TS&SD Transmission Business Experience in Unification of Engineering Standards & Specifications 27 October 2008 LASTPREVIOUS NEXT.

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

Strategic Planning Update For Board Meeting December 5, 2007.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
Chapter 2 Analyzing the Business Case.
©2007 by the McGraw-Hill Companies, Inc. All rights reserved. 2/e PPTPPT.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year /9 De Montfort University.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Analyzing the Business Case
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Basic Research Administration Principles Presented by Ronald Kiguba Research Coordinator, Makerere Medical School.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Construction Industry Development Board development through partnership Procurement procedures and quality 2b.
System of Public Procurement in Turkmenistan
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
State Information Technology Agency Presentation to Portfolio Committee on Home Affairs.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
Presentation on the Corporate Planning Department
National Development Plans Review Saudi Arabia 3 rd and 7 th National Development Plans For: Professor Habib Alshuwaikhat By: Ahmad A. Alkadi CP202 – Planning.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
SANEDI. INDEX  KEY ACTIVITIES DURING FINANCIAL YEAR  DISCUSSIONS ON KEY ACTIVITIES  CONCLUSION  APPRECIATION.
NETWORK PERFORMANCE DEPARTMENT. OUTLINE OF PRESENTATION MISSION VISION STRUCTURE STRATEGIC OBJECTIVE STAFF STRENGHTH ON-GOING ACTIVITIES AND INITIATIVES.
1 Introduction of Research and Development Project Evaluation System at NEDO Momoko OKADA New Energy and Industrial Technology Development Organization(NEDO)
THE NEW DIMENSIONS OF THE EUROPEAN PUBLIC PROCUREMENT POLICY Christian SERVENAY DG MARKT/Unit C1.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Session 3 CPDP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
Internal Sales Policy and Procedure Updates. Agenda o Policy o Procedures o Roles & Responsibilities o Definitions o Questions & Answers anytime during.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Standards Coordination Office NIST presentation to the FGDC September 25, 2014.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
Stages of Research and Development
Structure and Responsibility
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Roadmap to Enhanced Technical Regulations of WMO
Kincaid Hall Renovation
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
IEEE Participation in NFPA (SCC-18) UL Participation Opportunities
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Ministry of National Economy of The Republic of Kazakhstan
Presentation transcript:

TS&SD Transmission Business Experience in Unification of Engineering Standards & Specifications 27 October 2008 LASTPREVIOUS NEXT

TS&SD Contents 2 FIRSTPREVIOUS NEXT 1. Background. 2. Standardization. 3. Objectives of Unification. 4. Process of Unification. 5. Major difficulties in Unification and Solutions. 6. Achievements. 7. Implementation of Unified Standards & Specifications. 8. Conclusion.

TS&SD 1- Background  The Electricity Companies before the merger:  Four (4) Saudi Consolidated Electricity Companies in the Central, Eastern, Western and Southern Regions  Ten (10) small companies operating in the north of the Kingdom.  All electricity operations which were managed by the General Electricity Corporation.  After the merger on 5 th of April 2000: Saudi Electricity Company (SEC) 3 FIRSTPREVIOUS NEXT

TS&SD 1- Background 3

TS&SD 2- Standardization The responsibility of standardization process was entrusted to Transmission Standards and Specifications Department.  Role description:  Prepare, develop, review and approve the Standards and Specifications for transmission assets for use in the Design and Engineering not limited to transmission lines and substation facilities. 4 FIRSTPREVIOUS NEXT

TS&SD 2- Standardization (cont.)  Coordinate with Transmission Operational Departments/ Divisions for development of agreed Standards for operations, maintenance and protection.  Undertake detailed research into the best engineering practices for design of transmission assets.  Update and issue Transmission Standards to reflect improvements in equipment selection and in engineering/ construction practices. 5 FIRSTPREVIOUS NEXT

TS&SD 3- Objectives of Unification.  Study existing Transmission Engineering Standards Documents and code of practices adopted by all the regions of SEC and General Electricity Corporation, recommend improvements and up gradation for unification in light of SEC mission statement.  Unify & prepare common Material Specifications, Engineering and Construction Standards for Transmission Network of SEC for Kingdom wide application. 6 FIRSTPREVIOUS NEXT

TS&SD 3- Objectives of Unification (cont.)  Develop the unified standards and specifications using the various common parameters and value engineering logics giving emphasis to reliability, safety, quality, economy, availability and feasibility of requirements.  Propose directives and approve policies, procedures and practices that pertains to the Engineering Standardization and safety of SEC Transmission Network. 7 FIRSTPREVIOUS NEXT

TS&SD 3- Objectives of Unification (cont.)  Ensure compliance with specified applicable Saudi Standards (SASO), Saudi Arabian Grid Code and International Industry Standards.  Ensure strict compliance to applicable Material Specifications, Engineering Standards and Construction Standards developed under the patronage of Transmission Business. 8 FIRSTPREVIOUS NEXT

TS&SD 4- Process of Unification  Collect information and conduct technical analysis and evaluation of existing code of practices and standards of all SEC operating areas and General Electricity Corporation.  Prepare drafts of unified Standards and Specifications and circulated to various concerned Departments/ Divisions within the company and outside to selected Manufacturers and Contractors.  Analyze comments received from various concerned Departments/ Divisions, Manufacturers and Contractors. 9 FIRSTPREVIOUS NEXT

