CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.

Slides:



Advertisements
Similar presentations
QUALITY AND TECHNOLOGY
Advertisements

Wind Turbine Session 4.
A Large Scale UPS for the Australian Synchrotron Don McGilvery Lead Accelerator Operator.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Instrumentation & Power Electronics
DC Motor Drives Dr. Ahmad Harb.
Principles & Applications
McGraw-Hill © 2008 The McGraw-Hill Companies Inc. All rights reserved. Electronics Principles & Applications Seventh Edition Chapter 15 Regulated Power.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
High Rate Kicker Preliminary Study (Quick Update) Tony Beukers/Tao Tang 4/8/14.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
Ground loops Why grounding is so important ?DefinitionGround loops :(Introduction)where ground loops affect ?Ground loops are created by :Solutions.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
© 2013 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill 15-1 Electronics Principles & Applications Eighth Edition Chapter 15 Regulated.
Protection of Microgrids Using Differential Relays
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
20 Mar 2007ACES workshop -- Switched Capacitors -- M. Garcia-Sciveres1 Switched Capacitor DC-DC converters Peter Denes, Bob Ely, Maurice Garcia-Sciveres.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Simulation results for powering serial connected magnets Daniel Siemaszko, Serge Pittet OUTLINE : Serial configuration of full rated converters.
TE EPC Safe by Design CLIC Powering Daniel Siemaszko, Serge Pittet, David Nisbet CERN, Technology Department (TE) Electrical Power Converter Group (EPC)
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
Introduction to Power Supplies
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Grounding.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Drive beam BPM Requirements and cost estimate.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Machine Protection and Operational Aspects. Launching of the working group M.Jonker CTC
بحث مشترك منشور فى مؤتمر دولى متخصص (منشور ، التحكيم علي البحث الكامل) B. M. Hasaneen and Adel A. Elbaset البحث التاسع 12 th International Middle East.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
CHAPTER 10 SYNCHRONOUS MOTOR Electrical Machines.
Report Technical Director Storage-Ring-Installation Completed
Chapter 8, pp (*figures from text)
The Survey of the Power Supply Reliability at SSRF
Power Electronics and Control in Wind Energy Conversion Systems
Single Phase Induction
Electric Machine Induction Motor
The HL-LHC Circuits: Global View and Open Questions
LV Safe Powering from UPS to Clients
M.Jonker CTC MPO-WG status
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
FCC hh dump kicker - switch topologies and impact on beam
Wind turbine technology
Introduction To Reactive Power
APPLICATIONS Reference: Textbook-Chapter 6,8 & 9 'Power Electronics',C
Collimator Control (SEUs & R2E Outlook)
Machine Protection Xu Hongliang.
COOLING OF POWER DEVICES
More Circuit Components: Capacitors, Inductors, and Diodes
SPS Injection BIS - Draft requirements
Presentation transcript:

CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1

Power converter Architecture Power conversion unit Digital control unit High precision measurement Sensor unit 25/05/2015TE-EPC / S. Pittet2

Typical LHC Power converters (1/2) 25/05/2015TE-EPC / S. Pittet3 LHC120A-10V 4-Quadrant 300 Units CERN Design LHC600A-40V 4-Quadrant 40 Units Transtechnik LHC600A-10V 4-Quadrant 400 Units EEI-CIRTEM LHC60A-08V 4-Quadrant 730 Units CERN Design

Typical LHC Power converters (2/2) 25/05/2015TE-EPC / S. Pittet4 LHC13kA-180V 2-Quadrant 8 Units CERN Design LHC13kA-18V 1-Quadrant 16 Units Transtechnik LHC4..6kA-08V 1-Quadrant 200 Units Kempower

Power converter failure (1/2) Any power device may fail open or shorted. The converter usually fails –Open in case of internal control failure –Shorted in case of a power semi-conducteur failure An additional external passive crowbar is then needed to ensure a failure in shorted mode. 25/05/2015TE-EPC / S. Pittet5

Power converter failure (2/2) Even if some converter failures may take seconds to be detected, a small current error may be quickly detected and processed. Any SEU or SEL may lead to a severe failure (including permanent damage) on the power side of the converter. 25/05/2015TE-EPC / S. Pittet6 CLIC?

