1 Proposed Changes to the Accreditation Process CDE Briefing for the Colorado State Board of Education March 5, 2008.

Slides:



Advertisements
Similar presentations
MSIP Accountability Plan
Advertisements

Local Control Funding Formula & Local Control Accountability Plan Stakeholders Meeting February 26, 2014.
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education Updated: July 2011.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. LOCAL.
Local Control Funding Formula & Local Control Accountability Plan Stakeholders Meeting March 12, 2014.
Local Control Funding Formula Local Control and Accountability Plan An exciting time for our kids and our schools.
LCFF & LCAP. Key Precepts of LCFF Based on specific considerations: Equity, additional resources for students with greater needs Low-income students English.
Local Control Accountability Plan Elvin Momon, Superintendent Board of Trustees Barbara Dew, Board President Timothy Hauk, Board Vice President Rita Jackson,
LOCAL CONTROL FUNDING FORMULA (LCFF) & LOCAL CONTROL ACCOUNTABILITY PLAN (LCAP)
IMPLICATIONS FOR KENTUCKY’S SCHOOLS AND DISTRICTS SUPERINTENDENTS’ WEBCAST MARCH 6, 2012 NCLB Waiver Flexibility 1.
MSDE Alternative Governance Plan Development School: James Madison Middle School January 2012.
Campus Improvement Plans
ALIGNING PLANS TO ENSURE STUDENT SUCCESS GETTING SMARTER ABOUT ASSESSMENT JANUARY 14, 2015 NANCY SEDGWICK, SAN DIEGO COUNTY OFFICE OF EDUCATION.
Texas State Accountability 2013 and Beyond Current T.E.A. Framework as of March 22, 2013 Austin Independent School District Bill Caritj, Chief Performance.
Determining Validity For Oklahoma’s Educational Accountability System Prepared for the American Educational Research Association (AERA) Oklahoma State.
Getting Organized for the Transition to the Common Core What You Need to Know.
Monthly Conference Call With Superintendents and Charter School Administrators.
IE 2, CHARTER, AND STATUS QUO SCHOOL SYSTEMS Flexibility Options Comparison F EBRUARY 26, 2015 Ken Thompson Chief Financial Officer.
A Presentation For Mojave Unified School District.
An Overview of the Local Control and Accountability Plan (LCAP) January 25, 2014 FREMONT UNIFIED SCHOOL DISTRICT Educate Challenge Inspire.
Forsyth County Schools Overview of the Proposed IE 2 Partnership Contract.
LCFF & LCAP. Key Precepts of LCFF Based on specific considerations: Equity, additional resources for students with greater needs Low-income students English.
Academic Excellence Indicator System (AEIS) Annual Report and Public Hearing Grapevine-Colleyville ISD
Los Angeles County Office of Education Division for School Improvement School Site Council (SSC) Training September 9 th 2008 Anna Carrasco From presentation.
Implementation School Readiness Assessment System and the READ Act Webinar January 23, :00-6:00 pm.
South Carolina Public Charter School District Performance Framework Dana C. Reed, Assistant Superintendent of Performance Standards Courtney Mills, Director.
Los Angeles Unified School District Edgar Zazueta, Chief of Staff-External Affairs Valley Schools Task Force 1/29/14 Los Angeles Unified School District.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
“An Act Relative to the Achievement Gap” Report of the Superintendent Melinda J. Boone, Ed.D. March 4, 2010.
PRESENTED BY THERESA RICHARDS OREGON DEPARTMENT OF EDUCATION AUGUST 2012 Overview of the Oregon Framework for Teacher and Administrator Evaluation and.
Florida’s Implementation of NCLB John L. Winn Deputy Commissioner Florida Department of Education.
State Board Update: Accountability System March 2013.
