Some aspects of the DAQ for the Tile-HCAL Prototype Volker Korbel, DESY, for the CALICE/Tile-HCAL group Montpellier, France, 13-16 November 2003 Hadr.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
, DESY HCAL meetingG. Eigen, U Bergen/DESY2 Agenda of Worldwide Calorimeter & Forward Detector Project Day TIME TITLE OF TALK SPEAKER 14:
The Tile-HCAL Physics Prototype; concept, status, time plan Volker Korbel, DESY, for the CALICE Coll. Montpellier, France, November 2003 Groups involved:
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
V. Korbel, DESYECFA-DESY Workshop, NIKHEF1 Readout for the minical and Tile-HCAL prototype, 15’ The VFE RO: The light signals Photo-detectors 1) APD’s.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
JRA3 Institute of Physics ASCR Prague
DAQ ACQUISITION FOR THE dE/dX DETECTOR
CTA-LST meeting February 2015
Power pulsing of AFTER in magnetic field
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Vishnu V. Zutshi For the NICADD team.
STATUS OF SKIROC and ECAL FE PCB
ECAL Electronics Status
BESIII EMC electronics
SKIROC status Calice meeting – Kobe – 10/05/2007.
E. Garutti - Main Meeting
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Testbeam analysis on module #1
Scintillator HCal Prototype
Presentation transcript:

Some aspects of the DAQ for the Tile-HCAL Prototype Volker Korbel, DESY, for the CALICE/Tile-HCAL group Montpellier, France, November 2003 Hadr. Calorimeter HCAL Analog version: scintillator tile read-out, small tile sizes, moderate granularity Si-PM or APD as sensors MiniCal : photodetectors DAQ, Formats Physics Prototype granularity DAQ scheme trigger, rates beam time required preamps, VFE time schedule 2003/1004

V. Korbel, DESY, CALICEMontpellier, France, November Single looped fibre strong fibre bending, most stress on fibres, probably ageing damages? tiles, fibers, light yield Centre/straight WLS-fibreDiagonal/bent WLS-fibre No stress on fibre, fibre end reflector =tile reflector L=7,85cm L=5cm L=20cm 1.4 mm hole in centre drilled and polished For 5 cm straight WLS-fibre RO cheep, for SiPM’s only more stress on fibre, fibre end reflector =tile reflector L=7.85cm clear RO fibres: l=1-3.5m to photo detector light attenuation <18%

V. Korbel, DESY, CALICEMontpellier, France, November Photo-detectors “Conventional” “Direct coupling” Optical Connector + SiPM, APD WLS&SIPM ways: SiPM Presented and discussed in Boris Dolgoshein’s and Erika Garutti’s talks today. Si-PM’s (MEPHI/Pulsar): 1024 pixels, 1 mm 2, on tile, gain ~ 10 6 at ~ 60V U bias need low noise fast preamplifiers APD’s (Hamamatsu S spl) 3 x 3 mm 2 photo-cathodes, gain ~200 at ~ 420V U bias need charge sensitive, low noise preamplifiers Need special masks on photo-cathode for optical fibres Light yield for MIP’s (used for calibration): ph.e. on photo-cathode

V. Korbel, DESY, CALICEMontpellier, France, November MiniCal array, 1. prototype Assembled with: 13 scintillator layers of 9 tiles in cassettes with 117 scintillator tiles 117 Si-PM photo-detectors: 1 tile/Si-PM 36 photodetectors: APD’s or 3 MA-PMs,16 pix. each 3 tiles/pixel E-beam Aim of these studies: with cosmics, study of: LY uniformity of response stability of MIP signals different photodetectors long term ageing calibration with MIP’s LED monitoring: stability dynamic range measurement e-beam, study of: energy resolution constant term X X X

V. Korbel, DESY, CALICEMontpellier, France, November MiniCal, visitors view

V. Korbel, DESY, CALICEMontpellier, France, November Status of DAQ (MiniCAL, I) Up to 200 ADC channels  controlled via CAMAC CAMAC crate Power Supply current limits checked  sufficient power for 22 ADC modules (2249A) synchronization of multiple ADCs at high rates (~1kHz)  PC parallel port + special TTL-NIM adapter Data Acquisition system for MiniCal:

V. Korbel, DESY, CALICEMontpellier, France, November Linear Collider I/O (LCIO) “persistency” framework defining a data model for LC Studies Generator geometry Analysis Recon- struction Simulation LCIO Persistency Framework Java, C++, Fortran Geant3, Geant4 Java, C++, Fortran LCIO: - I/O Format agreed upon for LC related studies -Facilitates sharing of results -Originally developed for MC purposes (Mokka/Brahms) -Recent version v00-08 contains also data entities to store real data - Frank Gaede more info  Data (new) Detector

V. Korbel, DESY, CALICEMontpellier, France, November pad sizes, granularity, # of tiles 3, 6 and 12 cm

V. Korbel, DESY, CALICEMontpellier, France, November The Ppt DAQ concept APD fibre masks or flat-band connector to Si-PM cassette RO printed circuit ~ 3m analogue RO CALICE UK group, P. Dauncey 16 bit ADC‘s

V. Korbel, DESY, CALICEMontpellier, France, November The Ppt DAQ concept Energy measurement: 16-bit ADC’s to cover large dynamic range between MIP’s (ch. 50) and 5 GeV on cell ( ~200 x larger) Trigger: coincidence from beam- or cosmic-trigger coincidence, LED, min. bias Latency of overall trigger path < 180ns This is from peak of shaping time in VFE chip for sample-and-hold Jitter on trigger < 10ns Trigger sent after event, not before No trigger from VFE level, some delay of analogue signals Beam measurements: particle type, x-y, time, double hits in shaping time (early and late pile-up) Beam counter, rate monitoring slow controls U bias, LV, temperatures, LED settings,...