TS&SD 4- Process of Unification (cont.)  Resolve and finalize all comments and issue clarification letters if required.  Conduct presentations periodically to review and highlight significant issues raised on standards and specifications already circulated to the concerned Departments/Divisions.  Review and approve all the proposed Transmission Engineering Standards Documents and upload them on SEC intranet for Kingdom wide applications. 10 FIRSTPREVIOUS NEXT

TS&SD 5- Major difficulties in Unification and Solutions  Resist to change from existing code of practices and engineering standards and specifications. Solution: Present the advantages of unification to concerned Departments/ Divisions and welcome their participation in the unification process.  Various system parameters and Service conditions. Solution: Issued the 01-TMSS-01 “General Requirements for all equipments/ materials” after extensive research, surveys, reviews and discussions by concerned Departments/Divisions of SEC operating areas.01-TMSS FIRSTPREVIOUS NEXT

TS&SD 5-Major difficulties in Unification and Solutions (cont.)  Non-availability of documented engineering standards and specifications in appropriate format in some SEC operating areas and General Electricity Corporation. Solution: Surveyed and collected any available documented code of engineering practices in whatsoever shape available from all SEC operating areas and General Electricity Corporation. After thorough evaluation, came up with unified standards and specifications and code of practices. 12 FIRSTPREVIOUS NEXT

TS&SD  Different requirements in all operating areas of SEC and General Electricity Corporation due to the different environmental conditions and operational/maintenance practices. Solution: Studied and analyzed the different requirements and applicable standards in all operating areas of SEC and General Electricity Corporation and came up with consensus requirements after an extensive technical and economical evaluation. 5-Major difficulties in Unification and Solutions (cont.) 13 FIRSTPREVIOUS NEXT

TS&SD  Technical references were not available with some Departments/Divisions to review the draft of Standards and Specifications. Solution: Provided on-line access to international industry standards references such as IEC, IEEE, ANSI, ASTM, ASCE, ACI, NEMA & NFPA,data bases of electronic books, technical journals from KNOVEL, EBSCO, THOMSON GALE, engineering documents and code of practices available to all technical staff of SEC. The advanced technical information center provides all necessary technical information in hard copy and in addition to the above electronically. 5-Major difficulties in Unification and Solutions (cont.) 14 FIRSTPREVIOUS NEXT

TS&SD  Not receiving comments/feedbacks on circulated Drafts of Standards & Specifications on target date. Solution: With Executive Management support and follow up, encourage and invite Departments/Divisions to participate and share their engineering expertise within a given time to realize SEC mission statement and objective conclusively. 5-Major difficulties in Unification and Solutions (cont.) 15 FIRSTPREVIOUS NEXT

TS&SD 6- Achievements Transmission Material Standard Specifications TMSS99 Transmission Engineering StandardsTES84 Transmission Construction StandardsTCS22 Transmission Standard DrawingsTSD12 Saudi Electricity Company Engineering Drawings Standards SEEDS1 TOTAL FIRSTPREVIOUS NEXT

TS&SD TMSSTESTCSTSDSEEDSTOTAL APPD DRAFT TOTAL APPD %84%80%63%33%50%74% 6- Achievements (Cont.) 17 FIRSTPREVIOUS NEXT More Info.More Info.

TS&SD 7- Implementation of Unified Standards & Specifications  The unification of standards and specifications in Saudi Electricity Company Transmission Business is considered as a milestone achievement as these are now implemented in all substations and transmission lines projects of SEC kingdom wide.  The standards developed so far are being implemented/ incorporated during prequalification of manufacturers, preparation of Scope of Work/ Technical Specifications for capital projects, direct purchase of equipment, tenders evaluation, contractors technical submittal, execution and commissioning of projects. 18 FIRSTPREVIOUS NEXT

TS&SD 7- Implementation of Unified Standards & Specifications (cont.)  In the case of deviation to standards, waiver request is initiated and submitted to SEC-TS&SD for review and approval based on its merit and technical justification.  Likewise, the new list of technically pre-qualified and acceptable manufacturers for materials/equipment is strictly implemented in all projects to ensure the quality and reliability of materials/ equipment procured and used in the projects. 19 FIRSTPREVIOUS NEXT

TS&SD 8. Conclusion  Development/update of standards is a continuous improvement process. TS&SD is continuously searching for new and best practices to be adopted for the enhancement of standards and specifications keeping in mind the best value engineering practices whenever available.  Any new amended/ modified requirements are brought in and specified in the scope of work/ technical specifications of the proposed project until such time that the standards and specifications are updated/revised. 20 FIRSTPREVIOUS NEXT

TS&SD 8. Conclusion (cont.)  Streamline the unification process for standardization of engineering practices by adopting the international norms for kingdom wide application in transmission network.  Affective implementation of unified standards needs Management support to establish an independent quality control system for the transmission projects. 21 FIRSTPREVIOUS NEXT

TS&SD Thank You FIRSTPREVIOUSNEXT