1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy.

Slides:



Advertisements
Similar presentations
Evaluation Capacity Building Identifying and Addressing the Fields Needs.
Advertisements

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Underwater Active Acoustic Monitoring (AAM) Network for Marine and Hydrokinetic.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Integrating Fisheries and Habitat Management in Asia: the Regional Fisheries Refugia Initiative Christopher Paterson, UNEP/GEF South China Sea Project.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
Compact Policy and Legislative Coordination Jason Liechty Environmental Projects Coordinator Natural Resources Planning and Management Division Broward.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Iowa Hill Pumped-storage Development PI:
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Water Use Optimization: Hydrologic Forecasting Presenter: Mark Wigmosta Organization:
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
Phil Bass Gulf of Mexico Alliance February, 2011.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Three Port Marine Power Electronics Conversion System Mark Holveck Princeton.
The National MPA Center: Helping to Conserve our Nation’s Marine Resources Lauren Wenzel National Marine Protected Areas Center.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower Innovative System Testing (1.2) Department of Energy,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- AWP Alex Fleming: PI Dehlsen.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Effects of Hydrokinetic Tidal Turbines Dr. Brian Polagye University.
Dr. Howard Nelson Biodiversity Specialist Ministry of Planning, Housing and the Environment Trinidad and Tobago.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
The Multipurpose Marine Cadastre A Tool for Planning & Decision Making in the Marine Environment Christine Taylor Minerals Management Service (MMS) David.
Water Supply Planning Initiative State Water Commission November 22, 2004.
SPATIAL ASSESSMENT OF THE GULF OF MEXICO & CORAL REEF FISHERIES WITH AN EMPHASIS ON THE 2010 DEEPWATER HORIZON OIL SPILL Patrina Bly Educational Partnership.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
1 Bureau of Ocean Energy Management Assessing Historic Properties and Cultural Resources in the Main Hawaiian Islands Dave Ball, MA, RPA Pacific Region.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower System and Component Development (1.1) Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Integrated Basin Scale Hydropower Opportunity Assessment Initiative Simon Geerlofs.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review THOR’ s Power Method for Hydrokinetic Devices Turner Hunt THOR Energy Group LLC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Environmentally Benign and Permanent Modifications to Prevent Biofouling on Marine.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
MMS Gulf of Mexico OCS Environmental Studies Plans for the Gulf of Mexico Lars Herbst MMS Regional Director Gulf of Mexico OCS Region.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Preparatory Stakeholder Workshop - Laos 26 May 2010.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion.
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of the Environmental Effects of Hydrokinetic Turbines on Fish: Desktop.
1 Energy Policy Act of 2005 Amended Section 8 of OCSLA Amended Section 8 of OCSLA Gave MMS authority over offshore renewable energy leasing Gave MMS authority.
EU-HCWM “Developing an EU Standardised Approach to Vocational Educational Training Awards in Healthcare Waste Management” Project No LLP UK-LEONARDO-LNW.
COSA Committee Meeting
MERMAID Innovative multi-purpose offshore platforms: planning, Design and operation MERMAID.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
PARIS21 - League of Arab States
Information Session January 18, :00-1:45 pm
Principal Investigator ESTCP Selection Meeting
Figure 3. The Deepwater Horizon oil spill presents a vast and complex three-dimensional threat to organisms, habitats and ecosystems of the northern Gulf.
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Projects in Offshore Southeast Florida Charles Vinick, PI Dehlsen Associates, Inc September 26, 2011

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Purpose: Investigate areas offshore southeast Florida that appeared most suitable for siting of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore of southeast Florida (offshore of Miami-Dade, Broward and Palm Beach Counties.) Objectives: Development of an acceptable bottom habitat survey methodology and siting study framework in consultation and cooperation with regulatory and resource management agencies. Identification of general areas offshore southeast Florida that appear most suitable for installing marine and hydrokinetic energy facilities, including subsea electrical transmission cables to shore, based on the distribution of sensitive bottom habitats identified by existing and supplemental surveys conducted for this project.

