LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the.

Slides:



Advertisements
Similar presentations
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Advertisements

Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Low Emittance RF Gun Developments for PAL-XFEL
1 EPIC SIMULATIONS V.S. Morozov, Y.S. Derbenev Thomas Jefferson National Accelerator Facility A. Afanasev Hampton University R.P. Johnson Muons, Inc. Operated.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
CERN/GSI beam dynamics and collective effects collaboration meeting 18 th February 2009 High Intensity Operation of the CERN PS Booster (PSB) Christian.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
PIL/LEIR Presented by M. CHANEL April 4 th PILLEIR.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Halo Collimation of Protons and Heavy Ions in SIS-100.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
Lead performance throughout the injector chain with focus on LEIR
Installations up to Start of Commissioning
Alternative/complementary Possibilities
Plans for ions in the injector complex D
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Acknowledgments: LIU-PT members and deputies, H. Bartosik
New AD Production Beam in the PSB
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Accumulation in the LEIR Ring
SLHC-PP kick-off meeting, CERN 9 April 2008
PSB magnetic cycle 900 ms MeV to 2 GeV
Achieving Nominal Ion Beam PS Ion Progress
Multi-Ion Injector Linac Design – Progress Summary
Plans for future electron cooling needs PS BD/AC
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the first MAC presentation (15 th December 2005) Completion of LEIR Commissioning : –January 2006 “shutdown”, –Summary, –Expected and unexpected Problems, LEIR Status Conclusions and Outlook C. Carli on behalf of the LEIR commissioning team

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 2/15 Many people have contributed to construct LEIR and in LEIR commissioning: I-LHC project leader(s) : S. Maury (and before K. Schindl) LEIR project leader : M. Chanel Commissioning team : P. Belochitskii, L. Bojtar, C. Carli, M. Chanel, K. Cornelis, B. Dupuy, J. Duran, T. Eriksson, S. Gilardoni, D. Manglunki, E. Matli, C. Oliveira, S. Pasinelli, J. Pasternak, F. Roncarolo, G. Tranquille Many people from several departments and many groups have constructed and installed all the equipment we use: –despite a lot of pressure mostly in time, –Impossible to compile a list of all contributors (more than 100 contributors are on the I-LHC mailing list).

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 3/15 Introduction Recap on LEIR Pre-LHC ion accelerator chain cannot be provided the bright LHC beams needed.  Upgrades of the ion chain: –New ion source,  Low Energy Ion Ring LEIR accumulating ions:  Elaborate multiturn injections: (70 turns > 50% efficiency),  Electron cooling (BINP): (cools within 200 to 400ms)  Transforms long (200 µs) Linac 3 pulses to short (200 ns) bright bunches. –RF gymnastics in PS ……. LEIR in autumn 2005 (few days after first circulating beam) Ejection RF Injection Electron Cooler (from BINP)

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 4/15 Introduction General comments Aim of LEIR Commissioning : –Provide beam needed for first LHC runs with less bunches and luminosity (less demanding for injectors and LHC) :  Shorter cycle lasting 2.4 s each one delivering one bunch with ions,  Transverse (normalized RMS) emittances 0.7 µm,  Longitudinal emittance eVs/u. Commissioning in Phases : –Lines in May and June 2005, –LEIR ring in autumn 2005 and beginning of First Phase of LEIR Ring Commissioning with O 4+ : –Beam rigidity very close to Pb 54+, –Longer life-time expected (is that true ?) and cooling times,  Simpler for diagnostics. Early LHC ion beam in PS and SPS in 2006 and 2007, respectively.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 5/15 Introduction Situation at the time of the last MAC presentation Successful commissioning of: –Injection line, –Injection, lattice, many beam diagnostics instruments, RF …. Difficulties with first cooling and accumulation: –Short life-times, explainable by high pressure in some regions (problems with recuperated bellows (?) and an ionization profile monitor), –Barely no increase in local density. Recommendation of the MAC: –Consider O 8+ for first commissioning, –After some reflections, we decided to continue with Pb 54+  Risky, but still the possibility to switch to O 8+ in case of problems,  Only way to keep a chance to complete LEIR commissioning on time,  Faster cooling makes life-time less critical,  Turned out to be the right choice.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 6/15 Completion of LEIR Commissioning January 2006 “shutdown” LEIR Commissioning on hold in January 2006 (access system …)  Opportunity to open vacuum sector 5 (known difficulties, broken ionization profile monitor): –Traces of ion impact on ionization profile monitor (-> addition of Au coated plates) Definite cure of pick-up cable problem: insulate head amplifier box from bending Everything ready to restart at mid of February Wire reducing the aperture Traces from ion impact Au coated plates Looking opposite to beam direction

