 2015 Estrel.
Submission doc.: IEEE IEEE q - Conditional Approval to Start Sponsor Ballot Slide 1Bob Heile, Wi-SUN Alliance June 2015.
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
Doc.: IEEE Submission November 2004 Robert F. HeileSlide 1 Forward P REVa-D6 to RevCom Robert F. Heile Chair
PROGRESS REPORT ON Arnie Greenspan Chair Member Standards Board Piscataway, NJ September 27, 2007.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, San Francisco Closing Plenary Date Submitted: July, 2007 Presented.
Doc.: IEEE Submission m to RevCom-conditional p to RevCom-conditional 1 st Ext: SG on Spectrum Resource Utilization.
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Title: LE TG Closing Report for Session #64 Document Number: h-09/0029 Date Submitted: Nov. 19, 2009 Source: Chair of LE TG: Mariana GoldhamerVoice:+972.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
Relevant Rules on Recirculation
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
IEEE P Working Group for Wireless Personal Area Networks
IEEE Working Group for Wireless Personal Area Networks™
802.11e Portland Report July 16, 2004 July 16, 2004
P b Status Sponsor balloting completed:
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
Motion IEEE Standards withdrawals to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
Working Group March Plenary EC Closing Motions Package
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f RevCom request support package.
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
Task Group G Report March 10, 2003
IEEE Motions at the November Plenary EC Meeting
Motion IEEE Standards withdrawals to RevCom
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
IEEE Motions in July Plenary DCN:
November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Motions at Mid-Week Plenary] Date.
November 2010 doc.: IEEE /0872r4 November 2010
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
Motion – P Rev/D3 to RevCom
Motion – P Rev/D2 to Sponsor Ballot
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
Month Year IEEE Motions in July Plenary DCN:
Closing IEEE 802 EC Friday 15th March 2019
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
802.11e Vancouver Report January 16,2004 January 15, 2004
March Plenary Closing Report
Motion #1: TGaq EC Report
Motion – ae UnConditional Approval to RevCom
Motion – P Rev/D3 to RevCom
Motion – P Rev/D2 to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
Task Group G Report January 17, 2003
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
Agenda Items EC Closing Meeting, Nov 15, 2013
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11j Sponsor Ballot Procedure 10
September 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4j Nov 2012 Motions Date Submitted: November.
IEEE P SC-Maintenance Closing Report
Motion IEEE Standards withdrawals to RevCom
Presentation transcript:

EC Closing Slides and Motions November 2009 Atlanta, GA

Motion to Forward a to Sponsor Ballot

802.20a Letter Ballot Results l Initial Ballot l Return rate, based on 12 voters, was 91.7% l YES – 10 (100%) [Y/(Y+N)] l NO – 0 (0%) l Abstain -1 l One ballot returned by a Non-Voter with 4 Comments l Recirculation Ballot to accommodate Non-Voter Comments l No negative votes received – approval rate stays at 100% l Commenting non-voter attended comment resolution meeting in September and indicated that his comments were resolved.

Move to Forward a to Sponsor Ballot l Motion: The 802 EC approves moving Draft 2.0 of P802.20a to Sponsor Ballot. l Mover: Shellhammer l Second: Lynch l Motion in WG Passed 3/0/0 (Chair did not vote) has 12 eligible voters.

Conditional Approval to Forward to RevCom

Sponsor Ballot History l Sponsor Ballot Results Sponsor Ballot closed Sept. 21, 2009 l 86 Total voters in ballot pool. l 63 Affirmative votes with 13 comments l 0 Negative votes with comments l 1 Negative vote without comments l 5 abstention votes l 100% Approval Rate l Sponsor Ballot Recirculation #1 Sponsor Ballot closes Nov. 26, 2009 l The recirculation draft includes changes made to improve draft in response to comments received with approve ballots. No vote changes are expected l Comment resolution scheduled for January Interim

Motion in Working Group l Request the 802 EC grant conditional approval for forwarding Draft 2.2 to RevCom. l Motion Passed 4/0/0 (Chair did not vote) has 12 eligible voters.

Conditional Approval to forward to RevCom l Move that conditional approval be granted to forward Draft 2.2 of P to RevCom. l Mover: Shellhammer l Second: Lynch

Conditional Approval to Forward to RevCom

Sponsor Ballot History l Sponsor Ballot Results Sponsor Ballot closed Sept. 21, 2009 l 79 total voters in ballot pool. l 58 Affirmative votes l 2 Negative votes with 9 comments l 1 negative vote without comments l 4 abstention votes l 96% Approval Rate l Sponsor Ballot Recirculation #1 Sponsor Ballot closes Nov. 26, 2009 l The two negative votes each have a comment dealing with the level of detail provided in the PICS but provided no detailed proposed text. These are the only two comments left for the basis of the two negative votes. The ballot comment resolution group believed the level of detail was adequate. l No new negative votes are expected to this recirculation l Comment resolution scheduled for January Interim

Motion in Working Group l Request the 802 EC grant conditional approval for forwarding Draft 2.0 to RevCom. l Motion Passed 4/0/0 (Chair did not vote) has 12 eligible voters.

Conditional Approval to forward to RevCom l Move that conditional approval be granted to forward Draft 2.0 of P to RevCom. l Mover: Shellhammer l Second: Lynch