CLIC power converters Drive beam quadrupoles: –41’400 magnets (75W to 750W) powered in groups of 4 or 8. –5’000 to 10’000 power converters Main beam quadrupoles: –308 x 1kW magnets (125A/0.06Ω/10mH) –1’268 x 2kW magnets (125A/?/?) –954 x 3kW magnets (125A/?/?) –1’462 x 4kW magnets (125A/0.26Ω/43mH) –4’000 power converters needed Main beam correctors (proposed by Hermann Schmickler) –3’992 x 50W magnets and power converters Note: damping rings, transport lines, turn around not yet considered 25/05/2015TE-EPC / S. Pittet7

CLIC Machine protection CLIC is essentially a continuous beam line. The duration of the main pulse is 150ns. It will be impossible to intervene once the main beam or the drive beam goes astray due to in flight errors. Once the beam permit has been delivered, power converters and their magnets must have a large enough inertia to deliver the required current during the next 2ms. 25/05/2015TE-EPC / S. Pittet8

Current inertia principles in case of failure, a passive current inertia can be provided if: A free wheeling path exists to the current. The energy stored in the magnet or in the power converter free wheeling path is large enough to compensate the losses in the magnet and in the cables during the requested safety time. Long cables will drastically reduce the inertia capability and increase the power converter ratings. 25/05/2015TE-EPC / S. Pittet9

Magnets with large time constant Current inertia depends on the magnet inductance and on the cables resistance. (i.e time constant) As an example, Type 4 main beam quadrupoles (125A/0.26Ω/43mH) would keep magnet current in a 1.2% window during 2ms, without any connection cable! 25/05/2015TE-EPC / S. Pittet10 Small current variation: ΔI/I = Δt·R/L

Magnets with small time constant (1/2) 1 st possibility: Capacitive energy storage The power converter MUST fail in open mode (fuse?). The Regulator (when present) must fail in shorted mode. The capacitor bank provides the energy to compensate the cables losses at a given current during 2ms. –0.2F needed to maintain 10A on a 1mH/100mΩ load! 25/05/2015TE-EPC / S. Pittet11

Magnets with small time constant (2/2) 2 nd possibility: Inductive energy storage Load L/R >> Magnet L/R The power converter must fail in shorted mode. The additional Inductive load provides the energy to compensate the cables losses at a given current during 2ms. Magnetic coupling management of these additionnal inductive load may be tricky. 25/05/2015TE-EPC / S. Pittet12

Low power converters costs Initial offset due to remote control, auxiliary supplies, faults supervision,… Many components must be over-rated while not available for a very low power conversion. Radiated environment has a significant impact on the power converter cost, depending on strategy applied 25/05/2015TE-EPC / S. Pittet13

Some possible scenarios Power converter close to the magnets: + Magnet initial inertia is not degraded by long resistive cables -Power converters have to be rad-hard => significant impact on the power converter cost. Power converter in a radiation safe area: + Standard power converters can be used - Long cables are needed (up to 2 times 400m) - Increase of the power converter ratings to compensate the losses in the cables. - Magnet natural inertia is lost. Additional inductors may be needed to keep the current in the requested safety window. 25/05/2015TE-EPC / S. Pittet14

Conclusion The purpose of this presentation is not to provide solutions but to highlight some possible difficulties. Inertial protection may be achieved in some cases, but may have a significant cost depending on the load characteristic. Waiting on current final tolerances and all magnets data for further investigation. A lot of technical choices may have a significant impact on power converter design and cost. Please contact us… 25/05/2015TE-EPC / S. Pittet15