Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1.

Slides:



Advertisements
Similar presentations
Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
Advertisements

1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
VERSITET ROBERT STEPHEN BREWER POSTDOC AARHUS UNIVERSITY 29. AUGUST 2014 UNI An Introduction to the 15/5 Report.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
COVER LETTERS. PURPOSE To explain why you are sending your resume  Never send a resume without a cover letter, unless you are explicitly asked not to.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Laboratory Quiz & Data Analysis and Presentation for Written.
Writing SPSS Reports. Assumptions You have taken 100W You achieved basic competence in writing in 100w You have basic competence using a word processing.
Engineering H193 - Team Project Spring Quarter 2005 Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode (Performance.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Group Project CVEN Mixing and Transport in the Environment. A River Dye Study.
Engineering H193A - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2004 Engineering H193A Demolding of Chips Using Inventor for.
READ THIS SLIDE CAREFULLY The intent of this presentation is to provide an “Executive Summary” of your project to Design Day attendees and judging panel.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2.
Copyright © 2003 Center for Farm Financial Management, University of Minnesota Business Plan Once the research is complete, questions answered, and strategy.
MdH/IDt1March 11, 2003 Software Engineering Lesson 8 Project preparation Andreas Sjögren.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Lecture on Oral Presentations Week 7 Day 1.
Advanced Technical Writing
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition Performance Review Week 3 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Advanced Technical Writing Lecture 8 Memorandums 29 June 2008.
Engineering H193 - Team Project Spring Quarter2005 Gateway Engineering Education Coalition P. 1 Lecture on Oral Presentations Week 7 Day 1.
Human Services Practicum
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Week 6 Day 2 Lecture on and Examples of Electrical Circuits.
MEETING MINUTE TAKING – THE BASICS May 20, 2014 Presented by: Amy Gurren, CAP-OM.
David Hammitt SBI Coordinator. Agenda Consulting Project Procedure – Guidelines – How to Resources Project Allocation.
Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior.
Cover Letters aka Application Letters. Purpose of a Cover Letter  Provides a snapshot of your personality  Conveys professionalism  Demonstrates written.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
© 2003 IBM Corporation July 2004 Technology planning for not-for-profit organizations IBM volunteer name Title, organization.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Data Analysis and Presentation for Written and Oral Reports.
Assignment 8 information
You and Your Resume The CV and the Portfolio. Preamble What is your job or career goals? What is the purpose of your cover letter and resume? Who is the.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
Electronic Engineering Department Final Year Projects September 2008.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Advanced Technical Writing Lecture 4 Memorandums.
Scientific Communication
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
DESIGN PROPOSAL REPORT. Why write a proposal? Basic means of convincing someone to support a project. Important tool for organizing time and resources.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Samples from Team Working Agreements Design Process – Mockups.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
The Art of Letter Writing. In Context Assess your abilities. Research & evaluation jobs. Define your objectives.
Getting Useful Reviews
Parts of a Report. Feasibility Reports An outline of a feasibility report may look something like this: Project overview Market Budget Survey Results.
Eng. Technology Project SE 101 LACC Team #. NOTE The following is just a model. You are not limited to it. You are welcome to expand it as much as you.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
How to Write a Cover Letter Revised April What is a Cover Letter? A cover letter is a letter sent alongside your resume to introduce yourself, explain.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
11 Proposals and Formal Reports. Introduction Proposals o Informal o Formal Research Writing Formal Reports Elements of Formal Reports.
HU113: Technical Report Writing
ECE361 Engineering Practice
Performance Review Week 3 Day 3 Spring Quarter.
How to Write a Cover Letter
Advanced Technical Writing
Performance Review Week 3 Day 3 Spring Quarter.
Team Tips #2 Working in Teams.
Advanced Technical Writing
Memorandum/(a) (also more commonly memo) is a brief written record or communication, commonly used in business, government, and educational organizations.
Project Overview.
Periodic Accounting Review Periodic Revenue Reconciliation
Presentation transcript:

Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1

Engineering H193 - Team Project Spring Quarter 2003 P. 2 Progress Reports REMEMBER: You are writing the report for the reader WHAT THE SPONSOR WANTS TO KNOW ABOUT YOUR PROJECT –Done right –On schedule –Within budget

Engineering H193 - Team Project Spring Quarter 2003 P. 3 Project Progress Report Purpose –Inform Clients (faculty in this case) on Project progress –Provide record of work done for billing purposes Things to remember –No surprises –Clear and Concise Approximately 4-6 pages - Use Word Processor, CADD, Spreadsheet, etc. Not hand written

Engineering H193 - Team Project Spring Quarter 2003 P. 4 Progress Report (cont.) Written Report –What has been accomplished –Reference Team Decisions –Reference Design Schedule - Ahead, Behind? Use your schedule and highlight tasks done –Reference Sketches/Drawings (copies) attached –Reference Budget Page (copies) attached –Future Plans

Engineering H193 - Team Project Spring Quarter 2003 P. 5 What to Include in a Progress Report Cover Page –Title –Team Number/Name and Members (seat nos.) Have you established a team name? –Date and Instructor –Do it once and keep the template (If you have not yet created a cover page.)

Engineering H193 - Team Project Spring Quarter 2003 P. 6 What to Include in a Progress Report Opening Paragraph –Name of Project –Who’s doing it –Reporting period Executive summary (optional on short reports)

Engineering H193 - Team Project Spring Quarter 2003 P. 7 What to Include in a Progress Report Main Body –Outline what has been done –Demonstrate quality of project –Say what has been considered –Explain decisions –Discuss problems and solutions Schedule (Modify design schedule - attach copy) –Can list what tasks are complete –Better to include schedule with tasks highlighted

Engineering H193 - Team Project Spring Quarter 2003 P. 8 What to Include in a Progress Report Budget (Make a budget page and attach copy) –Planned - use estimates for items, contingencies –Spent to date Future plans –What is to be done in next reporting period - nominally next two weeks

Engineering H193 - Team Project Spring Quarter 2003 P. 9 Practical Hints for Dealing with Sponsors Never mislead a sponsor Never let a sponsor get bad news about your project from someone else If progress report contains bad news, tell sponsor about it before sending progress report No surprises for sponsor Make sponsor look good - particularly to his/her supervisor

Engineering H193 - Team Project Spring Quarter 2003 P. 10 Assignment Work on progress report – Due Friday April 25 th Continue with your chassis (chassis w/ wheels under power to go up the ramp due on Friday) Wednesday's lecture will be Final Report Special Lecture on Wednesday –Tips and Hints for writing robot control code