V. Korbel, DESY, CALICEMontpellier, France, November DAQ rates, beam time request Need high statistics for accurate simulation comparison Multiple set-ups (energy, particle type, HCAL, angle, TC, etc) ~ 10 2 Need high statistics per set-up; accurate to 3  needs ~ 10 6 events Need to take data in a reasonable time For 10 8 events total, need around ~100 Hz average >>> minimum 10 6 seconds is around two weeks continuous running time Several months realistic beam time

V. Korbel, DESY, CALICEMontpellier, France, November The VFE-ROB-scheme, APD’s Array of single APD’s n x 9 x 2 pulse shapers Sample & hold Multi plexer (analog) Trigger/ RO clock LED signals PIN diode for LED monitoring HV, decoupled, common value charge sensitive preamps HV, < 440 V on board  V/V~ ,03 mA/ch cosmic beam Charge injection DAC, pedestals pedestals

V. Korbel, DESY, CALICEMontpellier, France, November The VFE-ROB-scheme, Si-PM’s pulse shapers Sample & hold Multi plexer (analog) Trigger/ RO clock HV, decoupled Receiver + PM voltage fast preamps (gain variable ? ~10) pedestals HV on board, PC controlled ~ 60 V  V/V~10 -3 cosmic beam Charge injection DAC Variable gain,3-4 steps Signals from Si-PM‘s in calo structure

V. Korbel, DESY, CALICEMontpellier, France, November Sh S&H Mul PrA Orsay FLCHPY3 Dig. DATA A P D 17 (18) ADC AD bit 1µsec/ch HV 20 Sept. VFE board development status, Dubna Input from Igor Tiapkin

V. Korbel, DESY, CALICEMontpellier, France, November LED test Dubna test board for CAMAC RO Ready soon for tests with CAMAC

V. Korbel, DESY, CALICEMontpellier, France, November R&D for Ppt, VFE prototype cards VFE-Boards with LAL/Orsay preamp chips for APD’s: LV supply multiplexed ADC RO HV-PS (500 V) LED monitoring multiplexing VFE / CAMAC RO 2 options: APD gain >200:12 mV/7.2 fC <100:12 mV/1.8 fC

V. Korbel, DESY, CALICEMontpellier, France, November Reading LAL/Orsay chip. Critical to the SH signal ±10nsec Multiplexer switching time ~100 nsec 2. ADC on board is ok. 3. Data are in CAMAC. 4. Now tests with 2 APD (and Si-PM’s) is going on. Await soon: 1.Number of channels per board? 4 FLC chips - 72 channels ADC AD bit, 4 ch, 1µsec µsec readout time LED test? need help from DESY for design (mechanics, exp. from H1) VME modules from UK? need readout in spring 2004 Dubna, present status

V. Korbel, DESY, CALICEMontpellier, France, November VFE solution for Si-PMs Have to inquire and take decision soon: fast preamps, short gates, to reduce noise collection voltage amplifier ok? fast preamp output to be gated by trigger ( ns later) >>>needs: fast analogue delay lines or fast switch capacity memory downstream preamp ahead of shaping how many channels/board ( Si-PM’s ?) U bias, ~60V, remote set of +/0.1 V steps, 10 steps?

V. Korbel, DESY, CALICEMontpellier, France, November Dubna, next steps Prot. test Pilot boards production Materials ? HV test If ok LED calibr. Test? NOWNOW First board Second board 2 months 1 month ? End November, HCAL main-meeting End of 2003 ? HV on board: APD ~400V generating on the board (tuning for each channel probably not needed) SI-PM’s ~60V delivering to board, tuning for each channel

V. Korbel, DESY, CALICEMontpellier, France, November the Ppt construction program Ppt stack construction: 3 months tender and ordering 3 months to build Moving beam platform include in 6 month More APD’s to order, have 58, need 150 (200), 2 month delivery Press form for tile production: 4 months Scintillator production >> tiles: 3months Si-PMs (~5000) 3 months production, 3 months acceptance tests 2. batch (~3000) needed Acceptance tests with tiles with inserted Si-PM’s needs 3 months after production, 1. September finished Cassettes design to be fixed next 3 months, test needed All equipped cassettes could be available in end October 2004 Decision on preamps and VFE logic for Si-PM’s and APD’s in 2003 Prototype VFE board from Dubna needed spring 2004.>>>>>>>>all boards ready Sept.2004 CALICE-UK DAQ prototype ready 1. March 2004 March-August, System tests with cassettes, cosmic and DAQ at DESY, need increasing quantities of cassettes Ppt e-beam test with ECAL at DESY in October 2004