1 26th May 2011 Tonbridge Station Julie Houghton.

Slides:



Advertisements
Similar presentations
Signs we see Chapter 3, Book 5A New Welcome to English (Second Edition)
Advertisements

Capital developments at SFX
Unitech Unihomes 2 : Sector 117, Noida. Being developed by Unitech, Unihomes a 70 acres project site close to the heart of Noida, is the address you have.
Environmental improvements in Giffin Street and the wider changes to Deptford town centre Sandra Plummer Project Manager, Lewisham Council Evelyn Assembly,
Tuesdays at APA–DC 13 th May 2014 The Community Streets Program in Hounslow, London: A Community-Led Approach to Street Design Gareth James Community Engagement.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
ICRA Panel System Installation Instructions
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
The Equality Act 2010 and Accessibility of lifts for disabled users.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
Presentation Template
Hampshire Learning Disability Partnership Board Representatives Transport Report Handout July 2013 Winchester and District Advocacy Project.
Presentation to: Inaugural meeting of North East Rail Forum – July 2014 Jerry Farquharson Director of Business Planning First ScotRail.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
Director of Buildings' Office Slide no.1 January 2010 Trinity College Universal Design Issues Access 2010 Cobble Reduction Access to Historic (Protected)
Hinckley Baptist Church Sanctuary Refurbishment Proposals 2010.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
GLASGOW RAPID TRAMWAY The GRT Project. GRT presentation to Glasgow City Council Friday 17th December 2004 by Prof. Lewis Lesley (TRAM Power Ltd) Lincoln.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
Public Transport Liaison Meeting London Borough of Merton A part of the Stagecoach Group Matt Winnie Area Manager.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Arriva in Southend Kevin Hawkins Commercial Director.
STUDENT INDUCTION. FIRE PROCEDURE The fire alarm is a claxon sound Leave the building quietly by the nearest exit Do not use the central staircase Stand.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Vehicle enters through this gate Vehicle exits through this gate 1. Entering and Exiting the Hire Car Zone.
New Community Athletic Stadium Opening at Heslington West September 2014.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Stair Construction and Layout
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Transport Focus Update Nina Howe Passenger Manager.
Oxfordshire County Council has exciting plans to transform the centre of Oxford’s transport and pedestrian experience.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Southampton Boldrewood Innovation Campus Event Management Process Are you a member of Engineering and the Environment No Yes Booking rooms as a Non Faculty.
THE CRANBEL COURT CITIVIEW AREPO. We are pleased to announce the launch of our new and elegant product, the Cranbel Courts Apartment, Citiview, Arepo.
HEATH ROAD ALLOTMENTS. Allotments Allotments are a Statutory provision and contribute to delivering key priorities of the Councils Corporate Plan 2011/2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
KGN Estate All Rights Reserve with KGN Estate1 KGN Estate Adding Values to life KGN Estate Adding Values to Life.
E N T E R P R I S E S. A COMMON MANS DREAM COME LIVE WITH US AT HEIGHTS.
MRT/LRT Station.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
Shree Chand Homes Presents GOLF VIEW HOMES Situated at Greater Noida, Dadri Road next to Ansal’s Golf Link II a very close location From proposed Metro.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
For More Details - trianglehttp:// triangle.
Encouraging Cycling in London – A Lambeth perspective Dawn Rahman: Transport Policy Manager.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
VEHICLE SAFETY. INTRODUCTION VEHICLE MEANS ANY MOTORIZED EQUIPMENT USED FOR THE TRANSPORTATION OF A PERSON / PEOPLE OR CARGO. INCLUDES CARS, TRUCKS, BUSES,
How easy is your building to use?

“kicking on to the finish”
St Michael’s C of E Primary School Front of School Enhancements
Current Scenario in the city Infrastructure :
3. Refurbishment - Project 1
Facilities Modernization Program
Public Space Accessibility
Home safety/security tips
How easy is your building to use?
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Wates CBE Learning Operation defects: Snag sheet slide presentation
Presentation transcript:

1 26th May 2011 Tonbridge Station Julie Houghton

26th May NSIP- Background National Stations Improvement Programme (NSIP).  A £150 million initiative set up by government.  Tranche 1 - £100 million.  Tranche 2 - £50 million.  Beneficiaries must be in National Top 500 stations for passenger footfall.  Objective is to use NSIP allocation to secure third party funding, wherever possible.  Key aspiration is to improve passenger perception at stations (as measured by twice yearly National Passenger Surveys).

26th May Southeastern NSIP Southeastern Local Delivery Group (LDG) - is chaired jointly by Southeastern and Network Rail, and the members include the project management teams, British Transport Police and Passenger Focus. This group has worked since the launch of NSIP to agree the priority stations and liaise with potential other fund holders to maximise the extent of works that could be considered. Southeastern LDG share of Tranche 1 - £14.3 million Southeastern LDG share of Tranche 2 - £5.02 million For some stations (e.g. Dartford and Deptford) we have secured other funding up to £6m and this allows for complete new stations

26th May Tonbridge Station

26th May Southeastern NSIP Scope includes: –Replacing all information screens to new flat screens, including making provision for a future real time bus information screen –Refurbishing all toilets (see layout on next slide) –Installing more cycle parking –Extending the booking hall –Creating another door at the front of the station –A new waiting room –Replacing the metal staircase from the road down to underpass for the car park –Improvements to the entrance from Barden Road into the station

26th May Toilet layout and specification

26th May New Waiting Room This will replace the existing on platform 1 and 2. -This is a better fit with where on the platform passengers wait -And allows for the removal of the cabins currently forming a coffee shop and staff information point, with relocation into the current waiting room. -This reduces the congestion at the bottom of the stairs Removal of redundant planters along platforms

26th May Barden Road entrance This entrance will have new flooring, a dropped ceiling and will have an internal wall created beside the lift to enclose the area. The dropped ceiling will have inset lighting, and will remove the ledges pigeons like to roost on. Metal steps from the front of the station down to the alley for the car park will be replaced

26th May Barden Road entrance plan

26th May Tonbridge Station front There will be two openings to reduce passenger congestion Doorway to the retail (currently a taxi office) will be from the road and not through the booking hall New anti-slip flooring New mat-wells Relocation of the ticket vending machines to improve queuing area Windows and doorways will be replaced The station tiles on the exterior walls will be clad with a brushed steel finish

26th May Tonbridge Station front

26th May Tonbridge Station front The plans have been approved by Tonbridge and Malling Borough Council The cladding will be installed over the existing tiles, the survey works have indicated this is the safest solution to keep any disruption to a minimum New doors and window placement have been designed to give a symmetrical appearance while enabling an improved passenger flow through the station New anti-slip flooring to improve accessibility, the slight relocation of the automatic barriers will also improve flow through

26th May Programme We are in the detailed design stage currently. On site from early September with completion spring 2012 Works will be phased to keep the station entrances open –There will be hoarded off areas of the booking hall at times during works –There will be a site compound and some restricted access at times –The project team will work to keep disruption to a minimum

26th May Programme There may be times where works will be at night for safety reasons. –Moving heavy materials when passengers are not on the station –Work at height where it would be unsafe to work with trains running We will write to residents closer to the start on site with the programme, and we will write with dates of any night works once the contractor is able to confirm them.

26th May Questions ?