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 7/15 Completion of LEIR Commissioning Summary Restart at middle of February 2006 –Problems (expected) again with controls (magnetic cycle):  good collaboration with controls experts. –Circulating Pb 54+ beam obtained quickly,  Improved beam life-time !! –Again serious difficulties with injection line. Electron Cooling without particular difficulties on 3 rd March 2006: –Accumulation very soon afterwards. First synchronization and ejection on 11 th April Short life-time (1s to 3s instead of up to 14s) observed on 20 th April: –No reason identified, disappeared over a ~1 week for PS interventions. Beam in front of PS injection on 24 th April 2006 Last phase (extension) perturbed by PS (and SPS) restart Commissioning completed on 12 th May 2006: –Profile monitors in ejection line available during last week only, –“Early LHC ion beam” by accumulation of two Linac 3 (low beam current traded for stability) shots.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 8/15 Completion of LEIR Commissioning Expected and unexpected Problems Controls: –LEIR as testbed for LHC controls,  Difficulties –often recurrent- as expected (magnetic cyle generation …), –Good collaboration with controls experts,  Working (not yet perfect) control system,  No migration to another control system in near future. Injection line matching: –Problems with Pb 54+ similar to O 4+,  Updated optics model based on measurements. Electron cooling and accumulation: –Some worries after experience at the end of 2005,  No particular difficulty to set up cooling and accumulation in  Difficulties cured by upgrades during January shutdown ?,

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 9/15 Completion of LEIR Commissioning Expected and unexpected Problems Transverse beam dynamics on ramp: Reason: –C-shaped bending magnets & chamber connected to ground at several locations,  Ramp induces net Eddy current & gradient,  Optics perturbations Cure: –Compensation by adding currents to five main quad families, –One parameter (conversion of ramp to gradient) optimized,  Good acceleration efficiency. Measured Quadrupole currents along the machine cycle with compensation of gradients in bends during ramp Compensation increases current

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 10/15 Completion of LEIR Commissioning Expected and unexpected Problems “Dynamic vacuum” and collimation: –Vacuum degradation due to lost ions limited proof experiment in 1997,  Upgrades based on systematic measurements at Linac 3:  Au (low outgassing) coated Collimators (fixed and movable),  Additional pumping (NEGs wherever possible).  Sufficient life-time (up 14 s – interaction with rest gas and cooler) without difficulties and movable collimators in “parking position”. Short life-time (1s to 3s instead of up to 14s): –Suddenly observed on 20 th April 2006, no reason identified, –Disappeared over a ~1 week stop for PS interventions – Unfortunately not understood !!!

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 11/15 LEIR status Circulating beam intensity (yellow) and magnetic field (purple) vs time. “Early LHC ion beam” produced on a 2.4 s machine cycle Injection with efficiencies up to 50% (~design) (  17 μA from Linac -> two injections) Longer plateau & accumulation of two shots needed ~2.3E8 ions at ejection Acceleration within 0.8 s (instead of 1s)

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 12/15 LEIR status Electron cooling and accumulation Time evolution of longitudinal Schottky spectra -> time evolution of long. distribution -> observation of long. cooling and accumulation white …… zero density red …… highest densities t (s) ∆p/p (10 -3 ) 1 st injection 2 nd injection accumulated stack (ready for bunching) cooled stack Horizontal beam size evolution measured with an ionization profile monitor (long cycle with 400ms between injections) Injections Start acceleration Bunching