Implementation of the North Carolina Read to Achieve Program CCSA March 25, 2013.
HEE Hui For Excellence in Education June 6, 2012
Campus Improvement Plans Northwest ISD Presentation to the Board of Trustees October 14, 2013.
ESEA Flexibility Waiver Florida’s Proposal November 14,
Quality Assurance Review Team Oral Exit Report District Accreditation Bibb County Schools February 5-8, 2012.
The State Budget  IT’S A BRAND NEW WORLD  Local Control Funding Formula Local Control Accountability Plan (LCAP) Common Core Standards CAASPP:
MEAP / MME New Cut Scores Gill Elementary February 2012.
TPEP Teacher & Principal Evaluation System Prepared from resources from WEA & AWSP & ESD 112.
Connecticut PEAC meeting Today’s meeting Discussion of draft principal evaluation guidelines (1 hour) Evaluation and support system document.
Presented by: Jan Stanley, State Title I Director Office of Assessment and Accountability June 10, 2008 Monitoring For Results.
Noncompliance and Correction (OSEP Memo 09-02) June 2012.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
OEPA West Virginia Board of Education Policy 2320: A Process for Improving Education: Performance- Based Accreditation System RESA 6 – October, 2014 Office.
School Monitoring and OEPA Greg Miller MEL – 540 School Resource Management Spring 2015.
2012 MOASBO SPRING CONFERENCE Missouri Department of Elementary and Secondary Education 1 April 26, 2012.
LCAP Advisory Committee Local Control Accountability Plan - LCAP Steve Hanke, Ed.D., Superintendent Tim McCarty, Ed. D., Asst. Supt Ed. Services Beverly.
Building the Parent Voice
August 2, Welcome Who is the TSD Continuous Improvement Team ? What is the work of the TSD Continuous Improvement Team? What is.
Local Control Funding Formula (LCFF) & Local Control Accountability Plan (LCAP) School Board Meeting, March 20,
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education September 2010.
Indian Education for All History Presented by Jeredene Mayfield Montana’s North Central Education Service Region (MNCESR) February 2007.
Accountability & Program Assessment Governing Board Online Training Module.
INSTRUCTIONAL LEADERSHIP TEAM CAMPUS IMPROVEMENT PLANNING MARCH 3, 2016.
TAKS Release Plan  In 2007 SB 1031 changed the release of tests to every three years  In 2009 HB 3 changed the release of tests to exclude retests 2.
Education.state.mn.us Principal Evaluation Components in Legislation Work Plan for Meeting Rose Assistant Commissioner Minnesota Department of Education.
Diane Mugford – Federal Accountability, ADAM Russ Keglovits – Measurement and Accountability, ADAM Renewing Nevada’s ESEA Waiver Flexibility Request.
Professional Growth and Effectiveness System Update Kentucky Board of Education August 8,
State Board of Education Achievement and Graduation Requirements Committee October 19, 2015.
Kansas Association of School Boards ESEA Flexibility Waiver KASB Briefing August 10, 2012.
Note: In 2009, this survey replaced the NCA/Baldrige Quality Standards Assessment that was administered from Also, 2010 was the first time.
East Whittier City School District 2016 Local Control and Accountability Plan LCAP Community Meeting #3 May 27, 2016.
1 Educational Accountability Act of 2009 (SB09-163) Colorado Department of Education February 6, 2012.
Every Student Succeeds Act of 2015: Highlights and
Overview of SB 191 Ensuring Quality Instruction through Educator Effectiveness Colorado Department of Education Updated: June 2012.
Accountability in ESSA: Setting the Context
Briefing on Development of Performance Frameworks
DISTRICT ACCREDITATION QUALITY ASSURANCE REVIEW
Guide to the Single Plan for Student Achievement
Presentation transcript:

1 Proposed Changes to the Accreditation Process CDE Briefing for the Colorado State Board of Education March 5, 2008

2 Purpose & Timeline Today: Review changes and details of proposed rule February & March: Obtaining input from the field April: Rulemaking hearing April 9 May: State Board adopts accreditation rules at State Board meeting June: State Board approves district accreditation contracts

3 History 1998 Legislature passed Accreditation Act Article 11, 44, 45 of Title 22 Colorado Revised Statues 1999Rules for Accrediting Schools & School Districts 2001School Accountability Reports (SAR) 2001 Accreditation Contracts were submitted 2007 Original Accreditation Contracts expired 2007 Accreditation Contracts were extended for one year (June June 2008)

4 Positive Stakeholder Feedback Statewide presentations conducted – Superintendents in every region – CASB Board – Still to come: PTA and CEA Across-the-board support for proposed changes to Accreditation

5 Focus on service and support Preserve district autonomy but maintain commitment to success for all students Ensure decisions are defensible and comparable across the state Emphasize results, focus on student longitudinal growth Link greater achievement to more autonomy Eliminate duplicative paperwork Provide districts with useful and transparent pre- populated data Intent of Changes to Accreditation Process

6 Proposed changes: A) Five Points of Accountability 1. Student Results- Student Achievement Level (Status) and Growth 2. Student Results- Student Achievement Level (Status) and Growth Gaps 3. Student Results- Post-Secondary Readiness 4. Improvement Plan and Progress Monitoring 5. Compliance with assurances, including safety and finance

7 Proposed changes: B) Longitudinal Growth Place greater emphasis on student longitudinal growth Align accreditation growth measure with the work of the Technical Advisory Panel on Longitudinal Growth

8 Proposed changes: C) Pre-populated Data CDE will provide annual pre-populated data for districts – Use for required annual report to patrons required by law

9 Proposed changes: D) Accreditation Review Timing of Accreditation Reviews will change and depend on student outcomes and need for support – Districts with highest student performance will receive an onsite review every three years – Districts with low student performance will receive an annual onsite review and support – Districts on a two or three year Accreditation Review cycle will receive an annual data summary report, including commendations and recommended actions

10 Proposed changes: E) Accreditation Labels Current: Letter of Concern, Watch, Probation, Non- Accredited Labels under consideration: 1. Accredited with Distinction 2. Accredited 3. Accredited, Letter with Support 4. Accredited, Notice with Support 5. Probation, (may lead to loss of Accreditation) 6. Non-Accredited

11 Proposed changes: F) Early Warning System Develop an early warning system based on student outcomes to identify districts needing support prior to steps toward corrective action

12 How Accreditation will Work Accreditation Contract State and district reporting Accreditation review Education Improvement Plan

13 Accreditation Contract Standards, goals, assessments, strategies Periodic review cycle for each school Recognition of high performing schools and intervention for low-performing schools Procedures for placing schools on corrective action cycles Involvement of families, business, local advisory committees, district and school advisory accountability committees

14 Contract Assurances Participation in all state assessments Adequate policies implemented in compliance with state requirements Compliance with budgeting, accounting, and reporting requirements Principal professional development conducted Right to display the flag of the United States Adoption of model content standards

15 Reporting Obligations State provides an annual report to district Data tables that meet or exceed Accreditation and NCLB reporting requirements Districts report to state and public CSAP results (growth and status) disaggregated and trends, including third grade Percentage of students taking AP courses, IB, postsecondary enrolled Numbers of expelled and suspended students Graduation rates & dropout rates Percentage of students not taking CSAP District budget, revenues, and expenditures ACT results Attendance rates Graduation requirements Evidence of a safe, civil learning environment Number and identity of schools in each accreditation category Additional local indicators

16 Accreditation Review Annual review streamlined to focus on student results: growth, status, gaps, and postsecondary readiness Annual review of assurances on finance and safety Subsequent review of other assurances and district improvement plan if warranted by results

17 Education Improvement Plan Best educational practices High goals for student achievement Recognized instructional strategies Standards-based instruction Use of state and local assessments Promote postsecondary readiness Incorporate parent, student and community participation Assurance that policies implemented in compliance with state requirements