3 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Integration: This project seeks to demonstrate to resource management agencies how project proponents would use the information collected under this grant and exercise due diligence in evaluating possible pre-screened sites/areas in the Atlantic Ocean offshore of southeast Florida. Use existing available information and information collected under this grant in the early planning phase of a proposed project to avoid adverse impacts to the environment so that a proposed project is sustainable over its operational life. Project developers’ selection of a specific project site from among pre-screened sites/areas will likely reduce time/effort that agencies would invest during the review process of the siting alternatives. The project results will be disseminated via the FAU website ( and the NSU National Coral Reef Institute (NCRI) website ( beginning in December 2011 and through presentations at conferences by the grantee and subcontractors. The websites will acknowledge that all study information and results were developed by DA, LLC and its partners under a DOE Advanced Water Power grant.

4 | Wind and Water Power Programeere.energy.gov Technical Approach Step 1: The first step of the technical approach consisted of the compilation and review of the most recent and readily available studies on benthic substrate and habitat types in the Atlantic U.S. waters of southeastern Florida. The literature review was expanded beyond the proposed lease blocks to gain: –a much better understanding of benthic habitat seafloor mapping studies available in the southeastern Florida region. –knowledge and compile available mapping information of known coral reef and hard-bottom communities within a study area that extends from Offshore Miami-Dade County to Palm Beach County.

5 | Wind and Water Power Programeere.energy.gov Technical Approach Step 2: Tier 1 – consisted of gaining overall insight about seabed conditions offshore southeast Florida by conducting a geophysical survey of pre-selected areas with subsequent post-processing and expert data interpretation by geophysicists and experienced marine biologists. Tier 2 – consisted of validation of benthic habitat types interpreted from the geophysical data by conducting benthic video and photographic field surveys of selected habitat types. The goal of this step was to determine the degree of correlation between the habitat types interpreted from the geophysical data and what actually exists on the seafloor based on the benthic video survey logs.

6 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule: Budget: Siting Study for a Hydrokinetic Energy Project Located Offshore Southeast Florida Completion Status Summary of Tasks Task 1. Compile Habitat Mapping from Existing Data Completed Task 2. Develop Approach and Survey Methodology Completed Task 3. Geophysical and Benthic Video Surveys Analysis Underway - To be completed by Oct. 30 th, 2011 Task 4. Presentation of Siting Study Results Begin Nov. 1, 2011 (Final Report due by Feb. 29, 2012) DE-EE AWPT-2 Budget History - DOE Peer Review FY2010 ActualFY2011 BudgetFY2012 BudgetTotal 10/01/ /30/1010/01/ /30/1110/01/ /30/12 DOE Cost- share DOE Cost- share DOE Cost- share DOE Cost- share 170, , ,461 47, ,000 47,533

7 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Challenges to Date Accomplishments: The project team has accomplished all Tasks described under Steps 1 and 2 above of the Technical Approach. The Dehlsen team is performing final analysis of the collected data and will report findings by February 29 th, 2012 (90 days or less from grant completion date of November 30, 2011). Challenges to Date: The greatest challenge faced during the execution of this project was the management of the budget exacerbated by the massive oil spill that occurred in the Gulf of Mexico caused by the explosion on the Offshore Deepwater Horizon Oil Platform on April 20, Project team had to wait several months before a suitable vessel was located to execute the planned field activities associated with Tier 1 (Step2). Project is back on track and final reporting is planned for the end of February 29 th, 2012 (90 days or less from grant completion date of November 30, 2011).

8 | Wind and Water Power Programeere.energy.gov Next Steps Under this Grant Award: Reporting of findings and conclusions at the end of February Beginning in December 2011, project results will be disseminated via the FAU website ( and the NSU National Coral Reef Institute (NCRI) website ( and through presentations at conferences by the grantee and subcontractors during 2011/2012 timeframe. Potential Expansion and Opportunities for Future Work: Budget was very limited and caused to streamline acquisiton of data for Tiers 1 and 2. Future work could include the acqusition of Tier 1 and Tier 2 information in other areas of the Atlantic Ocean offshore of southeast Florida (offshore of Miami-Dade, Broward and Palm Beach Counties).