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 13/15 LEIR status Ejection and Transfer Last TV of the ejection line (~5m before PS injection region) SE (wires) profile monitors in the ejection line: - transverse emittances (rms normalized) : ~0.26μm - matching: (almost) no horizontal mismatch, vertical mismatch should be corrected. - Ejection kicker (green), - Sum (yellow) and difference (purple) of ring PU, - Ejection line beam curremnt transformer (blue) Ejection: Vertical mismatch (at ejection point)

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 14/15 LEIR status Towards the nominal LHC ion beam Towards nominal LEIR beam : No systematic investigations: –not aim of commissioning and no time available. Accumulation tests with very long plateaus (yellow trace shows intensity): –Intensities well above the nominal ones (after very long accumulation), –Dynamic beam life-time after accumulation (and losses) ~14s, –Good sign for “nominal LEIR beam”.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 15/15 Summary, Conclusions and Outlook The required “early LHC ion beam” has been produced: –Two injections needed (-> acceleration in 0.8s instead of 1s), –Parameter of ejected beam well within specifications, –Successful tests of Controls developed for LHC.  LEIR construction and commissioning completed: –(almost) on time -> big success of the whole LEIR team, –LEIR can provide the “early LHC ion beam”, –Cures for all difficulties implemented. Outlook: –Still some work to make LEIR fully operational (Schottky diagnostics, final version of digital low level RF, broken ionization profile monitor, controls …), –LEIR Re-start (from the “CERN Control Centre” CCC ?) in autumn 2006, –Provide beam for “Early LHC Ion Beam” Commissioning of the PS in autumn 2006, –Provide beam for “Early LHC Ion Beam” Commissioning of the SPS in 2007 –Prepare the Nominal LHC Ion Beam in LEIR and further downstream.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 16/15

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 17/15 Linac 3 ETL line PS ring Injection Ejection LEIR ring ITE loop ETL.MTV10 ETL.MTV40 ER.MTV12

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 18/15 LHC ion injector chain overview Pb 27+  Pb 54+  LEIR Repetition rate up to 5 Hz After acceleration and stripping :  A Pb 54+ at 4.2 MeV/n - >120  s long pulses Energy ramping cavity  p/p ~0.4% (needed for LEIR injection) Accumulation of ~4 Linac pulses : - Multiturn injection (transverse+longit.) (70 turns with 50 % eff). - New electron cooler constructed by BINP. Bunching, acceleration and transfer to PS. Two bunches corresponding to 4 LHC bunches at 72 MeV/n every 3.6 s. -RF gymnastics to obtain 4 LHC bunches spaced by 100 ns. - 4 LHC bunches at 5.9 GeV/n every 3.6s. Al Stripper Pb 54+ to Pb 82+ : low-beta insertion - Accumulation of up to 13 LEIR/PS batches on a ~40s plateau. - “Variable (non-integer) harmonic” acceleration. - Direct space charge and IBS limit ? - Up to 52 LHC bunches per cycle at 177 GeV/n 200  A Pb 25+ at 2.5 keV/n - Each ring filled (during ~10 min): * with 12 SPS batches, * total 592 bunches per ring. -Design : * Luminosity cm -2 s -1, * Collision energy 2.76 TeV/n. -Limited by collimation and ECPP ?

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 19/15 Outlook until Completion of LEIR Commissioning Expected Problems Loss pattern of Pb 53+ ions around the LEIR ring with collimators and homogeneous gas density Intercepted by absorbers : -Reduced outgassing with Au coating, -Efficient scrubbing due to small surface Injection Cooler “Dynamic life-time” Avalanche-like pressure rise : ions lost due to rest gas electron capture (or loss) (Pb 54+ -> Pb 53+ ), every lost ion desorbs some 10 4 molecules, Observed in POP in LEIR upgrades based on measurement at Linac 3 NEG coatings in straight sections to improve vacuum there