1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

The Detector Control System – FERO related issues
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
André Augustinus 16 June 2003 DCS Workshop Safety.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
André Augustinus 16 September 2002 Safety issues.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
DETECTOR CONTROL SYSTEM FOR THE ALICE EXPERIMENT AT CERN -LHC Anik Gupta ICTDHEP JAMMU 11 th September 2013 Special Thanks to the ALICE CONTROLS COORDINATION.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
PVSS an industrial tool for slow control
CMS – The Detector Control System
The LHCb Run Control System
TPC Detector Control System
Philippe Vannerem CERN / EP ICALEPCS - Oct03
Experiment Control System
Presentation transcript:

1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo, S.Popescu, R.Vand Der Vlugt and the ALICE Collaboration

2 Outline u Context u Architecture u System implementation u Schedule & milestones, status today u Responsibilities, cost

3 Controls Context DCS ITS hv lv p TT pixeldriftstrip TPCMUON Detectors Services power cooling gas magnets infrastructure safety access External Systems ECS LHC DAQ Trigger HLT Ctrl

4 Hardware architecture Supervisory layer Sensors, devices Field-buses, nodes PC-PCI/W-Linux, PLC, VME, etc. Communication (OPC, DIM) SCADA (PVSS) Technologies Framework Layers Structure User applications Process control layer Field layer Supervisory consoles Experimental equipment DCS LAN WAN Other systems: TRG, DAQ, etc. Configuration DB, Archives, Log, etc. PLC VME Field-bus DCS LAN Node Storage

5 Software architecture (1) sub-sys 1 device a Control Units Device Units To physical devices sub-det B detector sub-det A sub-sys 2 device b … … gas DCS ECS power sub-det Esub-det D … … … racks sub-sys 1sub-sys 2 device e …

6 Software architecture (2) PVSS CU Behaviour (FSM) configuration archiving Partitioning Alarm handling access, ownership dB operator parent child commands states PVSS FSM interface configuration archiving Alarms device driver access, ownership dB operator parent settings readings device Partitioning OFF ERROR ON STAND BY GO_STANDBY GO_READY GO_STANDBY RESET Alarm GO_OFF CONFIG RAMP_UP RAMP_DW

7 Back-end and front-end components Field-bus Front-end application DEVICE DRIVERS DEV 1DEV 2 COMMUNIC DCS Front-end DB access ALARM PVSS CONFIG ARCHIV WEB ARCHIV COMMUNIC FSM DCS Back-end DCS network CONDIT PVSS CONFIG FEE CONFIG User application Process layer Field layer Supervisory layer

8 Distributed PVSS system UIM CtrlAPI EVM DBM DB UIM DCS Dist … … UIM CtrlAPI EVM DBM D D D DB UIM … SSD UIM CtrlAPI EVM DBM D D D DB UIM TPC UIM CtrlAPI EVM DBM D D D DB UIM … TRD operator DEVICE

9 DCS Sub-detectors FC TOF SPDSDDSSD TPCTRDZDCPMDHMP RO ITSPHO CPVCAL FMDV0T0 TRATRI MUCOSEMC Common solutions ~10 Common ~10 Specific

10 PVSS CU Behaviour (FSM) configuration archiving Partitioning Alarm handling access, ownership dB operator PVSS FSM interface configuration archiving Alarms device driver access, ownership dB operator device Partitioning Agreed set of standard devices Standard interfaces – OPC, DIM Common tools OFF ERROR ON STAND BY GO_STANDBY GO_READY GO_STANDBY RESET Alarm GO_OFF CONFIG RAMP_UP RAMP_DW Standard FSM’s What is a common solution?

11 HV & LV Common solution Console PC Server PC Power supply 1 Detector equipment CANbus or ethernet DCS LAN firmware Power supply n firmware Power supply 2 firmware … PS OPC-server PVSS OPC-client OPC standard PS proprietary Supervisory application using FSM and PVSS

12 SPD HV control panels

13 Common solution for FEE ALICE CONTROL ROOM PVSS console Common interface? many different FEE architectures ON DETECTOR VME SPD FEE JTAG HMPID FEE DDL TPC FEE ETHERNET TRD FEE ETHERNET … MXI … Front End Device (FED) DIM server interfaces FEE H/W MXI DDL ETHERNET Etc. FEE specific FEE common DIM client

14 ALICE CONTROL ROOM ON DETECTOR CAVERN COUNTING ROOMS Devices Sensors Devices Sensors Devices Sensors Services: PLC process control applications Fieldbus or direct I/O DCS LAN supervisory applications Power & racks Cooling Gas Magnets Safety (DSS)

15 Oxygen deficiency Dead-man device Fire brigade to point 2 Secure the zone CERN Safety Alarm Monitoring (CSAM) Flooding Evacuation alarm Gas detection Emergency call Blocked lift Emergency stop Fire/ smoke Level 3 alarms Safety actions Cut equipment gracefully Cut a single rack DCS Infrastructure Front-end electronics Cooling & gas Temp Power supplies Experiment equipment DCS actions Safety systems Cut group of racks Interlock spec. equipment Detector status Water leak Power status Temp Cooling water Experiment environment DSS alarm actions DSS Redundant PLC’s DSS system I/O units Hardwired interlock

16 Pre-installation on surface Final installation in UX Commissioning Schedule & Milestones HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG/HLT M1 M2 HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG/HLT M3 M4 Individual detectors Groups of detectors Whole experiment M5M6M7M8

17 Status today (1) u Back-end system u All main components are available in prototype form u An ALICE back-end system is being prototyped u Detector applications u Requirements defined to ~70% (URD’s) u Prototypes; u ~ 10% 1 st version implemented u ~ 70% started u ~ 20% not started or unknown

18 Status today (2) u Services applications u Power & rack control: prototyping started u Cooling control:prototyping started u Gas control: TPC prototype ready u Magnet control: 1 st prototype installed u Safety:1 st prototype being installed u Infrastructure:requirements being defined u Interface to external systems u Interface to 1 st implementation TRG/DAQ/HLT:via ECS tested

19 RESPONSIBILITIES Overall coordinationCERN Alice Controls Coordination (ACC) Basic software toolsCERN JCOP project (IT, EP departments) Back-end systemCERN Alice Controls Coordination (ACC) ServicesCERN ST, EP, IT departments DetectorsDetector groups COST DCS infrastructure514 kCHF ServicesMagnets664 kCHF Power, cooling, gas660 kCHF Safety, site infrastructure240 kCHF Total2078 kCHF